A new home in St. Croix County, Wisconsin needs a building permit from the municipality or other local UDC enforcing authority before construction begins1. St. Croix County still issues sanitary permits, including for properties inside cities and villages, while county general zoning covers most unincorporated areas but not Forest, Hudson, St. Joseph or Troy2,3.
Do you need a building permit in St. Croix County, Wisconsin?
Yes.
Yes. New one- and two-family homes in St. Croix County must follow Wisconsin's statewide Uniform Dwelling Code1. Construction may begin only after plans are approved and the building permit is issued and posted1. The enforcing authority may be a municipality, county or state agency, and requirements for additions and alterations can vary by municipality1. If the project uses private septic, obtain the sanitary permit before the local municipality can issue its building permit2. Each construction phase must be inspected before the work is covered1. An owner who occupies or will occupy the finished home may take out the construction and erosion-control permits, but owner-builder status does not remove code, inspection or other approval requirements1.
Who issues building permits in St. Croix County, and how do you reach them?
Start with the town, village or city where the parcel lies for the building permit, because Wisconsin allows UDC enforcement by municipal or county inspectors or by the state.
Start with the town, village or city where the parcel lies for the building permit, because Wisconsin allows UDC enforcement by municipal or county inspectors or by the state1. Inside New Richmond, the city issues residential building permits6. St. Croix County Community Development separately handles sanitary permits countywide and county zoning, shoreland, riverway and floodplain matters where those county rules apply; call 715-386-4680 or email cdd@sccwi.gov3,7,8. County land-use applications require fees at filing, are generally non-refundable, and a late application can cost double the normal fee9. County land-use applications are due on the first Monday of the month, and staff strongly recommend a pre-application meeting7. Building-permit fees vary by municipality, so request the current requirements and fee schedule from the actual enforcing authority10.
Does St. Croix County have zoning?
St. Croix County general zoning covers all towns and unincorporated areas except Forest, Hudson, St. Joseph and Troy; county shoreland, floodplain, land-division, riverway and sanitary rules still apply across all townships.
St. Croix County general zoning covers all towns and unincorporated areas except Forest, Hudson, St. Joseph and Troy; county shoreland, floodplain, land-division, riverway and sanitary rules still apply across all townships3,4. Cities and villages, including New Richmond, North Hudson, Roberts and the village of Baldwin, enforce their own zoning codes4,11,12,13. We could not confirm separate zoning codes for the four excluded towns; ask the relevant town office before buying4. Where county zoning applies, Chapter 15 sorts land into base districts AG-1, AG-2, R-1, R-2, R-3, C-1, C-2, C-3, I-1, I-2 and CON, plus shoreland, Lower St. Croix Riverway, floodplain and non-metallic mining overlays, so the district decides what you can build14. Every dwelling, including a manufactured home, needs at least 500 square feet of floor area per family5. Minimum lot area and setbacks vary by district and design3,14. Shoreland rules generally require a 75-foot setback from the ordinary high water mark, subject to exceptions and averaging15. Private septic approval stays with St. Croix County Community Development, including inside cities and villages2,8.
How do septic permits work in St. Croix County?
A new private onsite wastewater treatment system needs a State Sanitary Permit, while repair, reconnection, rejuvenation or installation of non-plumbing sanitation needs a County Sanitary Permit.
A new private onsite wastewater treatment system needs a State Sanitary Permit, while repair, reconnection, rejuvenation or installation of non-plumbing sanitation needs a County Sanitary Permit2. Only a licensed plumber may submit the sanitary application, the permit must precede the local building permit, and county staff inspect sanitary-permit work at least once2. Private systems must also be serviced or inspected at least every three years unless a management plan says otherwise2. A privy or composting toilet is therefore not a permit-free off-grid workaround2. Only about 15% of county soils rate free of severe limits for a conventional drain field, so investigate soil and system feasibility before treating a lot as buildable16. St. Croix County Community Development administers POWTS permits and maintenance tracking; call 715-386-4680 or email cdd@sccwi.gov8.
Can you live in an RV or tiny home on your land in St. Croix County?
Where county General Zoning applies, one camping unit on vacant land or beside a principal dwelling may generally be occupied or used for no more than 14 nights or days in a 60-day period.
Where county General Zoning applies, one camping unit on vacant land or beside a principal dwelling may generally be occupied or used for no more than 14 nights or days in a 60-day period5. A seasonal land-use permit can instead allow one camping unit on a vacant parcel from May 15 through September 15 if it has a state sanitary system and yearly sanitary reconnection permit; seasonal travel trailers are barred in major subdivisions5. During construction, a one-year land-use permit can allow a camping unit or manufactured home when the owner holds building and sanitary permits and connects it to a legal sanitary system5. Residential occupancy must stop when the principal home is capable of occupancy, and the manufactured home must be removed when the residence becomes occupied5. The county ordinance has no separate tiny-home category: a tiny home used as a dwelling must have at least 500 square feet per family5, while a portable structure that qualifies as a camping unit follows the camping limits5. County camping and dwelling-size provisions do not establish the answer for Forest, Hudson, St. Joseph, Troy or incorporated municipalities; ask the town or municipal zoning office4,5.
Building a home in St. Croix County: the steps, in order
Identify the parcel's zoning authority; county general zoning excludes Forest, Hudson, St. Joseph and Troy, while cities and villages use their own codes.
- Identify the parcel's zoning authority; county general zoning excludes Forest, Hudson, St. Joseph and Troy, while cities and villages use their own codes3.
- Confirm the district's allowed use, minimum lot area, setbacks, height and utility requirements before finalizing the site plan3,5,14.
- Secure the required well approval if the home will use a private well1.
- Have a licensed plumber submit the county sanitary-permit application, because that sanitary permit must precede the local building permit2.
- File building plans, documents, fees and prerequisite approvals with the municipality or its authorized UDC inspection agency10.
- Begin only after building-plan approval and building-permit issuance, then request each building inspection before covering the work1.
- Occupy after the final inspection finds no major health or safety violation; some municipalities also issue occupancy permits1.
What should you check before buying land in St. Croix County?
Confirm who zones the parcel first, because Forest, Hudson, St. Joseph and Troy fall outside county general zoning and every city or village enforces its own code; county sanitary rules and the county's township-wide land-division and overlay programs remain relevant.
Confirm who zones the parcel first, because Forest, Hudson, St. Joseph and Troy fall outside county general zoning and every city or village enforces its own code; county sanitary rules and the county's township-wide land-division and overlay programs remain relevant3. If a seller proposes a new split, a survey and both town and county review may be required; creating 1-4 parcels within five years is a minor subdivision, while 5 or more is a major subdivision17. Check septic feasibility early because only about 15% of county soils rate free of severe limits for a conventional drain field16. Check flood maps before choosing a building site, because county-regulated floodplain development requires review and flood-resistant construction18. A driveway connecting to a state highway requires a WisDOT connection permit19. Renting a principal dwelling short-term requires an annual tourist rooming house license, locally issued by St. Croix County Public Health5.
Watch-outs
- County general zoning excludes Forest, Hudson, St. Joseph and Troy, but that does not establish an absence of town zoning; ask the relevant town office which rules govern the parcel4.
- A privy or composting toilet still requires a County Sanitary Permit, so off-grid sanitation is not permit-free2.
- We could not confirm a countywide accessory-dwelling allowance, lot-coverage limit or general agricultural exemption; ask St. Croix County Community Development which requirements apply to the parcel7.
Sources
19 official pages, each quoted and re-checked · written October 16, 2026
- Wisconsin’s Uniform Dwelling Code
- Sanitary Program
- Land Use & Zoning FAQ
- Land Use and Zoning
- St. Croix County, Wisconsin Code of Ordinances, Chapter 15 Zoning
- New Richmond: Construction Guide: One & Two Family New Home Building Permit Process (St. Croix County)
- St. Croix County Community Development Department (sccwi.gov)
- St. Croix County Community Development Department (sccwi.gov)
- CDD Fees & Policies
- Wisconsin Administrative Code SPS 302.34 (Wisconsin statewide rule)
- New Richmond: City of New Richmond Municipal Code (St. Croix County)
- Village of North Hudson: Code of Ordinances, Sec. 98-31, One-family and two-family residence districts (St. Croix County)
- Village of Roberts: Sec. 70-110. Rs-6 Single-Family Residential District (St. Croix County)
- Chapter 15 — Zoning
- Wisconsin’s Shoreland Management Program (Wisconsin statewide rule)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Land Division
- Chapter 18 Floodplain Zoning
- State highway connection permits (driveways & more) (Wisconsin statewide rule)
Written October 16, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in St. Croix County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.