A building permit is required for a new one- or two-family home in Columbia County, Wisconsin, under the statewide Uniform Dwelling Code, and the town or its inspection agency generally issues it1. County zoning approval applies only in unincorporated towns that adopted the county ordinance2. Septic permits for every address in Columbia County, city, village or town, come from Columbia County Planning & Zoning3,4.
Do you need a building permit in Columbia County, Wisconsin?
Yes.
Yes. Wisconsin's Uniform Dwelling Code applies statewide to new one- and two-family dwellings, and construction may begin only after plans are approved and the building permit is issued and posted1. Cities, villages and towns generally handle construction permits and inspections when they have delegated authority; the responsible authority can differ by municipality1,7. Most Columbia County towns listed in the county permit guide use General Engineering Co. for the town building permit and Uniform Dwelling Code inspection8. The county zoning permit is not a substitute for the building permit, which the affected town issues3. Building permit rules for additions and alterations vary by municipality, so ask the town or its inspector before starting that work9.
Who issues building permits in Columbia County, and how do you reach them?
The building-permit contact depends on the municipality, because Wisconsin cities, villages and towns generally exercise jurisdiction over new-home construction and inspection when authorized.
The building-permit contact depends on the municipality, because Wisconsin cities, villages and towns generally exercise jurisdiction over new-home construction and inspection when authorized1. Columbia County's permit guide lists General Engineering Co. at (608) 742-2169 for the town building permit and Uniform Dwelling Code inspection in most county towns8. Columbia County Planning & Zoning, at 112 E. Edgewater Street, Portage, WI 53901, handles the separate county zoning permits and sanitary (septic) permits; call (608) 742-9660 or email planning.zoning@columbiacountywi.gov4,10. The county warns applicants that other federal, state, county, town or local approvals may also be required, so identify every permitting authority before filing10.
Does Columbia County have zoning?
It depends on the town.
It depends on the town. Columbia County's general zoning ordinance applies only in the portions of unincorporated Columbia County where the town board adopted it; cities and villages are outside that jurisdiction, while floodplain and shoreland-wetland rules may apply independently2. A town outside county zoning may be unzoned or administer its own ordinance11. Where county zoning applies, the official map divides land into districts with different standards2. For example, the county table sets a five-acre minimum for agricultural use or vacant land and a one-acre minimum for a preexisting residence in the A-1 and AO-1 districts; other districts differ, including 1 acre in A-2 and A-3 and 20,000 square feet in RC-12. Where county zoning applies, a county zoning permit is decided in writing within 30 days of a complete application unless a parallel process such as a conditional use permit takes longer3. A limited zoning-permit exception covers agricultural structures that are nonhabitable, readily removable, not permanently affixed, outside the shoreland zone, and not a roadside stand or sign2.
How do septic permits work in Columbia County?
A county sanitary permit is required before a private sewage system is installed, replaced, reconnected or modified anywhere in Columbia County, including inside the cities and villages, and the application goes through Columbia County Planning & Zoning.
A county sanitary permit is required before a private sewage system is installed, replaced, reconnected or modified anywhere in Columbia County, including inside the cities and villages, and the application goes through Columbia County Planning & Zoning3. The permit expires two years after issuance if the system is not installed and approved3. A building permit for a new dwelling using private onsite wastewater cannot be issued until the sanitary permit has been issued9. The county publishes sanitary-permit fees, while the amount depends on the applicable fee listing and project4. Soil suitability deserves early attention: only about 6.9% of Columbia County soils rate free of severe limits for a conventional drain field, so get the site evaluated before finalizing the house location or budget5. Under the county ordinance, every septic tank must be visually inspected or pumped within three years of installation and at least every three years after that, unless an inspection finds less than one-third of the tank occupied by sludge or scum12.
Can you live in an RV or tiny home on your land in Columbia County?
We could not confirm a Columbia County rule that generally allows long-term RV or tiny-home occupancy on a private lot; ask Planning & Zoning for zoning questions and the town that governs the parcel for its building permit.
We could not confirm a Columbia County rule that generally allows long-term RV or tiny-home occupancy on a private lot; ask Planning & Zoning for zoning questions and the town that governs the parcel for its building permit10. In a county-regulated campground, the same party may not occupy one camping unit for more than six continuous months in any twelve-month period, and state rules may shorten that period2. That campground rule does not establish permission to live in an RV elsewhere. County-regulated mobile or manufactured home parks impose a minimum thirty-day site-rental period and require homes to be used as dwellings and skirted2. A new manufactured-home installation is also covered by the statewide Uniform Dwelling Code; occupancy follows a final inspection without major health or safety violations1,9.
Building a home in Columbia County: what are the steps, in order?
Ask Columbia County Planning & Zoning which zoning jurisdiction and district cover the parcel, then check floodplain and shoreland constraints.
- Ask Columbia County Planning & Zoning which zoning jurisdiction and district cover the parcel, then check floodplain and shoreland constraints2,10.
- Get the soil evaluated and secure the county sanitary (septic) permit before seeking the town building permit for a home using private sewage9,12.
- Obtain access approval from the road authority; a county-highway driveway permit covers construction, repair or improvement, while WisDOT permits state-highway connections13,14.
- Where county zoning applies, submit the county zoning permit application with the form, owner signature, deed or legal description, and review fee15.
- Allow for a written zoning decision generally within thirty days; parallel reviews can take longer15.
- File the Uniform Dwelling Code building permit application with the responsible town or inspection agency after prerequisite approvals8,16.
- Schedule inspections before work is covered and occupy only after a satisfactory final inspection9.
What should you check before you buy land in Columbia County?
Confirm the parcel's town and zoning authority before relying on a proposed use, lot size or setback.
Confirm the parcel's town and zoning authority before relying on a proposed use, lot size or setback2,10. Near navigable water, buildings and structures generally must be at least seventy-five feet from the ordinary high water mark, subject to listed exceptions and setback averaging17. Check floodplain status early with Planning & Zoning, since county floodplain rules require standards to be met and permits issued before floodway or floodfringe development3. Statewide, new structures, wells and sewage systems are prohibited in the floodway, while floodfringe construction has elevation and access requirements18. Septic suitability is another purchase-stage issue because only about 6.9% of county soils rate free of severe limits for a conventional drain field5. For a new private well, Wisconsin generally requires a Well Construction Notification Number before drilling, and some approved county ordinances can add a permit19. Finally, match the driveway approval to the road owner before assuming legal access13,14.
Watch-outs
- County zoning permits require a review fee and normally receive a written decision within thirty days after a complete application, but parallel processes can extend that schedule; an issued permit expires after twenty-four months unless a one-time twenty-four-month extension is granted for a fee15.
- Columbia County's general zoning ordinance only applies in unincorporated towns that adopted it; floodplain or shoreland-wetland rules may still apply, and another town ordinance may govern, so never read 'outside county zoning' as 'no rules'2,11.
- A driveway connecting to a Columbia County highway needs a county permit not only for new construction but also for repair or improvement13.
- Septic permits are not delegated to the town or the city: the county sanitary permit ordinance covers all lands in Columbia County, including inside cities and villages3.
Sources
19 official pages, each quoted and re-checked · written October 9, 2026
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings)
- Columbia County Zoning Ordinance, Chapter 12 Subchapter 100
- Columbia County Code of Ordinances
- Columbia County Planning & Zoning Department (co.columbia.wi.us)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Instructions for Submitting a UDC Permit Application
- Delegated Agents for Uniform Dwelling Code Permitting and Inspection (Wisconsin statewide rule)
- General Engineering Co. (Uniform Dwelling Code inspection agency under contract to most Columbia County towns) (co.columbia.wi.us)
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule)
- Columbia County Planning & Zoning Department (co.columbia.wi.us)
- Local Land Use Regulations and Comprehensive Planning Status Inventory Project (Wisconsin statewide rule)
- Columbia County Code of Ordinances
- Highway Department Forms
- State highway connection permits (driveways & more) (Wisconsin statewide rule)
- New Home Construction Quick Facts
- Wisconsin Administrative Code SPS 320.09 (Wisconsin statewide rule)
- Wisconsin’s Shoreland Management Program (Wisconsin statewide rule)
- Floodplain Development Basics (Wisconsin statewide rule)
- Well and heat exchange notification (Wisconsin statewide rule)
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Columbia County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.