St. Croix County, Wisconsin
Town of Springfield is a town in St. Croix County, Wisconsin. Town of Springfield adopts its own zoning, so inside its limits Town of Springfield’s rules apply, not the county’s. Septic permits inside Town of Springfield come from St. Croix County (St. Croix County Community Development Department · 715-386-4680). 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the St. Croix County page.
New, added, or altered one- and two-family dwellings in Springfield town.
“No person shall build or cause to be built any new one- or two-family dwelling, or any addition or alteration to an existing one- or two-family dwelling, without first obtaining a state uniform building permit or a town building permit for such dwelling, structure, etc., as determined by the Building Inspector.”
Classes of buildings inside Springfield town to which the adopted Wisconsin codes apply.
“The adoption of the Wisconsin Administrative Codes, noted below, and all amendments thereto in effect on the date of the adoption of this chapter are hereby adopted and made part of this chapter by reference and are applicable to all those classes of buildings to which said codes apply.”
Construction, reconstruction, and alteration of dwellings and commercial buildings in Springfield town.
“The Building Inspector shall have the power and duty to see that the construction, reconstruction, alteration, of dwellings and Commercial buildings in the Town conform to the laws of the State of Wisconsin, the orders, rules and regulations laid down by the Department of Commerce of the State of Wisconsin and the ordinances, rules and regulations of the Town Springfield and St. Croix County and to make all inspections as required.”
Land inside Springfield town; the Town approved application of St. Croix County Chapter 15 rather than adopting a separate Town zoning text.
“shall take all required actions to make the St. Croix County Zoning Ordinance applicable with the Town of Springfield.”
Building-permit applicants needing driveway access inside Springfield town.
“The building permit applicant shall submit with the application a driveway permit, which shall be applied for and obtained from the Town Board for town roads or private roads. The county issues all other driveway permits.”
Town building permits and listed related Town application services in Springfield town.
UDC permit seal payment: 25 USD (Assigned to any new dwelling.)
“The building permit fees shall be set by resolution of the Town Board and may be changed from time to time and shall include $25.00 to be forwarded to the Wisconsin Department of Commerce for the UDC permit seal that shall be assigned to any new dwelling.”
Building-permit applications in Springfield town.
permit validity: 24 months · action deadline: <= 10 business days (After receipt of all required forms, fees, plans, and documents.)
“Application process; issuance of permit.”
Town of Springfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Zoning districts applicable inside Springfield town under the County zoning code.
“To determine the regulations of the zoning code applicable to a site, the user must first find the site on the “Official Zoning Map.” The map will show the zoning district that is applied to the site. The official Zoning Map is maintained online through the County’s Geographic Information Systems website.”
R-1 Residential District inside Springfield town.
minimum lot area: >= 1.5 acres
“Table 15.230.1 R-1 Dimensional Standards Standard Design 1 Lot area (min) 1.5 acre minimum 2 Density (max) 1 principal dwelling per 10 acres”
R-1 Residential District inside Springfield town.
street setback: >= 50 feet · principal-building side setback: >= 10 feet · principal-building rear setback: >= 25 feet
“4 Street setback (min) 50' 5 Side setback (min) 10’ any side 5’ accessory structure,100' structure housing animals 6 Rear setback (min) 25’ for principal building 5’ accessory structure, 100' structure housing animals”
R-1 Residential District inside Springfield town.
maximum building height: <= 50 feet (Agricultural accessory uses named in the schedule have no height limit.)
“3 Height (max) 50 feet No height limit applies to agricultural accessory uses such as silos, bins, barns and seed storage facilities”
Private onsite wastewater systems inside Springfield town.
“A State Sanitary Permit is required for the installation of a private on-site wastewater treatment system (POWTS). A County Sanitary Permit is required for the repair, reconnection, or rejuvenation of a POWTS, or the installation of a non-plumbing sanitation (i.e. privy, composting toilet, etc.)”
POWTS installation, repair, reconnection, rejuvenation, or non-plumbing sanitation inside Springfield town.
“A Sanitary Permit is required before obtaining a building permit from your local municipality. A Sanitary Permit may only be submitted by a licensed plumber. Staff will conduct at least one inspection for all work requiring a sanitary permit.”
Private onsite wastewater work and existing private onsite wastewater systems inside Springfield town.
inspection/service interval: per 3 years (unless otherwise specified in a management plan)
“serviced or inspected at least once every three years”
Privies, composting toilets, and other non-plumbing sanitation inside Springfield town.
“A State Sanitary Permit is required for the installation of a private on-site wastewater treatment system (POWTS). A County Sanitary Permit is required for the repair, reconnection, or rejuvenation of a POWTS, or the installation of a non-plumbing sanitation (i.e. privy, composting toilet, etc.)”
Land divisions and subdivisions inside Springfield town.
“The Community Development Department oversees the management of the Land Division Ordinance in St. Croix County, guiding subdivision development. General requirements are listed below for reference.”
Development, repair, modification, addition, or use change in a floodplain-regulated area inside Springfield town.
“A land use permit shall be obtained before any new development; repair, modification or addition to an existing structure; or change in the use of a building or structure, including sewer and water facilities, may be initiated.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Springfield or St. Croix County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Springfield publishes no rule on the point, not that none exists. St. Croix County’s page lists the county offices to call.