St. Croix County, Wisconsin
Village of Baldwin is a village in St. Croix County, Wisconsin. Village of Baldwin adopts its own zoning, so inside its limits Village of Baldwin’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the St. Croix County page.
New buildings, additions, alterations inside Baldwin village
minor repair exemption: < 2000 USD (must not change occupancy, area, structural strength, fire protection, exits, natural light or ventilation)
“no new building or structure, or any part thereof, shall hereafter be erected, or ground broken for the same, or enlarged, altered, moved, demolished, razed or used within the village, except as herein provided, until a permit therefor shall first have been obtained by the owner, or his/her authorized agent, from the building inspector or his/her designee.”
Construction inside Baldwin village
“the following wisconsin administrative codes and subsequent revisions are adopted for municipal enforcement: [1] (a) chapters sps 320 to sps 325, uniform dwelling code.”
Land inside Baldwin village, St. Croix County, WI
“for this ordinance, the village of baldwin is hereby divided into the following zoning districts”
Single-family dwellings in the R-1 Single-Family Residential District, Baldwin village
minimum gross floor area single-family: >= 720 sq ft (exclusive of basements, garages, porches, breezeways; 720 sq ft on first floor)
“every single-family dwelling shall have a minimum gross finished floor area of not less than seven hundred twenty (720) square feet, exclusive of basements, garages, porches, and breezeways with a minimum 720 square feet gross floor area on the first floor.”
“every single-family dwelling shall have a minimum gross finished floor area of not less than one thousand (1,000) square feet exclusive of basements, garages, porches, and breezeways with a minimum 700 square feet gross floor area on the first floor.”
R-1 Single-Family Residential District, Baldwin village
minimum lot area single-family: >= 15000 sq ft · minimum lot area duplex: >= 20000 sq ft
“1) minimum lot area: no single-family dwelling shall be established on any parcel less than 15,000 square feet in size/no duplex shall be established on any parcel less than 20,000 square feet.”
R-1 Single-Family Residential District, Baldwin village
front setback: >= 30 feet · side setback: >= 10 feet · rear setback: >= 35 feet
“3) setbacks: a) front: thirty (30) feet from right-of-way. b) side: ten (10) feet. c) rear: thirty-five (35) feet.”
“3) setbacks: a) front: thirty (30) feet from right-of-way. for corner lots, the setback facing the street shall be twenty (20) feet. b) side: ten (10) feet. c) rear: fifty (50) feet.”
R-1 Single-Family Residential District, Baldwin village
maximum lot coverage: <= 30 percent
“5) maximum lot coverage: thirty (30) percent”
“5) maximum lot coverage: forty (40) percent”
R-1 Single-Family Residential District, Baldwin village
maximum height: <= 35 feet
“4) maximum height: no principal or accessory building or structure shall exceed thirty-five (35) feet in height from the average finished grade.”
“4) maximum height: no structure shall exceed thirty-five (35) feet in height from the average finished grade or 2 ½ stories.”
Building permit applications inside Baldwin village
“application for a building permit shall be made in writing upon a form furnished by the building inspector or his/her designee”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Baldwin or St. Croix County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Baldwin publishes no rule on the point, not that none exists. St. Croix County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Baldwin means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.