Bolthole Index

Pike County, Pennsylvania

Building permits, zoning and septic rules in Pike County, Pennsylvania

69Index Score / 100
#33 of 67 in Pennsylvania

Pike County, Pennsylvania has no countywide building or zoning department: Pennsylvania's Uniform Construction Code requires a building permit statewide, but your own township or borough issues it, not the county1. Zoning works the same way; every Pike County municipality except Greene Township has adopted its own zoning ordinance, and there is no county zoning code2. On-lot septic goes through your municipality's Sewage Enforcement Officer under the state's Act 537 program, and USDA soil data rates only 0.1% of the county's soils free of severe limits for a conventional drain field, so most parcels will need an engineered system34.

At a glance

Building permit
Required statewide, but issued by your township or borough, not the county1
Zoning
No countywide zoning; set by each municipality (all but Greene Township have one)2
Septic
Act 537 permits issued by your municipality's Sewage Enforcement Officer3
Septic soils
Only 0.1% of soils rate free of severe limits for a conventional drain field4
Large-tract septic exemption
A 10+ acre tract for an owner/immediate-family residence may skip the onlot permit5
Well
Homeowners can drill their own well without a commercial driller's license6
Property tax
Effective rate about 1.4%, median bill about $3,502/year78
Distance
Nearest city of 100,000+ people is about 54 miles away9

Who to call

Planning & zoning

Pike County Office of Community Planning

Countywide review of subdivision and land development plans against each municipality's own SALDO and zoning; does not issue building or zoning permits itself

570-296-7613

[email protected]

506 Broad St, Milford, PA 18337

Also useful

Pike County Conservation District

Chapter 102 erosion and sedimentation (E&S) plan review and NPDES permits, Chapter 105 waterway/wetland encroachment review, and timber harvest plans for land-disturbing activity in Pike County

570-226-8220

556 Route 402, Hawley, PA 18428

Also useful

Dingman Township municipal office (one example of a Pike County local government office)

Example only: Dingman Township's own zoning, building-permit referral and local-government office for land within Dingman Township. Every other Pike County township or borough has its own separate office, and this office has no authority outside Dingman Township.

570-296-8455

[email protected]

118 Fisher Lane, Milford, PA 18337

Contact details are copied from each office’s official page and were checked against it on September 25, 2026.

Do you need a building permit in Pike County, Pennsylvania?

Pike County itself does not issue building permits: Pennsylvania's Uniform Construction Code (UCC) requires a permit for new construction statewide, but each municipality's own certified Building Code Official enforces it, not the county1. Pennsylvania law requires property owners to obtain a construction or building permit before starting any work covered by the UCC, and a certificate of occupancy before the building can be used10. Emergency repairs or equipment replacements can proceed without a permit if the owner applies to the building code official within three business days10. Because the permit office is set by your municipality rather than the county, the correct phone number and office depend on whether your parcel sits in a township or a borough; Dingman Township, one of Pike County's larger townships, is reached at 570-296-8455 as one example of what a local permit office looks like11.

Who issues building and zoning permits in Pike County, and how do you reach them?

There is no single Pike County building or zoning department; each of the county's townships and boroughs runs its own, so your first call depends on where your parcel is located2. As one example, Dingman Township's municipal office is at 118 Fisher Lane, Milford, PA 18337, phone 570-296-8455, email [email protected]; every other municipality has its own separate office, phone and mailing address11. The Pike County Office of Community Planning does not issue building or zoning permits, but it reviews every subdivision and land development application against the municipality's own Subdivision and Land Development Ordinance (SALDO) and zoning; reach it at 570-296-7613 or [email protected]12. All Pike County municipalities except Greene Township have adopted their own zoning ordinance, and every municipality has a SALDO2.

Does Pike County have zoning?

Pike County does not have a countywide zoning ordinance; zoning in Pike County is set municipality by municipality, and all of the county's townships and boroughs except Greene Township have adopted their own zoning ordinance2. Pennsylvania law lets a county adopt zoning only in a municipality that has none, and any county zoning ordinance is automatically superseded the moment that municipality adopts its own, which is why Pike County has no active county zoning13. Pennsylvania's own state guidance sends zoning questions to the township, borough or city where the activity will occur, rather than to the county or the state14. Because setbacks, minimum lot size, and RV or tiny-home rules are set locally, confirm them with the zoning officer of the specific township or borough where your parcel sits before you buy or build2.

How do septic and well permits work in Pike County?

Pike County has no county health department; on-lot septic systems are permitted under Pennsylvania's statewide Act 537 program, administered locally by each municipality's own Sewage Enforcement Officer, so you'll need to contact the specific township or borough where your parcel sits3. Pennsylvania law generally requires a permit from the local agency before you install, construct, occupy or use a building served by an individual onlot sewage system5. A narrow state exemption removes that permit requirement for an individual onlot system serving an owner or immediate-family residence on a contiguous tract of at least 10 acres, subject to owner-of-record, siting-distance and notification conditions, which matters if you're buying a large rural tract5. USDA soil survey data rates only 0.1% of Pike County's soils as free of severe limits for a conventional septic drain field, among the toughest odds Bolthole Index tracks, so budget for an engineered or alternative system on nearly every parcel4. Once a system is built, it may not be covered until the permit issuer approves; if 72 hours pass after you notify them of completion, excluding Sundays and holidays, without a refusal, you may cover it15. Well drilling is largely unregulated for homeowners: Pennsylvania requires commercial well drillers to be licensed, but that licensing rule does not apply to a farmer or homeowner drilling their own well on their own or leased land6.

Can you live in an RV or tiny home on your land in Pike County?

Pennsylvania's state park rules that let campers stay up to 14 consecutive nights in summer or 21 consecutive nights the rest of the year only govern state park campgrounds, not a private parcel in Pike County, so they don't answer whether you can live in an RV on your own land16. Because zoning in Pike County is set by each township and borough rather than the county, whether long-term RV occupancy or a tiny home is allowed on a specific parcel depends on that municipality's own zoning ordinance; Greene Township has no zoning ordinance at all, while every other Pike County municipality does2. A manufactured home that is resold, relocated or altered after delivery has to meet Pennsylvania's Uniform Construction Code even though a new, properly installed manufactured home is otherwise exempt from it, and local zoning and land-use rules apply on top of that either way17. Confirm RV, tiny-home and manufactured-home rules with the zoning officer of the specific township or borough where your parcel sits; Bolthole Index could not confirm a single countywide answer2.

Building a home in Pike County: the steps, in order

  1. Identify which township or borough your parcel is in; Pike County has no countywide zoning, and all municipalities except Greene Township have their own zoning ordinance2.
  2. Apply for a zoning permit with that municipality's zoning officer, and check whether the Pike County Office of Community Planning needs to review a Subdivision and Land Development Ordinance (SALDO) application if you are creating a new lot; reach the county office at 570-296-7613122.
  3. Contact your municipality's Sewage Enforcement Officer for an Act 537 septic permit, or confirm whether your tract qualifies for the state's owner/immediate-family exemption on tracts of at least 10 acres35.
  4. Apply for your Uniform Construction Code building permit through your municipality's certified Building Code Official; Dingman Township's office, as one example, is reached at 570-296-8455111.
  5. If your land disturbance involves earthmoving, check with the Pike County Conservation District, 570-226-8220, about Chapter 102 erosion and sedimentation control requirements18.
  6. Complete required UCC inspections and get your certificate of occupancy before you move in10.

What to check before you buy land in Pike County

Find out which township or borough your parcel is in and whether that municipality has zoning, since Pike County itself has none and all municipalities except Greene Township have adopted their own2. Ask that municipality's Sewage Enforcement Officer whether the parcel has passed, or can pass, a septic site evaluation; countywide, only 0.1% of soils rate free of severe limits for a conventional drain field, so plan on an engineered or alternative system almost everywhere in Pike County4. A driveway or road connecting to a state highway needs a PennDOT Highway Occupancy Permit, usually issued within 30 days once the application is complete19. If any part of the parcel sits in a mapped Special Flood Hazard Area, the municipality must issue its own floodplain development permit before you can build there20. Pike County's typical home value is about $310,753 and its effective property tax rate is about 1.4%, for a median tax bill near $3,502 a year, well above many rural counties2178. The nearest city of 100,000 or more people is about 54 miles from the county's center, and forest covers 94.7% of the county's land922.

Watch-outs

  • Pike County has no countywide zoning; Greene Township is the one municipality with no zoning ordinance of its own, so confirm with the county's Office of Community Planning or the township directly which rules apply to a specific parcel212.
  • Bolthole Index could not confirm which office handles your specific parcel's building, zoning or septic permit this session; the correct office depends on which of Pike County's townships or boroughs your land is in, and Dingman Township's office above is only one example, not the countywide contact11.
  • A contiguous tract of at least 10 acres owned by the resident or an immediate family member may be exempt from Pennsylvania's onlot-sewage permit requirement, but the exemption has owner-of-record, siting-distance and notification conditions that a Sewage Enforcement Officer must confirm5.

Sources

  1. Pike County Office of Community Planning (2026 county census)
  2. Pike County Office of Community Planning (2026 county census)
  3. PA DEP - Sewage Enforcement Officers (Act 537) (2026 county census)
  4. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  5. 25 Pa. Code § 72.22. Permit issuance (Pennsylvania statewide rule), quoted and re-checked
  6. Apply for a Water Well Drillers License and Rig Permit (Pennsylvania statewide rule), quoted and re-checked
  7. Effective property tax rate: Bolthole Index county data
  8. Median property tax bill: Bolthole Index county data
  9. Distance to the nearest metro area: Bolthole Index county data
  10. Apply for a Uniform Construction Code Building Permit (Pennsylvania statewide rule), quoted and re-checked
  11. Dingman Township municipal office (one example of a Pike County local government office) (pikepa.org)
  12. Pike County Office of Community Planning (pikepa.org)
  13. Pennsylvania Municipalities Planning Code (Pennsylvania statewide rule), quoted and re-checked
  14. Local Registrations, Permits, Zoning (Pennsylvania statewide rule), quoted and re-checked
  15. Pennsylvania Sewage Facilities Act (Pennsylvania statewide rule), quoted and re-checked
  16. RV and Tent Campsites (Pennsylvania statewide rule), quoted and re-checked
  17. Pennsylvania Uniform Construction Code, Chapter 403 (Pennsylvania statewide rule), quoted and re-checked
  18. Pike County Conservation District (pikeconservation.org)
  19. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  20. PennsylvaniA Floodplain Development Guide (Pennsylvania statewide rule), quoted and re-checked
  21. Typical home value (Zillow): Bolthole Index county data
  22. Wooded share of land: Bolthole Index county data

Written September 25, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Pike County in Pennsylvania

69
County map
Pike County highlighted among the Pennsylvania counties · colored by Index score

How Pike County scores

Seclusion38100% ev.
Self-Sufficiency63100% ev.
Admin Boringness6090% ev.
Durability69100% ev.
Property Autonomy68100% ev.
Carry Cost76100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$311kTypical home
1.4%Property tax
$3,130Land / acre
47.7"Annual rain
1.7% of yrsSevere drought
0.8 / yr (+0.8)Mid-century 100°F days
11.3 daysMid-century dry spell
2.15" (+7.5%)Mid-century 1-day rain
1.49×Wildfire change factor
100%Forward climate coverage
$1,343Home insurance / yr
0.1% / yrInsurance growth
0.49%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
30,998People within 30 min
9,299,185People within 2 hr
75,986Radius comparison (15 mi)
112.4People / sq mi
5.5%Federal land
83.5%Land at 15% slope or less
0.1%Septic soil without severe limits
268 acWorkable land screen
94.7%Wooded land
70.5 tonsBiomass / forest ac
47.5°FAvg temp

Scout Pike County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Pike County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Pike County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Pike County rules

  • Local zoningVaries (with conditions)

    Aggregate municipal and township zoning across Pike County.

    • All but Greene Township have adopted local zoning ordinances; applicable rules depend on the municipality.
    “All 13 municipalities in Pike County have an adopted Subdivision & Land Development Ordinance (SALDO), and all but Greene Township have adopted local zoning ordinances.”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development in Pike County.

    • All 13 municipalities have adopted a SALDO.
    • The County acts as an advisor; the county office reviews subdivisions and land developments based on the applicable municipality's SALDO, zoning regulations, and other land-use regulations.
    “All 13 municipalities in Pike County have an adopted Subdivision & Land Development Ordinance (SALDO), and all but Greene Township have adopted local zoning ordinances.”
  • County-wide zoningAbsent

    Zoning is municipal, not county-administered; all Pike County municipalities except Greene Township have adopted local zoning ordinances, and all have a Subdivision & Land Development Ordinance reviewed by the county planning office.

    Pike County Office of Community Planning ↗Scouted from the county site, not yet independently re-checked

  • Who permits septicPA DEP Act 537 program / municipal Sewage Enforcement Officer

    On-lot septic is permitted under PA's statewide Act 537 program and administered locally by each municipality's Sewage Enforcement Officer; there is no county health department administering septic county-wide.

    PA DEP - Sewage Enforcement Officers (Act 537) ↗Scouted from the county site, not yet independently re-checked

Pennsylvania rules that apply here

  • Building permitRequired

    Construction or building work in Pike County subject to the UCC.

    • Emergency repairs or equipment replacements may proceed without first applying if the application is submitted within three business days.
    • The rule is administered by the applicable building code official, municipality, Department, or certified third-party agency.
    “The UCC requires property owners to obtain a construction or building permit before starting any work.”
  • Building code adoptedAdopted

    Building construction throughout Pennsylvania under the Pennsylvania Uniform Construction Code.

    • The UCC is administered and enforced locally by municipalities that opt in, using municipal employees or certified third-party agencies.
    • In municipalities that opt out, the Department of Labor and Industry is responsible for commercial code enforcement, while certified third-party agencies hired by property owners or contractors enforce residential UCC requirements.
    • The Department has sole jurisdiction for elevators and state-owned buildings wherever located.
    • The 2021 accessibility updates are permanently enjoined; structures must still comply with the 2018 accessibility requirements, and the injunction does not affect enforcement of non-accessibility UCC requirements.
    • The revised regulations adopting the 2018 I-Code series became effective February 14, 2022. Contract-based transition rules allow certain projects with contracts signed before that date to use the UCC in effect at the time of contract if application was made by August 14, 2022 or earlier.
    • The 2021 I-Code accessibility provisions became effective December 25, 2021, with a contract-based transition period allowing applications by June 25, 2022 or earlier.
    • Pennsylvania's Uniform Construction Code triennial update was published November 8, 2025 and became effective January 1, 2026.

    2018 I-Code regulations effective date: 2022-02-14 (For contracts signed before this date, application and permit issuance under the UCC in effect at the time of contract were allowed if application was made by 2022-08-14.) · 2021 I-Code accessibility provisions effective date: 2021-12-25 (For contracts signed before this date, application and permit issuance under the UCC in effect at the time of contract were allowed if application was made by 2022-06-25.) · 2025 triennial UCC update effective date: 2026-01-01

    “Pennsylvania's statewide building code, generally known as the Uniform Construction Code (UCC), has to be followed by builders in the state.”
  • InspectionsRequired

    UCC-regulated residential and commercial construction and regulated electrical, gas, mechanical, plumbing, swimming-pool, hot-tub, manufactured-housing, and industrialized-housing work.

    • Inspections are required in the cases listed by the Department; manufactured and industrialized housing has additional inspection requirements for site preparation, foundation construction, repairs, and changes in occupancy.
    “A construction code official shall inspect all construction for which a permit was issued.”
  • Certificate of occupancyRequired

    Buildings and facilities subject to the UCC in Pike County.

    • A building or facility may not be used or occupied without a certificate of occupancy.
    • A portion may receive a certificate if it independently complies; a temporary certificate may be issued for a safely occupiable portion for a specified period.
    • The certificate must be issued within five business days after a compliant final inspection report, except the residential rule provides ten business days in a city of the first class.

    issuance deadline: 5 business days (10 business days in a city of the first class)

    “A residential building may not be used or occupied without a certificate of occupancy issued by a building code official.”
  • Zoning districtsPartial

    Pennsylvania zoning requirements and district information; the official state source directs applicants to the local township, borough, or city.

    • Local registrations, permits, and zoning requirements must be addressed with the township, borough, or city where the activity will occur.
    • The source does not publish a statewide zoning-district map or a single statewide zoning-district schedule.
    • This claim does not identify or aggregate individual municipal zoning districts.
    “Local registrations, permits, zoning requirements and related questions should be directed to the township, borough, or city where you will be operating.”
  • Manufactured homesLimited

    Manufactured housing assembled and shipped by the manufacturer and bearing the required federal-construction-and-safety label, including changes in occupancy, resale, relocation, additions, repairs, utility connections, and grading addressed by Pennsylvania's Uniform Construction Code.

    • For new labeled manufactured housing installed in conformity with the manufacturer's approved design, the UCC does not apply except as provided in the regulation.
    • Construction activities or processes, including utility connections and grading, that are not addressed by the manufacturer's approved design must comply with the UCC.
    • The UCC applies to alterations or repairs outside the federal manufactured-home standards and manufacturer installation instructions after assembly and shipment.
    • The UCC applies to additions after delivery to the site.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the manufactured housing is resold to a subsequent purchaser.
    • The UCC applies to construction, alteration, repair, or change of occupancy if the original purchaser relocates the manufactured housing.
    • Pennsylvania building-permit guidance states that manufactured housing projects require inspections for site preparation, foundation construction, repairs, and changes in occupancy.
    • This state construction-code rule does not resolve local zoning, land-use siting, or utility/septic approval requirements.
    “Construction, alteration, repair or change of occupancy if the original purchaser relocates the manufactured housing.”
  • Septic permitRequired

    Installation, construction, occupancy, or use of a building served by an individual or community onlot sewage system statewide.

    • A permit must be obtained from the local agency before installation, contracting for construction, construction, occupancy, or use.
    • Multiple chemical or portable toilets for temporary construction, recreation, or temporary facilities are covered by one permit.
    • A permit is not required for a recycling, incinerating, or composting toilet where the existing onlot system is not altered.
    • A permit exemption may apply to an individual onlot system serving an owner or immediate-family residence on a contiguous tract of at least 10 acres, subject to the owner-of-record date, local ordinance exception, notification, and siting requirements.
    • A permit is not required for a replacement dwelling when the local agency determines the size and anticipated use are the same as or less than the prior dwelling and the prior dwelling was in use within one year, except during an active malfunction investigation.

    permit-exemption tract size: >= 10 acres (Only under the specific owner/immediate-family and January 10, 1987 owner-of-record conditions.) · permit-exempt siting distance: >= 200 feet (Applies to septic tanks and absorption areas from listed property, water, floodplain, and related features.) · permit-exempt utility right-of-way distance: >= 10 feet · local-agency verification fee cap: <= 25 USD (For verifying siting of a permit-exempt system.)

    “without first obtaining a permit from the local agency, except as provided in subsections (c)—(e).”
  • Septic inspectionLimited

    Individual and community sewage-disposal systems before concealment or covering after construction.

    • The system may not be covered until approval to cover is given by the original permit issuer or authorized representative.
    • If 72 hours have elapsed after notification of construction completion, excluding Sundays and holidays, the applicant may cover the system unless permission has been refused.

    post-completion waiting period: 72 hours (Sundays and holidays excluded.)

    “shall be covered from view until approval to cover the same has been given by the body which issued the original permit”
  • Off-grid sanitationLimited

    Composting, incinerating, recycling, and similar water-conservation toilets used for residential or establishment sanitation statewide.

    • For a new residence or establishment, an onlot sewage system or other approved disposal method must treat washwater or excess liquid, and both facilities must be under one permit, except for the retaining-tank exception.
    • For an existing residence or facility with no alteration of the onlot system, no permit is required for installation.
    • A composting or incinerating toilet on a qualifying retaining-tank lot is treated as and permitted as a privy.
    • The device must meet manufacturer specifications and be operated and maintained to prevent pollution or health hazards.
    • Liquid discharges are prohibited unless sent to a compliant onlot sewage system or another method approved under the chapter or by DEP.
    • Recycling, incinerating, and composting toilets must bear the NSF Standard No. 41 seal.
    “an onlot sewage system or other approved method of sewage disposal shall be provided for treatment of washwater or excess liquid from the unit”
  • Well permitLimited

    Water-well drilling statewide, distinguishing commercial water-well drillers from farmers and homeowners drilling their own wells on owned or leased land.

    • Water-well drilling companies must obtain a license and permits.
    • The licensing requirement does not apply to farmers or homeowners who drill their own water wells on their own or leased land.
    • The state has construction standards for public water-supply wells but not private water wells.
    • Drillers must submit the well's construction details to the state and the well owner.

    driller license year: June 1-May 31 · annual driller license fee: 60 USD · rig permit fee: 20 USD

    “Water well drilling companies must get a license and permits to drill a well in Pennsylvania.”
  • Mandatory utility hookupConditional

    Completed construction subject to the UCC and connection to a public electric or gas utility.

    • A building code official may authorize temporary connection to an energy, fuel, or power source during construction.
    • Completed public electric or gas connection requires written proof that the building or structure passed the chapter's inspections.
    “Connection to a public electric or gas utility for the completed construction may not occur unless the permit holder provides written proof to the utility company that the building or structure passed inspections under this chapter.”
  • Agricultural exemptionAvailable (with conditions)

    Qualifying agricultural buildings under Pennsylvania's Construction Code Act and Uniform Construction Code.

    • The exemption applies to an agricultural building as defined by the Act: a structure used to store farm implements, hay, feed, grain, or other agricultural or horticultural products; house poultry, livestock, or other farm animals; serve as a milk house; or grow mushrooms, agricultural, or horticultural products.
    • The definition includes a qualifying carriage house owned and used by members of a recognized religious sect for housing horses and storing buggies.
    • The definition includes a structure less than 1,000 square feet used to process maple sap.
    • The structure must not include habitable space.
    • The structure must not contain spaces where agricultural products are processed, treated, or packaged.
    • The structure is not a place of occupancy by the general public.
    • Other municipal land-use, zoning, fire, electrical, health, or environmental requirements may still apply; the cited exclusion is from the Construction Code Act.

    maple sap processing structure area: < 1000 square feet (Must otherwise meet the statutory agricultural-building definition.)

    “(b) Exclusions.--This act shall not apply to any of the following: [...] (4) Any agricultural building.”
  • Driveway accessRequired

    Construction or alteration of a driveway or road on Pennsylvania state highway land, and access connecting to a PennDOT drainage facility.

    • A permit is required when building or changing a driveway, road, drainage, or utility facility on state highway land.
    • A permit is also required when the work connects to a PennDOT drainage facility.
    • Permits are usually given within 30 days when the application contains all needed information and complies with PennDOT regulations.
    • The claim does not establish a universal permit requirement for driveways not involving state highway land or a PennDOT drainage facility.

    usual review or issuance time: 30 days (The source states “usually” and conditions this on complete information and compliance with PennDOT regulations.)

    “You need a permit when you're building or changing a driveway, road, drainage or utility facility on the state highway land.”
    One more reviewed finding on this topic
    • Required — Driveway access from property requiring access to a Commonwealth highway under PennDOT jurisdiction.
      “A building code official may not issue a permit for any property requiring access to a highway under the Department of Transportation’s jurisdiction unless the permit contains notice that a highway occupancy permit is required under section 420 of the State Highway Law (36 P. S. § 670-420) before driveway access to a Commonwealth highway is permitted.”
  • Building in a floodplainRequired

    Development activities within a Special Flood Hazard Area in Pennsylvania municipalities.

    • Municipalities must evaluate whether a project is within the SFHA and identify the type of work.
    • Municipalities must review permit applications and issue or deny permits for SFHA development.
    • Municipalities must conduct periodic inspections for compliance with proposed plans and the floodplain ordinance.
    • After completion, municipalities review required certificates and issue a certificate of occupancy when the development complies with the local floodplain ordinance.
    • Additional zoning permit requirements may apply when proposed land use changes.
    “A floodplain development permit (or its equivalent) must be issued by the municipality before development activities occur within the SFHA.”
  • Permit feesPublished (with conditions)

    Pennsylvania Department of Labor and Industry UCC permit applications applicable in Pike County when the Department is the issuing authority.

    • Applicants must pay the applicable fee by check or money order payable to the Commonwealth of Pennsylvania.
    • Expedited plan review is available within seven days of written request for an additional cost.
    • Additional fees apply for inspections outside normal business hours; fees paid cover plan review and all inspections.
    • Municipal or third-party fee schedules may differ.
    “A check or money order made payable to the Commonwealth of Pennsylvania for the applicable fee. The department is now offering expedited plan review performed within seven days of receipt of a written request for an additional cost.”
  • Permit processPublished (with conditions)

    Pennsylvania Uniform Construction Code building permits for construction and building work subject to the UCC.

    • A UCC building permit must be obtained before starting work.
    • Inspections are required in several listed cases, including commercial or residential building changes, electrical, gas, mechanical or plumbing systems, swimming pools or hot tubs, and specified manufactured or industrialized housing work.
    • A UCC certificate of occupancy must be issued before a building or facility can be used.
    • Emergency repairs or equipment replacements may proceed without a permit if an application is submitted to the building code official within three business days.
    “The UCC requires property owners to obtain a construction or building permit before starting any work.”
  • Campground & park staysLimited

    RV use and occupancy at Pennsylvania state park campgrounds.

    • Use must occur at a state park campground and comply with campsite rules.
    • Campers may stay up to 14 consecutive nights from Memorial Day to Labor Day.
    • Campers may camp up to 21 consecutive nights during the remainder of the year.
    • Campers must vacate and remove all equipment for 48 hours between reservations.
    • A maximum of two sleeping units is permitted per campsite, of which only one may be wheeled.
    • Campsite occupancy is limited to one family unit or one non-family unit limited to five persons per site.
    • The page does not establish statewide permission for long-term or residential RV occupancy outside state park campgrounds.

    maximum stay, Memorial Day to Labor Day: 14 consecutive nights · maximum stay, remainder of year: 21 consecutive nights · equipment-removal interval between reservations: 48 hours · maximum sleeping units per campsite: 2 units (Only one may be wheeled.) · maximum non-family occupancy: 5 persons per site (One family unit is permitted instead.)

    “maximum of two sleeping units are permitted per campsite, of which only one may be wheeled.”
    One more reviewed finding on this topic
    • Limited — Temporary camping at Pennsylvania state park campgrounds.
      “Campers may camp for up to 21 consecutive nights”
  • county zoning authorityLimited

    Pennsylvania counties adopting and enforcing zoning ordinances on unincorporated land.

    • The Municipalities Planning Code defines county for this authority as any county of the second class through eighth class.
    • County zoning power is limited to land in municipalities wholly or partly within the county that have no zoning ordinance in effect when the county ordinance is introduced and until the municipality's zoning ordinance becomes effective.
    • A municipality's later zoning ordinance repeals the county zoning ordinance pro tanto within that municipality.
    “Section 602. County Powers.--The powers of the governing bodies of counties to enact, amend and repeal zoning ordinances shall be limited to land in those municipalities, wholly or partly within the county, which have no zoning ordinance in effect at the time a zoning ordinance is introduced before the governing body of the county and until the municipality's zoning ordinance is in effect.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-builder exemptions from UCC permit or inspection requirements.
  • Minimum dwelling size — Minimum dwelling-size standards in Pike County.
  • Minimum lot size — Minimum lot-size standards in Pike County.
  • Setbacks — Setback standards in Pike County.
  • Lot coverage — Lot-coverage standards in Pike County.
6 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Pike County, Pennsylvania

Is Pike County a good place to live off-grid or homestead?

Pike County scores 69/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and mixed durability signals. Watch-outs: about 30,998 people within a 30-minute drive.

Do you need a building permit in Pike County, Pennsylvania?

Pike County generally requires a residential building permit, and it has no county-wide zoning. Onsite septic is permitted by PA DEP Act 537 program / municipal Sewage Enforcement Officer. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Pike County, Pennsylvania?

Land in Pike County runs about $3,130 per acre, based on the latest county data.

What is the water situation in Pike County?

Pike County gets about 47.7" of rain a year, with severe drought in roughly 1.7% of years.

How remote is Pike County?

A representative private-land location has about 30,998 people within a 30-minute drive and 9,299,185 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Pike County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Pike compares in Pennsylvania

Compare side-by-side →See all 67 Pennsylvania counties ranked →