Robertson County, Tennessee requires a residential building permit through the county Planning Department, which also administers county zoning1,2. Municipal zoning may apply independently inside incorporated towns, but septic permits for every address come from the Tennessee Department of Environment and Conservation, and the county requires that septic permit or a sewer tap receipt before issuing a building permit1,2,3.
Do you need a building permit in Robertson County, Tennessee?
Yes.
Yes. Robertson County requires a building permit for new construction, issued to the landowner or a licensed contractor, and construction drawings must comply with the 2021 International Building Codes1,4. Tennessee also runs a separate State Residential Building Permit program through the State Fire Marshal's Office, but that program applies only in "opt-out" or "non-code" areas that don't enforce their own local codes6. Robertson County enforces its own building codes through its Planning Department, so the state program's separate permit fees and inspection process do not apply here; use Robertson County's own permit process and fee schedule instead1,4.
Who issues building permits in Robertson County, and how do you reach them?
Robertson County's Planning Department handles building permits and is reachable at 511 S Brown St, Springfield, TN 37172, phone (615) 382-6198.
Robertson County's Planning Department handles building permits and is reachable at 511 S Brown St, Springfield, TN 37172, phone (615) 382-61984. The same department also has a listed contact point at 527 S. Brown St., Springfield, TN 37172, phone 615-384-3666, where it maintains zoning maps and records and issues certificates of occupancy and temporary use permits2. The department also conducts inspections as required to ensure compliance, though we could not confirm a published inspection schedule or when a certificate of occupancy is required2. A residential building permit costs $.70 per total square foot of livable space plus porches, garages, storage and basements, and the county separately collects an adequate facilities tax of $1.50 per heated or cooled square foot4. Mechanical permits and plumbing permits are $100 each1.
Does Robertson County have zoning?
Yes.
Yes. Robertson County administers a county zoning ordinance and maintains zoning maps and amendment records2. Tennessee county zoning authority applies outside municipal corporations, so land inside a city may follow that municipality's rules instead7. The Planning Department also administers and interprets the county's Subdivision Regulations, but we could not confirm the approval thresholds, so ask before dividing a tract2. Use the zoning map and resolution to confirm the parcel's district, permitted uses and exceptions before relying on a proposed use2. Buildings on land devoted to agricultural use and incidental to the agricultural enterprise can receive a narrower exemption from county zoning, but the exemption does not cover land near a state or federal-aid highway, public airport, public park, or the floodplain described by the state rule8. Robertson County tells agricultural applicants to inquire before construction4.
How do septic permits work in Robertson County?
The Tennessee Department of Environment and Conservation requires a Septic System Construction Permit to install a septic system or repair a faulty one in Robertson County.
The Tennessee Department of Environment and Conservation requires a Septic System Construction Permit to install a septic system or repair a faulty one in Robertson County3,9. Robertson County requires that permit, or a sewer tap receipt, before issuing a building permit; call 615-687-7000 or use the septic service request website listed by the county4. Review generally takes about 10 days and must be completed within 45 days of a complete application9. After installation, the applicant or installer must notify the state so the system can be inspected and approved before it is covered; the inspection fee is $100 for a conventional system and $200 for an alternative system9. A conventional system permit is $400 for design flow up to 1,000 gallons per day, while an alternative-system permit is $500 at that flow; repair permits have no permit fee9. Only 42.5% of Robertson County soils avoid a "very limited" rating for a conventional drain field, so make septic feasibility a purchase contingency for a specific parcel5. A qualifying utility can require sewer connection where a building lot abuts a public way containing its sanitary sewer10.
Can you live in an RV or tiny home on your land in Robertson County?
We could not confirm a Robertson County-specific rule allowing residential or long-term RV use, temporary camping, or tiny-home occupancy on private land.
We could not confirm a Robertson County-specific rule allowing residential or long-term RV use, temporary camping, or tiny-home occupancy on private land. Robertson County administers zoning and maintains parcel maps, so ask the Planning Department how the parcel's zoning district treats the proposed dwelling or temporary use before buying or moving one onto the land2. We also could not confirm county thresholds for minimum dwelling size, setbacks, lot coverage, building height or accessory dwellings; those questions need a parcel-specific answer from the Planning Department.
Building a home in Robertson County: the steps, in order
Get your septic permit or a sewer tap receipt first; Robertson County's own permit page lists this as the first required step, reachable through the septic service request website or 615-687-7000.
- Get your septic permit or a sewer tap receipt first; Robertson County's own permit page lists this as the first required step, reachable through the septic service request website or 615-687-70004.
- Get a water tap or meter receipt from your water provider, or a letter of intent or receipt from a well-drilling company if you're using a well4.
- Get a driveway permit from the Robertson County Highway Department, required for all new buildings, or from the state highway department if your access is on a state road4,11.
- Get a 911 address verification letter from the Robertson County Emergency Communications Department, required for all new construction4.
- Pull a copy of the recorded deed in the current owner's name from the Register of Deeds office4.
- Prepare a site plan drawing showing the house, roadway, driveway, fencing, other buildings, septic tank and field lines, plus detailed construction drawings that comply with the 2021 International Building Codes4.
- If you're building your own home rather than hiring a contractor, you're limited to one owner-builder permit every two years, and the home can't be for sale, lease or rent; anyone you pay more than $25,000 generally has to be a licensed contractor1,12.
- Submit everything to the Planning Department and pay the residential building permit fee plus the adequate facilities tax before construction begins4.
What to check before you buy land in Robertson County
Soils and septic: 42.5% of Robertson County's soils rate favorably for a conventional drain field, better odds than many rural counties, but get a site evaluation before you count on it for a specific parcel.
Soils and septic: 42.5% of Robertson County's soils rate favorably for a conventional drain field, better odds than many rural counties, but get a site evaluation before you count on it for a specific parcel5. Flooding: ask the Planning Department whether your parcel needs a flood elevation certificate, since one may be required before a building permit is issued4. Access: a driveway onto a county road needs a Robertson County Highway Department permit, while a driveway onto a state highway needs a separate permit from the state highway department4,11. Sewer: if your lot abuts a street with sanitary sewer already available, the utility may be able to require you to connect rather than use a septic system10. Agricultural buildings: a barn or similar structure incidental to an agricultural enterprise can qualify for a narrower zoning exemption, but Robertson County still asks agricultural applicants to inquire before construction4,8. Taxes: the effective property tax rate here is about 0.5%, or roughly $1,547 a year on a typical home5.
Watch-outs
- Tennessee's separate State Residential Building Permit program and its published fee schedule apply only in areas without local code enforcement; Robertson County runs its own Planning Department permitting program with its own fees, so don't use the state's fee table for this county4,6.
- We could not confirm a Robertson County-specific rule on living in an RV or tiny home on your own land; ask the Planning Department directly before you rely on one2.
- The owner-builder exemption allows only one permit every two years for your own residence, not for sale or lease, and anyone you pay more than $25,000 generally must be a licensed contractor12.
Sources
12 official pages, each quoted and re-checked · written October 9, 2026
- How to Acquire a Building Permit (2026 county census)
- Planning Department (2026 county census)
- TDEC - Subsurface Sewage Disposal Systems (SSDS) (2026 county census)
- Robertson County Planning Department (robertsoncountytn.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Residential Permit FAQs (Tennessee statewide rule)
- Tennessee Attorney General Opinion No. 10-108 (Tennessee statewide rule)
- Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, Opinion No. 22-07 (Tennessee statewide rule)
- Septic System Construction Permit
- Utility Customers Frequently Asked Questions (Tennessee statewide rule)
- Highway Entrance Permits (Tennessee statewide rule)
- Can I build my own home without a license? (Tennessee statewide rule)
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Robertson County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.