Robertson County, Tennessee requires a residential building permit through the county Planning Department1. County zoning applies outside municipalities, but parcel-specific district rules and exceptions still matter23. Septic permits come from the Tennessee Department of Environment and Conservation, and Robertson County requires the permit or a sewer tap receipt before issuing a building permit4.
At a glance
- Building permit
- Required, issued by the county Planning Department1
- Zoning
- Yes; confirm parcel-specific district rules and exceptions2
- Septic permits
- State-issued by TDEC, required before the county building permit4
- Owner-builder exemption
- Yes, one permit every two years for your own residence, not for sale or lease5
- Residential building permit fee
- $.70 per sq ft of livable space, porches, garages and storage6
- Adequate facilities tax
- $1.50 per heated/cooled sq ft, on top of the permit fee6
- Septic soil suitability
- 42.5% of soils rate favorably for a conventional drain field7
- Effective property tax rate
- 0.5% (about $1,547/year on the typical home)89
Who to call
Building permits
Robertson County Planning Department
Issues residential and pool building permits for unincorporated Robertson County, sets the order applicants must follow (septic, water tap, driveway permit, 911 address, deed, site plan and construction drawings), and collects the adequate facilities tax
511 S Brown St, Springfield, TN 37172
Zoning
Robertson County Planning Department
Maintains Robertson County's zoning maps and amendments, forwards variance and other applications to the Board of Zoning Appeals and Planning Commission, and issues certificates of occupancy and temporary use permits
527 S. Brown St. Springfield, TN 37172
Roads & driveways
Robertson County Highway Department
Issues the county driveway permit required before building on any new lot in unincorporated Robertson County
4751 Hwy 41N, Springfield, TN
Septic permits
Tennessee Department of Environment and Conservation (TDEC) - Septic Permits for Robertson County
Issues the state septic (subsurface sewage disposal) permit or confirms a sewer tap receipt, which Robertson County requires before it will issue a building permit
Contact details are copied from each office’s official page and were checked against it on September 29, 2026.
Do you need a building permit in Robertson County, Tennessee?
Yes. Robertson County requires a building permit for new construction, issued to the landowner or a licensed contractor, and construction drawings must comply with the 2021 International Building Codes16. Tennessee also runs a separate State Residential Building Permit program through the State Fire Marshal's Office, but that program applies only in "opt-out" or "non-code" areas that don't enforce their own local codes10. Robertson County enforces its own building codes through its Planning Department, so the state program's separate permit fees and inspection process do not apply here; use Robertson County's own permit process and fee schedule instead16.
Who is the Robertson County building department, and how do you reach them?
Robertson County's Planning Department handles building permits and is reachable at 511 S Brown St, Springfield, TN 37172, phone (615) 382-61986. The same department also has a listed contact point at 527 S. Brown St., Springfield, TN 37172, phone 615-384-3666, where it maintains zoning maps and records and issues certificates of occupancy and temporary use permits11. A residential building permit costs $.70 per total square foot of livable space plus porches, garages, storage and basements, and the county separately collects an adequate facilities tax of $1.50 per heated or cooled square foot6.
Does Robertson County have zoning?
Yes. Robertson County administers a county zoning ordinance and maintains zoning maps and amendment records211. Tennessee county zoning authority applies outside municipal corporations, so land inside a city may follow that municipality's rules instead3. Use the zoning map and resolution to confirm the parcel's district, permitted uses and exceptions before relying on a proposed use2. Buildings on land devoted to agricultural use and incidental to the agricultural enterprise can receive a narrower exemption from county zoning, but the exemption does not cover land near a state or federal-aid highway, public airport, public park, or the floodplain described by the state rule12. Robertson County tells agricultural applicants to inquire before construction6.
How do septic permits work in Robertson County?
The Tennessee Department of Environment and Conservation requires a Septic System Construction Permit to install a septic system or repair a faulty one in Robertson County134. Robertson County requires that permit, or a sewer tap receipt, before issuing a building permit; call 615-687-7000 or use the septic service request website listed by the county14. Review generally takes about 10 days and must be completed within 45 days of a complete application13. A conventional system permit is $400 for design flow up to 1,000 gallons per day, while an alternative-system permit is $500 at that flow; repair permits have no permit fee13. Only 42.5% of Robertson County soils avoid a "very limited" rating for a conventional drain field, so make septic feasibility a purchase contingency for a specific parcel7. A qualifying utility can require sewer connection where a building lot abuts a public way containing its sanitary sewer15.
Can you live in an RV or tiny home on your land in Robertson County?
We could not confirm a Robertson County-specific rule allowing residential or long-term RV use, temporary camping, or tiny-home occupancy on private land. Robertson County administers zoning and maintains parcel maps, so ask the Planning Department how the parcel's zoning district treats the proposed dwelling or temporary use before buying or moving one onto the land211. We also could not confirm county thresholds for minimum dwelling size, setbacks, lot coverage, building height or accessory dwellings; those questions need a parcel-specific answer from the Planning Department.
Building a home in Robertson County: the steps, in order
- Get your septic permit or a sewer tap receipt first; Robertson County's own permit page lists this as the first required step, reachable through the septic service request website or 615-687-700014.
- Get a water tap or meter receipt from your water provider, or a letter of intent or receipt from a well-drilling company if you're using a well6.
- Get a driveway permit from the Robertson County Highway Department, required for all new buildings, or from the state highway department if your access is on a state road1617.
- Get a 911 address verification letter from the Robertson County Emergency Communications Department, required for all new construction6.
- Pull a copy of the recorded deed in the current owner's name from the Register of Deeds office6.
- Prepare a site plan drawing showing the house, roadway, driveway, fencing, other buildings, septic tank and field lines, plus detailed construction drawings that comply with the 2021 International Building Codes6.
- If you're building your own home rather than hiring a contractor, you're limited to one owner-builder permit every two years, and the home can't be for sale, lease or rent; anyone you pay more than $25,000 generally has to be a licensed contractor518.
- Submit everything to the Planning Department and pay the residential building permit fee plus the adequate facilities tax before construction begins6.
What to check before you buy land in Robertson County
Soils and septic: 42.5% of Robertson County's soils rate favorably for a conventional drain field, better odds than many rural counties, but get a site evaluation before you count on it for a specific parcel7. Flooding: ask the Planning Department whether your parcel needs a flood elevation certificate, since one may be required before a building permit is issued6. Access: a driveway onto a county road needs a Robertson County Highway Department permit, while a driveway onto a state highway needs a separate permit from the state highway department1617. Sewer: if your lot abuts a street with sanitary sewer already available, the utility may be able to require you to connect rather than use a septic system15. Agricultural buildings: a barn or similar structure incidental to an agricultural enterprise can qualify for a narrower zoning exemption, but Robertson County still asks agricultural applicants to inquire before construction126. Taxes: the effective property tax rate here is about 0.5%, or roughly $1,547 a year on a typical home89.
Watch-outs
- Tennessee's separate State Residential Building Permit program and its published fee schedule apply only in areas without local code enforcement; Robertson County runs its own Planning Department permitting program with its own fees, so don't use the state's fee table for this county106.
- We could not confirm a Robertson County-specific rule on living in an RV or tiny home on your own land; ask the Planning Department directly before you rely on one11.
- The owner-builder exemption allows only one permit every two years for your own residence, not for sale or lease, and anyone you pay more than $25,000 generally must be a licensed contractor18.
Sources
- Robertson County Planning Department (2026 county census)
- Planning Department, quoted and re-checked
- Tennessee Attorney General Opinion No. 10-108 (Tennessee statewide rule), quoted and re-checked
- TDEC - Subsurface Sewage Disposal Systems (SSDS) (2026 county census)
- Can I build my own home without a license? (2026 county census)
- Robertson County Planning Department (robertsoncountytn.gov)
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Residential Permit FAQs (Tennessee statewide rule), quoted and re-checked
- Robertson County Planning Department (robertsoncountytn.gov)
- Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, Opinion No. 22-07 (Tennessee statewide rule), quoted and re-checked
- Septic System Construction Permit, quoted and re-checked
- Tennessee Department of Environment and Conservation (TDEC) - Septic Permits for Robertson County (robertsoncountytn.gov)
- Utility Customers Frequently Asked Questions (Tennessee statewide rule), quoted and re-checked
- Robertson County Highway Department (robertsoncountytn.gov)
- Highway Entrance Permits (Tennessee statewide rule), quoted and re-checked
- Can I build my own home without a license? (Tennessee statewide rule), quoted and re-checked
Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.