Building permits, zoning and septic rules in Robertson County, Tennessee

64Index Score / 100
#73 of 95 in Tennessee

Robertson County, Tennessee requires a residential building permit through the county Planning Department, which also administers county zoning1,2. Municipal zoning may apply independently inside incorporated towns, but septic permits for every address come from the Tennessee Department of Environment and Conservation, and the county requires that septic permit or a sewer tap receipt before issuing a building permit1,2,3.

Do you need a building permit in Robertson County, Tennessee?

Yes.

Yes. Robertson County requires a building permit for new construction, issued to the landowner or a licensed contractor, and construction drawings must comply with the 2021 International Building Codes1,4. Tennessee also runs a separate State Residential Building Permit program through the State Fire Marshal's Office, but that program applies only in "opt-out" or "non-code" areas that don't enforce their own local codes6. Robertson County enforces its own building codes through its Planning Department, so the state program's separate permit fees and inspection process do not apply here; use Robertson County's own permit process and fee schedule instead1,4.

Who issues building permits in Robertson County, and how do you reach them?

Robertson County's Planning Department handles building permits and is reachable at 511 S Brown St, Springfield, TN 37172, phone (615) 382-6198.

Robertson County's Planning Department handles building permits and is reachable at 511 S Brown St, Springfield, TN 37172, phone (615) 382-61984. The same department also has a listed contact point at 527 S. Brown St., Springfield, TN 37172, phone 615-384-3666, where it maintains zoning maps and records and issues certificates of occupancy and temporary use permits2. The department also conducts inspections as required to ensure compliance, though we could not confirm a published inspection schedule or when a certificate of occupancy is required2. A residential building permit costs $.70 per total square foot of livable space plus porches, garages, storage and basements, and the county separately collects an adequate facilities tax of $1.50 per heated or cooled square foot4. Mechanical permits and plumbing permits are $100 each1.

Does Robertson County have zoning?

Yes.

Yes. Robertson County administers a county zoning ordinance and maintains zoning maps and amendment records2. Tennessee county zoning authority applies outside municipal corporations, so land inside a city may follow that municipality's rules instead7. The Planning Department also administers and interprets the county's Subdivision Regulations, but we could not confirm the approval thresholds, so ask before dividing a tract2. Use the zoning map and resolution to confirm the parcel's district, permitted uses and exceptions before relying on a proposed use2. Buildings on land devoted to agricultural use and incidental to the agricultural enterprise can receive a narrower exemption from county zoning, but the exemption does not cover land near a state or federal-aid highway, public airport, public park, or the floodplain described by the state rule8. Robertson County tells agricultural applicants to inquire before construction4.

How do septic permits work in Robertson County?

The Tennessee Department of Environment and Conservation requires a Septic System Construction Permit to install a septic system or repair a faulty one in Robertson County.

The Tennessee Department of Environment and Conservation requires a Septic System Construction Permit to install a septic system or repair a faulty one in Robertson County3,9. Robertson County requires that permit, or a sewer tap receipt, before issuing a building permit; call 615-687-7000 or use the septic service request website listed by the county4. Review generally takes about 10 days and must be completed within 45 days of a complete application9. After installation, the applicant or installer must notify the state so the system can be inspected and approved before it is covered; the inspection fee is $100 for a conventional system and $200 for an alternative system9. A conventional system permit is $400 for design flow up to 1,000 gallons per day, while an alternative-system permit is $500 at that flow; repair permits have no permit fee9. Only 42.5% of Robertson County soils avoid a "very limited" rating for a conventional drain field, so make septic feasibility a purchase contingency for a specific parcel5. A qualifying utility can require sewer connection where a building lot abuts a public way containing its sanitary sewer10.

Can you live in an RV or tiny home on your land in Robertson County?

We could not confirm a Robertson County-specific rule allowing residential or long-term RV use, temporary camping, or tiny-home occupancy on private land.

We could not confirm a Robertson County-specific rule allowing residential or long-term RV use, temporary camping, or tiny-home occupancy on private land. Robertson County administers zoning and maintains parcel maps, so ask the Planning Department how the parcel's zoning district treats the proposed dwelling or temporary use before buying or moving one onto the land2. We also could not confirm county thresholds for minimum dwelling size, setbacks, lot coverage, building height or accessory dwellings; those questions need a parcel-specific answer from the Planning Department.

Building a home in Robertson County: the steps, in order

Get your septic permit or a sewer tap receipt first; Robertson County's own permit page lists this as the first required step, reachable through the septic service request website or 615-687-7000.

  1. Get your septic permit or a sewer tap receipt first; Robertson County's own permit page lists this as the first required step, reachable through the septic service request website or 615-687-70004.
  2. Get a water tap or meter receipt from your water provider, or a letter of intent or receipt from a well-drilling company if you're using a well4.
  3. Get a driveway permit from the Robertson County Highway Department, required for all new buildings, or from the state highway department if your access is on a state road4,11.
  4. Get a 911 address verification letter from the Robertson County Emergency Communications Department, required for all new construction4.
  5. Pull a copy of the recorded deed in the current owner's name from the Register of Deeds office4.
  6. Prepare a site plan drawing showing the house, roadway, driveway, fencing, other buildings, septic tank and field lines, plus detailed construction drawings that comply with the 2021 International Building Codes4.
  7. If you're building your own home rather than hiring a contractor, you're limited to one owner-builder permit every two years, and the home can't be for sale, lease or rent; anyone you pay more than $25,000 generally has to be a licensed contractor1,12.
  8. Submit everything to the Planning Department and pay the residential building permit fee plus the adequate facilities tax before construction begins4.

What to check before you buy land in Robertson County

Soils and septic: 42.5% of Robertson County's soils rate favorably for a conventional drain field, better odds than many rural counties, but get a site evaluation before you count on it for a specific parcel.

Soils and septic: 42.5% of Robertson County's soils rate favorably for a conventional drain field, better odds than many rural counties, but get a site evaluation before you count on it for a specific parcel5. Flooding: ask the Planning Department whether your parcel needs a flood elevation certificate, since one may be required before a building permit is issued4. Access: a driveway onto a county road needs a Robertson County Highway Department permit, while a driveway onto a state highway needs a separate permit from the state highway department4,11. Sewer: if your lot abuts a street with sanitary sewer already available, the utility may be able to require you to connect rather than use a septic system10. Agricultural buildings: a barn or similar structure incidental to an agricultural enterprise can qualify for a narrower zoning exemption, but Robertson County still asks agricultural applicants to inquire before construction4,8. Taxes: the effective property tax rate here is about 0.5%, or roughly $1,547 a year on a typical home5.

Watch-outs

  • Tennessee's separate State Residential Building Permit program and its published fee schedule apply only in areas without local code enforcement; Robertson County runs its own Planning Department permitting program with its own fees, so don't use the state's fee table for this county4,6.
  • We could not confirm a Robertson County-specific rule on living in an RV or tiny home on your own land; ask the Planning Department directly before you rely on one2.
  • The owner-builder exemption allows only one permit every two years for your own residence, not for sale or lease, and anyone you pay more than $25,000 generally must be a licensed contractor12.

Sources

12 official pages, each quoted and re-checked · written October 9, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Robertson County requires a building permit for a home.

RuleRobertson CountyDavidson CountyCheatham CountySumner CountyMontgomery CountyWilson CountyDickson County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsTDECMetro Public Health Dept.TDECTDECTDECTDECTDEC

County locator

Robertson County in Tennessee

64
County map
Robertson County highlighted among the Tennessee counties · colored by Index score

How Robertson County scores

64 / 100 · #73 of 95 in Tennessee · six factors, land price, tax, rain and climate

Seclusion29100% ev.
Self-Sufficiency76100% ev.
Admin Boringness46100% ev.
Durability76100% ev.
Property Autonomy71100% ev.
Carry Cost72100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$374kTypical home
0.5%Property tax
$7,424Land / acre
52"Annual rain
2.3% of yrsSevere drought
10.3 / yr (+9.4)Mid-century 100°F days
14.8 daysMid-century dry spell
2.3" (+8.8%)Mid-century 1-day rain
1.6×Wildfire change factor
100%Forward climate coverage
$1,708Home insurance / yr
1% / yrInsurance growth
1.03%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
55,005People within 30 min
3,314,943People within 2 hr
139,327Radius comparison (15 mi)
161.2People / sq mi
0%Federal land
80%Land at 15% slope or less
42.5%Soils rated "not limited" for septic (strict USDA rating)
126,986 acWorkable land screen
34.9%Wooded land
64.5 tonsBiomass / forest ac
58.4°FAvg temp

Scout Robertson County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Robertson County. Listing sites control their own results and filters.

Sell land in Robertson County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Robertson County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet covered: Cedar Hill · Cross Plains · White House

Answers from the rulebook for Robertson County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Robertson County rules

  • Building permitRequired

    New buildings and construction requiring Robertson County building permits.

    • Permits are issued only to the landowner or contractor.
    • A current contractor license is required when a contractor is used.
    • The listed prerequisite sequence includes septic or sewer documentation, water documentation, driveway permit, 911 address verification, deed, site plan, and construction drawings.
    “PLEASE OBTAIN BUILDING PERMITS IN THE ORDER AS FOLLOWS:”
  • Owner-builder exemptionConditional

    Owner-built residential construction in unincorporated Robertson County

    • The county issues building permits to the landowner or a licensed contractor, so owners can pull their own permit.
    • This is not a permit exemption: permit, septic or sewer, water tap, driveway permit, deed and site plan are all required.
    • Plans must comply with the 2021 International Building Codes and 2018 energy codes.
    “permits are issued to the landowner or contractor only.”
  • Building code adoptedPartial

    Residential and other construction reviewed through Robertson County's building-permit process.

    • Robertson County's permit page requires construction drawings compliant with the 2021 International Building Codes and the 2018 Energy codes.
    • The state source separately identifies statewide currently adopted code editions, including 2021 IBC, 2018 IRC, 2021 commercial IECC, and 2018 residential IECC.

    International Building Code: 2021 edition · Energy codes: 2018 edition

    “PROVIDE LEGIBLE DETAILED CONSTRUCTION DRAWINGS (copy for the office to keep-PDF is acceptable) for all structures in compliance with the 2021 International Building Codes and the 2018 Energy codes.”
  • InspectionsRequired

    Inspections conducted by Robertson County Planning for compliance with applicable regulations.

    • The county page states inspections are conducted as required; it does not publish a complete inspection schedule on the opened page.
    • The planning director has authority to enter premises for inspections necessary to carry out authorized duties.
    “Conducts inspections as required to ensure compliance with regulations. The Director of Planning and Zoning possesses the right to enter upon any premises for the purpose of making inspections of buildings or premises necessary to carry out his authorized duties.”
    One more reviewed finding on this topic
    • Limited — Building and premises inspections conducted by Robertson County Planning.
      “Conducts inspections as required to ensure compliance with regulations. The Director of Planning and Zoning possesses the right to enter upon any premises for the purpose of making inspections of buildings or premises necessary to carry out his authorized duties.”
  • County-wide zoningPresent (with conditions)

    County zoning administration and zoning records in Robertson County.

    • The official page identifies county zoning administration and zoning maps; the linked zoning resolution should be consulted for parcel-specific district rules and exceptions.
    “administering and interpreting the Zoning Ordinance”
  • Local zoningPresent (with conditions)

    County-administered zoning in Robertson County, including the county planning office's administration and interpretation of the Zoning Ordinance.

    • This claim addresses the county zoning program; incorporated municipalities may administer separate local rules.
    “This department is responsible for the support of the County Commission, Planning Commission, Highway Commission, and other boards for the routine processes of administering and interpreting the Zoning Ordinance, Subdivision Regulations, and for specific research as needed.”
    One more reviewed finding on this topic
    • Present (with conditions) — County-administered zoning in Robertson County, including the county zoning ordinance and zoning maps.
      “This office: [...] Maintains and keeps current zoning maps and records of amendments of maps. [...] This department is responsible for the support of the County Commission, Planning Commission, Highway Commission, and other boards for the routine processes of administering and interpreting the Zoning Ordinance, Subdivision Regulations, and for specific research as needed.”
  • Zoning districtsPublished (with conditions)

    Robertson County zoning maps and zoning ordinance materials.

    • The county planning page links to Robertson County Zoning Ordinances and a Robertson County Zoning Map.
    • The planning office maintains current zoning maps and records of map amendments.
    “Maintains and keeps current zoning maps and records of amendments of maps.”
    One more reviewed finding on this topic
    • Published (with conditions) — Robertson County zoning maps and zoning-record amendments.
      “Maintains and keeps current zoning maps and records of amendments of maps. [...] Robertson County Zoning Ordinances [...] Robertson County Zoning Map”
  • Living in an RVLimited

    RV occupancy in Robertson County under the county Zoning Resolution

    • A recreational vehicle is not to be used as a permanent residence.
    • RV parks or campsites need a zoning administrator-approved site plan, minimum 5 acres, 15 to 300 spaces, spaces 50 ft from public streets and property lines, one RV or manufactured dwelling per space.
    • RV parks are a listed use in the permitted use schedule (Table 6-a); district-by-district status was not resolved.
    • RVs in a special flood hazard area must be on site fewer than 180 consecutive days, be ready for highway use, or meet new-construction standards.

    RV park minimum tract area: >= 5 acres · RV park spaces: 15 to 300 spaces

    “a recreational vehicle is not to be used as a permanent residence.”
  • Septic permitRequired

    New construction in Robertson County using septic rather than a public sewer connection.

    • The county lists an actual septic permit or sewer tap receipt as the first item in the building-permit sequence.
    • A sewer tap receipt is an alternative to a septic permit.
    • The underlying septic permitting program is administered by Tennessee.
    “Actual Septic Permit or Sewer Tap Receipt by visiting the Septic Service Request website or call 615-687-7000.”
  • Mandatory utility hookupConditional

    New building permit applications in Robertson County.

    • Applicants must provide a water tap or meter receipt from the water provider.
    • For well water, a letter of intent or receipt from the well-drilling company is required.
    • The first listed option is an actual septic permit or sewer tap receipt.
    • The page states applicants should be able to secure a water tap and septic.
    “Water Tap or Meter receipt from the water provider. Well water requires a letter of intent or receipt from Well drilling company.”
  • Subdividing landRegulated (with conditions)

    Subdivision regulation administered through Robertson County planning processes.

    • The county planning department administers and interprets the Subdivision Regulations.
    • Specific subdivision standards and approval thresholds were not extracted from the ordinance during this run.
    “This department is responsible for the support of the County Commission, Planning Commission, Highway Commission, and other boards for the routine processes of administering and interpreting the Zoning Ordinance, Subdivision Regulations, and for specific research as needed.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision regulation administered through Robertson County planning processes.
      “This department is responsible for the support of the County Commission, Planning Commission, Highway Commission, and other boards for the routine processes of administering and interpreting the Zoning Ordinance, Subdivision Regulations, and for specific research as needed.”
  • Driveway accessRequired

    Driveway access for all new buildings in Robertson County where the county highway department or state highway department has jurisdiction.

    • A driveway permit is required for all new buildings.
    • The permit is obtained from the Robertson County Highway Department or, where applicable, the State Highway Department.
    • The county page lists the relevant office addresses, telephone numbers, and office hours.
    “Driveway Permit (Required for ALL NEW BUILDINGS) from Robertson County Hwy Dept.”
  • Building in a floodplainLimited

    Building permit applications in areas where flood elevation documentation is applicable.

    • A Flood Elevation Certificate may be required if applicable.
    • The opened county page does not specify the floodplain boundary, elevation threshold, or additional floodplain construction standards.
    “Flood Elevation Certificate and/or Sprinkler Plan may be required if applicable.”
    One more reviewed finding on this topic
    • Limited — Building permit applications where flood elevation documentation is applicable.
      “Flood Elevation Certificate and/or Sprinkler Plan may be required if applicable.”
  • Permit feesPublished (with conditions)

    Residential, commercial/industrial, agricultural, mechanical, plumbing, remodeling, moving, and pool permits administered by Robertson County Planning.

    • Residential building fees are calculated by square footage and applicable facilities taxes.
    • Commercial/industrial permit fees refer to a separate fee schedule.
    • Agricultural permit applicants are instructed to inquire before construction.

    residential building permit: 0.7 USD per total square foot (livable space plus porches, garages, storage, basements, and other listed space) · adequate facilities residential building permit: 1.5 USD per heated/cooled livable square foot (Adequate Facilities Tax) · mechanical permit: 100 USD · plumbing permit: 100 USD · archives and records: 5 USD · residential remodeling/renovation: 0.5 USD per square foot · house moving permit: 175 USD (Applicable fees also include building/renovation permits, AFT, and archives and records) · above-ground swimming pool: 100 USD · in-ground swimming pool: 250 USD

    “Residential Building Permit | $.70 Total square ft. livable space + porches, garages, storage, basements, etc. Total = Permit Fee [...] Adequate Facilities Residential Building Permit | $1.50 per Heated/Cooled square ft. livable space = Adequate Facilities Tax [...] Mechanical Permits | $100.00 [...] Plumbing Permits | $100.00 [...] Archives & Records | $5.00 [...] House Moving Permit (must obtain prior approval for moving house) | $175.00 Applicable Fees House Moving Permit + Building/Renovation Permits + AFT + Archives & Records = TOTAL [...] Agricultural Permits | Please inquire prior to construction.”
    One more reviewed finding on this topic
    • Published (with conditions) — Robertson County building and related permit fees.
      “Residential Building Permit | $.70 Total square ft. livable space + porches, garages, storage, basements, etc. Total = Permit Fee”
  • Permit processPublished (with conditions)

    Robertson County building permit application process.

    • The page directs applicants to submit required documents, after which the request is reviewed; applicants are then contacted to pay fees and receive the permit.
    • The listed sequence includes septic or sewer, water, driveway, 911 address, deed, site plan, and construction drawings.
    • Pool permit requirements are separately listed.
    • Agricultural permits require inquiry before construction.
    “Once your request has been submitted and reviewed you will be contacted to pay fees and receive your permit.”

Tennessee rules that apply here

  • Certificate of occupancyLimited

    Certificates of occupancy for one- and two-family dwellings in Tennessee opt-out or non-code jurisdictions when the State Fire Marshal's Office inspects the dwelling during construction.

    • The owner or contractor may obtain a state building permit to request the inspection.
    • The Certificate of Occupancy is released only if the dwelling is determined to meet statewide building construction safety standards.
    • The source describes this process for opt-out or non-code jurisdictions and for new construction or additions to existing homes.
    “determined to meet the statewide building construction safety standards, the State Fire Marshal’s Office will release a Certificate of Occupancy”
  • Camping on your landLimited

    Overnight camping on Tennessee Wildlife Resources Agency-controlled Wildlife Management Areas and related lands where overnight camping is allowed.

    • Overnight camping may be permitted only in designated areas and by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor.
    • Camping is subject to limitations prescribed in the permit if required.
    • Camping may not exceed three weeks from the beginning to the end of the camping stay.
    • Owner contact information or a TWRA ID number and date of arrival must be displayed on a camper, tent, vehicle, or similar item at all times.
    • Where overnight camping is allowed, firearms and archery equipment must remain in camp except during legal hunting hours.

    maximum camping stay: <= 3 weeks

    “May be permitted in designated areas by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor. Such camping is subject to the limitations prescribed in the permit if required.”
    One more reviewed finding on this topic
    • Limited — Camping and use of trailers or other camper units in Tennessee state forests administered by the Tennessee Department of Agriculture, Division of Forestry.
      “Camping and the use of trailers or other camper units are allowed only at designated locations. The district forester will issue written permits to persons to camp in backcountry or other isolated sections of a forest area.”
  • Tiny homesAllowed (with conditions)

    Preassembled permanent tiny homes delivered to a homeowner as a completed unit, including a tiny home built off-site on a chassis or installed on a permanent foundation.

    • The State Fire Marshal’s Office says its inspection program allows construction, inspection, and permanent consumer use of tiny homes and similar structures.
    • The program inspection is described as similar to inspections of a site-built home and provides a decal reflecting compliance with adopted statewide building and electrical codes.
    • State residential-code regulations apply to new construction; additions over 30 square feet have been covered since October 1, 2011.
    • A state residential building permit is not zoning approval and does not authorize violation of a local ordinance; local zoning or other local requirements may independently control placement or occupancy.
    • If a subsurface sewage system will serve the residence, a conventional septic-system permit is required for installation of a conventional system or approved substitute product; an alternative-system permit is required for installation of an alternative system.
    • If a water well is drilled or a well pump or water-treatment device is installed, the work must be performed by a licensed person.

    addition area triggering state residential-code regulation: > 30 square feet (Applies to additions beginning October 1, 2011.)

    “The new tiny home inspection program was developed to allow for the construction, inspection and use of tiny homes and similar structures for permanent use by consumers.”
  • Manufactured homesLimited

    HUD-labeled manufactured homes installed in Tennessee under the state manufactured-housing program.

    • Manufactured homes must be installed by licensed installers and have an installation decal applied after setup.
    • A state residential building permit is not required merely to place a manufactured or modular home in the state program, but a Manufactured/Modular Site Work Permit is required for a custom addition, site-built deck, porch, or stoop next to the home.
    • A state residential building permit is not zoning approval and does not authorize violation of a local ordinance; local zoning or other local requirements may independently control siting or occupancy.
    • If a subsurface sewage system will serve the residence, state septic-system permitting applies.
    “Ensure your application is approved and your license is active prior to installing any manufactured home in the state of Tennessee”
  • Who permits septicMixed (with conditions)

    Tennessee subsurface sewage disposal system construction permitting and related SSDS administration statewide.

    • The Tennessee Division of Water Resources administers SSDS permitting in non-contract counties.
    • Permit packages and Certificate of Completion packages for sites in contract counties are submitted directly to the contract county.
    • The listed contract counties are Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby, and Williamson.
    • Installer permits are valid statewide, but contract counties may require an additional permit.
    “Permit packages and Certificate of Completion Packages for sites located in the contract counties listed below should be submitted directly to the contract county.”
    3 more reviewed findings on this topic
    • State (with conditions) — Subsurface sewage disposal systems serving property in Robertson County.
      “Any individual or property owner who desires to have a subsurface sewage disposal (septic) system installed on their property or requiring repair to an existing faulty system must get a Septic System Construction Permit. [...] The Division inspects each SSDS installation to ensure that it was installed in accordance with permit conditions and regulatory requirements. [...] Applicants may refer to the following publications for further information: [...] TCA Section 68-221-401..414 Subsurface Sewage Disposal Systems”
    • State (with conditions) — Subsurface sewage disposal permitting applicable in Robertson County.
      “Subsurface Sewage Disposal Systems (SSDS) This includes Septic Tank Pumping Contractor, Domestic Septage Disposal Site, Septic System Installer and Septic System Construction Permits.”
    • Mixed (with conditions) — Statewide subsurface sewage disposal system permitting and assistance, with specified contract counties providing ground water protection services in their own areas.
      “NOTE: Some counties provide ground water protection services for their own areas. The online application form is not to be submitted for services requested in the following metropolitan or contact counties: Blount County, Davidson County/Nashville, Hamilton County, Jefferson County, Knox County, Madison County, Sevier County, Shelby County, Williamson County.”
  • Septic inspectionRequired

    Installation of subsurface sewage disposal systems in Tennessee.

    • The installer must notify the Division when installation is complete.
    • A final inspection is scheduled before the system is covered.
    • TDEC inspects each SSDS installation for compliance with permit conditions and regulatory requirements.
    • Inspection fees vary by system type: $100 for new conventional or large-diameter graveless pipe systems, $200 for alternative systems, and $100 for repair construction inspections.

    new conventional construction inspection fee: 100 USD · alternative construction inspection fee: 200 USD · repair construction inspection fee: 100 USD

    “The applicant or SSDS installer must notify the Division when a system has been installed so that it can be inspected and approved.”
    One more reviewed finding on this topic
    • Required — SSDS installations in Robertson County.
      “New Conventional or Large Diameter Graveless Pipe SSDS Construction Inspection | $100 [...] New Alternative SSDS Permit [...] Alternative SSDS Construction Inspection | $200 [...] Repair Construction Inspection | $100 [...] The applicant or SSDS installer must notify the Division when a system has been installed so that it can be inspected and approved. [...] The Division inspects each SSDS installation to ensure that it was installed in accordance with permit conditions and regulatory requirements.”
  • Off-grid sanitationLimited

    Construction, modification, or repair of an on-site subsurface sewage disposal (septic) system, including systems serving residential, commercial, and industrial properties in Tennessee.

    • A septic-system permit is required for construction, modification, or repair.
    • An applicant planning a new system, or repair or modification of an existing system, must apply for a permit.
    • A TDEC Environmental Scientist conducts a site evaluation and may request a detailed site plan or soils map from a private licensed soil consultant.
    • If a permit is issued, the applicant provides it to a licensed installer; after installation, the installer contacts the local Environmental Scientist for a final inspection before the system is covered.
    • A Certificate of Completion is issued if the installation is approved.
    “A septic system permit is required for the construction, modification or repair of a septic system.”
  • Well permitRequired

    Drilling a water well for production of water from underground sources in Tennessee.

    • Before drilling, the property owner or licensed well driller must submit a Notice of Intent to the Director in the Department-prescribed manner.
    • A driller must have documentation that the Notice of Intent was submitted to the Division of Water Resources before beginning operations at a drill site.
    • The Notice of Intent fee or a receipt must accompany the driller's report; no well or borehole may be drilled unless the driller has documentation that a Notice of Intent has been filed.
    • A Notice of Intent and fee are not required for well closure, deepening, or reworking of a water well or closed-loop geothermal borehole.
    • The Notice of Intent fee requirement does not apply in a qualifying local jurisdiction authorized to regulate well location and construction that has a Commissioner-approved inspection fee.
    • The Notice of Intent fee does not apply when the property owner filed a notice and paid the fee for the same property within the previous five years, provided the new notice identifies the first notice's identification number.
    • A Notice of Intent expires 180 days after its original filing date.

    Notice of Intent fee for water wells for production of water per property site: 75 USD (Not required for qualifying local jurisdictions or when the same property satisfies the five-year prior-notice exception.) · Notice of Intent expiration: 180 days

    “A Notice of Intent to drill a water well must be submitted by the property owner or the licensed well driller to the Director in the manner prescribed by the Department, prior to commencement of drilling a water well in Tennessee.”
  • Agricultural exemptionConditional

    Buildings or structures on land used for agricultural purposes and subject to county zoning regulation in Tennessee.

    • The building or structure must be located on lands devoted to agricultural uses.
    • The building or structure must be incidental to the agricultural enterprise.
    • The exemption does not apply to agricultural lands adjacent or in proximity to state or federal-aid highways, public airports, or public parks.
    • The exemption does not apply to land located within the one-hundred-year flood plain.
    • The Attorney General opinion states that the provision applies to counties only and has no application to municipalities.
    • There is no blanket exemption for cotton gins, grain elevators, slaughterhouses, processing plants, or milk bottling plants; those structures qualify only when the statutory conditions are met.
    “it must be located on lands “devoted to agricultural uses;” and (2) it must be “incidental to the agricultural enterprise.””
  • Shed and accessory-building permit exemptionAvailable (with conditions)

    State residential building permits for detached garages, sheds, barns, and other detached structures that are not used for living purposes.

    • This is an exemption from the state residential building permit, not an exemption from all state or local requirements.
    • The State Residential Building Code Enforcement Program applies only in areas that have not received an SFMO exemption through local-code enforcement and have not opted out by a two-thirds vote of the city or county legislative body.
    • The exemption stated by the Department is limited to detached structures not used for living purposes; the opened official page does not state an accessory-structure size threshold.
    • The state residential building permit is not zoning approval and does not authorize violation of state law, regulation, or local ordinance.
    “A state residential building permit is not required for detached garages, sheds, barns or other detached structures that are not used for living purposes.”
  • county zoning authorityGeneral

    County legislative bodies adopting zoning regulations for portions of Tennessee counties outside municipal corporations.

    • The authority is exercised under the conditions and procedures in Tennessee Code Annotated §§ 13-7-101 through 13-7-119.
    • The grant applies to portions of counties outside municipal corporations.
    • County zoning authority does not authorize county building permits or regulation of buildings or structures on agricultural land when the building or structure is incidental to the agricultural enterprise, except on agricultural lands adjacent or in proximity to state federal-aid highways, public airports or public parks.
    • The agricultural-land limitation applies to counties only and has no application to municipalities.
    “Under Tenn. Code Ann. § 13-7-101, et seq., the General Assembly has expressly delegated the authority to county legislative bodies to enact zoning regulations and create a board of zoning appeals.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Minimum dwelling size — Minimum dwelling-size requirements in Robertson County.
  • Minimum lot size — Minimum lot-size requirements in Robertson County.
  • Setbacks — Building setbacks in Robertson County.
  • Lot coverage — Lot-coverage requirements in Robertson County.
  • Building height — Building-height requirements in Robertson County.
2 more unanswered
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Robertson County, Tennessee

Is Robertson County a good place to live off-grid or homestead?

Robertson County scores 64/100 on the Bolthole Index, a strong county profile. Its strengths: strong self-sufficiency basics: 52″/yr rainfall with little drought and mixed durability signals. Watch-outs: about 55,005 people within a 30-minute drive.

How much does land cost in Robertson County, Tennessee?

Land in Robertson County runs about $7,424 per acre, based on the latest county data.

What is the water situation in Robertson County?

Robertson County gets about 52" of rain a year, with severe drought in roughly 2.3% of years.

How remote is Robertson County?

A representative private-land location has about 55,005 people within a 30-minute drive and 3,314,943 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Robertson compares in Tennessee