Unincorporated Blount County, Tennessee requires a written building permit before most construction, structural alterations, building moves or changes in use, with exceptions that include agricultural uses and accessory farm buildings1. Blount County Development Services enforces commercial and residential regulations from the 2018 ICC edition through plan review and inspections2. Blount County Environmental Health administers septic services locally under Tennessee standards3.
Do you need a building permit in Blount County, Tennessee?
Unincorporated Blount County requires a written building permit before erecting, structurally altering or moving a building or structure, or changing the use of a building or land.
Unincorporated Blount County requires a written building permit before erecting, structurally altering or moving a building or structure, or changing the use of a building or land1. Listed exceptions include maintenance or interior finishes in one- or two-family residences, agricultural uses, accessory farm buildings and home gardening1. Development Services enforces commercial and residential rules from the 2018 ICC edition through plan review and inspection2. After permit issuance, the contractor or owner must schedule required inspections1. Building fees are based on project valuation and may include review fees, while other published charges vary by permit type8. Qualifying agricultural uses and structures receive the zoning exemption provided by Tennessee law, and the county permit manual separately exempts agricultural uses and accessory farm buildings from the written building-permit requirement1,9.
Who is the Blount County building department, and how do you reach it?
Blount County Development Services, through the Office of the Building Commissioner, issues building permits and enforces county zoning.
Blount County Development Services, through the Office of the Building Commissioner, issues building permits and enforces county zoning10. The office is at 303 McGhee Street, Maryville, TN 37801; call 865-681-9301 or email development@blounttn.org10. Development Services accepts construction-permit applications, collects fees, issues permits, schedules inspections, keeps permit records and issues occupancy certificates2. The Blount County Planning Department supports the Planning Commission and provides general planning services11. Planning also implements rezoning and subdivision processes and approves plats1. Properties within a municipality need a separate city check because Blount County's zoning resolution applies outside municipal limits and municipal zoning is administered separately4.
Does Blount County have zoning?
Blount County zoning covers land outside municipal limits, while incorporated municipalities administer their own zoning.
Blount County zoning covers land outside municipal limits, while incorporated municipalities administer their own zoning4. The county zoning map assigns districts and flood-hazard and airport-hazard overlays, so the parcel's mapped district controls the answer4. District rules vary by use and can govern lot size, density, setbacks, height and special exceptions5. In applicable residential provisions, the minimum lot size can be 32,670 square feet per unit, but that figure is not a countywide default4. Typical cited setbacks are 30 feet from a road right-of-way or easement, 20 feet at the rear for a principal structure and 10 feet at the side, with road class, plats, accessory buildings and special exceptions changing the result5. Single-family, duplex and accessory structures are generally limited to 35 feet, subject to district-specific exceptions5.
How do septic permits work in Blount County?
Blount County Environmental Health administers subsurface sewage services locally under standards set by the Tennessee Department of Environment and Conservation.
Blount County Environmental Health administers subsurface sewage services locally under standards set by the Tennessee Department of Environment and Conservation3. A septic construction permit is required before installing a new system or repairing a failed one, and permit packages for Blount County sites go directly to the county6,12. The published county fee is $400 for a septic-system permit or modification, with no charge listed for a repair permit8. Only about 20% of county soils are rated without severe limitations for a conventional drain field, so verify a primary and reserve field before fixing the house location13. Some district rules require both septic-field areas to remain unobstructed by buildings, parking, drainage or other site elements9. A final septic inspection is required for new systems, repairs and modifications14.
Can you live in an RV or tiny home on land in Blount County?
Blount County's confirmed RV occupancy rule applies to commercial campgrounds and RV parks, not every private parcel.
Blount County's confirmed RV occupancy rule applies to commercial campgrounds and RV parks, not every private parcel4. In those regulated parks, permanent residences are prohibited and ordinary occupants may stay no more than 60 days in any 365-day period, subject to the stated seasonal-worker exception4. We could not confirm a general rule for temporary RV occupancy on an individual unincorporated parcel; ask the Building Commissioner about the parcel's district and proposed use10. We also could not confirm a tiny-home-specific occupancy rule or a general minimum dwelling floor area. A tiny home used as a residence would still need to fit the applicable zoning district, building-permit path and septic approval1,5,6. Manufactured-home dwellings are permitted only in the county zoning districts that allow them, and building, utility, septic and inspection requirements may still apply5.
Building a home in Blount County: the steps, in order
Ask the Building Commissioner to identify the parcel's county zoning district and overlays, or confirm that municipal rules apply instead.
- Ask the Building Commissioner to identify the parcel's county zoning district and overlays, or confirm that municipal rules apply instead4,10.
- If the project divides land, take the plat through Planning because subdivision regulations apply alongside county zoning1,4.
- Establish septic feasibility and obtain the required construction permit from Blount County Environmental Health3,6.
- Choose a licensed contractor or confirm the Tennessee owner-builder path; that path is limited to an owner-used residence and carries timing and contractor restrictions7.
- Submit plans, pay the applicable valuation- or permit-based fees and obtain the written building permit before covered work begins1,2,8.
- Obtain a TDOT entrance permit if the driveway connects to state-highway right-of-way15.
- Schedule required building and septic inspections, then obtain the applicable occupancy or completion certificate before moving in1,2,14.
What should you check before buying land in Blount County?
Confirm the parcel's jurisdiction, zoning district, permitted use, lot standard, setbacks and overlays before relying on a listing description.
Confirm the parcel's jurisdiction, zoning district, permitted use, lot standard, setbacks and overlays before relying on a listing description4,5,9. In the R-2 district, vacation cabin rentals and tourist accommodations require a special exception rather than being allowed automatically4. Check septic suitability early because only about 20% of county soils avoid severe limits for a conventional drain field13. The county's separate floodplain resolution applies within the mapped Flood Hazard Overlay, and development there can require professional elevation certification4,16. A state-highway driveway requires TDOT approval; the county's confirmed driveway geometry applies only to commercial campgrounds and RV parks, so ask the Building Commissioner about other county-road access4,10,15. Ask Environmental Health about private-well requirements because a county well-permit rule was not confirmed3.
Watch-outs
- County zoning stops at municipal limits; a Maryville, Alcoa, Louisville or other municipal address needs its own local zoning check4.
- The mapped Flood Hazard Overlay has separate county controls, and development there may need a qualified engineer to establish the minimum floor elevation before a building permit is issued4,16.
- The agricultural zoning exception applies only as provided by Tennessee law; confirm that the proposed use and structure qualify before relying on it9,17.
Sources
17 official pages, each quoted and re-checked · written October 7, 2026
- Permitting Process Reference Manual
- Development Services
- Environmental Health
- Zoning Regulations of Blount County, Tennessee
- Revised Zoning Regulations
- Underground Injection Control Permit
- Can I build my own home without a license? (Tennessee statewide rule)
- Blount County Development Services Fee Schedule
- Zoning Regulations of Blount County, Tennessee
- Blount County Development Services (Office of the Building Commissioner) (blounttn.gov)
- Blount County Planning Department (blounttn.gov)
- Septic System Construction Permit (Tennessee statewide rule)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Definitions of Services
- Highway Entrance Permits (Tennessee statewide rule)
- Subdivision Regulations (7/27/2023 Revision)
- Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, Opinion No. 22-07 (Tennessee statewide rule)
Written October 7, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Blount County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.