Unincorporated Union County, South Dakota requires a building permit before construction, and Union County Planning and Zoning provides the application and administers county zoning12. County zoning uses district-specific rules for land use, setbacks and building height34. South Dakota sets minimum on-site wastewater standards, while local governments may impose stricter requirements5.
At a glance
- Building permit
- Required before construction in unincorporated Union County1
- Zoning
- County zoning applies with district-specific use and development standards34
- Permit office
- Union County Planning and Zoning2
- Septic
- State minimum standards apply; confirm the residential approval process locally56
- RV living
- Long-term occupancy was not confirmed; ask Planning and Zoning2
- Tiny homes
- No specific occupancy rule confirmed; county permits and zoning still apply13
- Owner electrical work
- A limited licensure exemption exists, but a homeowner permit and inspections remain required7
- County-road access
- The Highway Department publishes a highway access permit application8
Who to call
Building permits
Union County Planning and Zoning
Building-permit applications, zoning questions, conditional uses and variances for Union County
209 E. Maint Street, Suite 100, Elk Point, SD 57025
Roads & driveways
Union County Highway Department
Highway access permits and work within or across Union County highway rights-of-way
501 E. Pleasant Street, Elk Point, SD 57025-2159
Septic permits
South Dakota DANR On-Site Wastewater Systems
State on-site wastewater installation standards and information about system-plan review
523 E Capitol Ave, Pierre, SD 57501-3182
Contact details are copied from each office’s official page and were checked against it on September 27, 2026.
Do you need a building permit in Union County, South Dakota?
Yes. Unincorporated Union County requires a building permit before construction, and the county Planning and Zoning office provides the application12. Applications go to the Office of Planning and Zoning and must identify the work, describe the land and proposed use or occupancy, include a site plan, carry the applicant's signature, and supply other information the Planning Director requests9. The Planning Director reviews the application, and applicable fees must be paid before issuance9. We could not confirm which separate construction-code edition, routine county inspections or certificate-of-occupancy process applies to every project, so ask Planning and Zoning what plan details and inspections your particular build needs2.
Who is the Union County building department, and how do you reach it?
Union County Planning and Zoning is the practical first stop for a building permit or rural zoning question12. Call 605-356-3354 or visit 209 E. Maint Street, Suite 100, Elk Point, SD 570252. The county page provides the building-permit application as well as variance and conditional-use forms2. Before preparing plans, give the office the parcel location and intended use and ask which zoning district controls; the county ordinance divides land among Agricultural, Rural Residential, Commercial, Floodplain Conservation, Planned Development and other districts4. Also ask for the current fee schedule because the reviewed materials establish that fees are due but do not supply current amounts9.
Does Union County have zoning?
Yes. Union County has adopted zoning regulations for unincorporated land, and district rules control uses and development standards34. In the Agricultural District, the stated yards are 50 feet in front, 20 feet at the side and 30 feet at the rear10. The Agricultural District ordinarily caps structures at 35 feet and requires a conditional-use permit above that height, while identified farm structures and wind-energy systems have an exception outside an airport approach zone11. Those figures are not universal parcel standards because other districts differ104. We could not confirm a countywide minimum dwelling size, accessory-dwelling rule or broad agricultural exemption from local permits; take the parcel and proposed use to Planning and Zoning before relying on a design2.
How do septic permits work in Union County?
South Dakota's minimum on-site wastewater standards apply in Union County, and local government may impose stricter requirements5. DANR publishes the statewide installation requirements and directs system-plan questions to its on-site wastewater program6. The reviewed materials do not confirm a universal permit or inspection procedure for every ordinary residential system in Union County, so ask Union County Planning and Zoning and DANR what review applies before choosing a location or hiring an installer26. Only about 24.9% of Union County soils rate without severe limitations for a conventional drain field, making a site and soil evaluation an important early contingency12. South Dakota also treats unconventional sanitation systems other than vault privies as experimental and requires plans and specifications to be approved before installation13.
Can you live in an RV or tiny home on your land in Union County?
We could not confirm a Union County rule that specifically allows or prohibits long-term RV occupancy, temporary camping or tiny-home occupancy on private land; ask Planning and Zoning about the parcel, zoning district and proposed utilities before buying2. A tiny home is not automatically outside the local process because unincorporated Union County requires a building permit before construction and applies county zoning13. Manufactured homes have a defined but conditional path: qualifying units must have been constructed on or after July 15, 1976, have an exterior dimension of at least 24 feet excluding overhangs, extend foundation walls and piers at least 42 inches below final grade, and have a roof pitch of at least 3 in 1214.
Building a home in Union County: the steps, in order
- Confirm that the site is in unincorporated Union County, then ask Planning and Zoning for its district and permitted-use rules32.
- Confirm legal road access; for a county highway, the Union County Highway Department publishes an access-permit application, while a connection to a state highway needs South Dakota Department of Transportation permission before construction815.
- Submit the building-permit application with the land description, proposed use, site plan, signature and requested supporting information9.
- Confirm the septic design and review path with Planning and Zoning and DANR before fixing the house location56.
- Obtain required state electrical and plumbing approvals; electrical work needs rough-in and final inspections, and covered plumbing installations need an inspection certificate1617.
What should you check before buying land in Union County?
Access: contact the Union County Highway Department at (605) 356-2351 at 501 E. Pleasant Street, Elk Point, SD 57025-2159 for a county-highway access application8. Flood risk: development in a regulated floodplain requires a permit in participating South Dakota communities, so ask Planning and Zoning who administers floodplain review for the parcel182. Soils: about 24.9% of county soils rate without severe limitations for a conventional drain field, so test septic feasibility before committing to a building envelope12. Water: a water-right permit applies only to uses meeting state permitting criteria, but a well driller must be licensed19. Taxes: the effective property-tax rate is about 1.1%, and the median annual property-tax bill is about $2,9972021.
Watch-outs
- Do not apply Agricultural District setbacks to every parcel; Union County uses multiple zoning districts, and the controlling map and later amendments may change the answer410.
- Do not assume an RV or tiny home can be occupied simply because you own the land; Union County Planning and Zoning should confirm the proposed use and utility plan2.
- A qualifying owner may perform certain electrical work without a contractor license, but the exemption still requires an approved homeowner permit and inspections7.
Sources
- Union County SD - Planning & Zoning (2026 county census)
- Union County Planning and Zoning (unioncountysd.gov)
- Union County SD - Revised Zoning Regulations (2026 county census)
- 2008 Revised Zoning Regulations, quoted and re-checked
- One-Stop Permitting and Regulation Guide, quoted and re-checked
- South Dakota DANR On-Site Wastewater Systems (danr.sd.gov)
- South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
- Union County Highway Department (unioncountysd.gov)
- 2008 Revised Zoning Regulations, quoted and re-checked
- 2008 Revised Zoning Regulations, quoted and re-checked
- 2008 Revised Zoning Regulations, quoted and re-checked
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Administrative Rule 74:53:01 — Individual and Small On-Site Wastewater Systems (South Dakota statewide rule), quoted and re-checked
- 2008 Revised Zoning Regulations, quoted and re-checked
- Instructions: Applying for permission for driveway or intersection on a South Dakota state highway (South Dakota statewide rule), quoted and re-checked
- South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
- South Dakota Plumbing Commission - Inspections (South Dakota statewide rule), quoted and re-checked
- National Flood Insurance Program (South Dakota statewide rule), quoted and re-checked
- South Dakota Water Rights — Drilling a Well (South Dakota statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.