Unincorporated Turner County, South Dakota requires a separate building permit for each regulated building, structure or land-use change, and the county Planning and Zoning Department handles rural permitting and zoning12. The county also has zoning on unincorporated land outside approved municipal joint-zoning areas3. South Dakota sets the on-site wastewater standards, but confirm the ordinary residential septic process with Turner County Planning and Zoning before committing to a site plan45.
At a glance
- Building permit
- Required for regulated buildings, structures and land-use changes1
- Zoning
- Applies to unincorporated land outside approved municipal joint-zoning areas3
- Permit office
- Turner County Planning and Zoning2
- Septic
- State installation standards apply; confirm the local residential process45
- RV living
- Long-term occupancy was not confirmed; ask Planning and Zoning2
- Tiny homes
- No specific occupancy rule confirmed; zoning and permits still apply13
- Owner electrical work
- Licensure exemption available for qualifying owner-occupants; permit and inspection remain required6
- Driveway access
- Approval required from the agency governing the public road78
Who to call
Building permits
Turner County Planning and Zoning
Building and zoning permits, building eligibility, changes of zone, conditional uses, plats and variances in rural Turner County
400 S Main, PO Box 309, Parker, SD 57053
Roads & driveways
Turner County Highway Department
Entrance permits and county-road infrastructure
1070 E 6th St, Parker SD 57053
Septic permits
South Dakota DANR On-Site Wastewater Systems
State on-site wastewater installation requirements and information about system-plan review
523 E Capitol Ave, Pierre, SD 57501-3182
Contact details are copied from each office’s official page and were checked against it on September 27, 2026.
Do you need a building permit in Turner County, South Dakota?
Yes. On unincorporated land governed by Turner County zoning, a separate building permit is required for each regulated building, structure or land-use change1. A zoning permit is also required before a change of use or occupancy, and the Office of Planning and Zoning issues the permit after review and payment of the applicable fee1. The published application lists the building-permit fee as $1 per $1,000 of work, with a $10 minimum9. The reviewed county materials refer to applicable county building-code provisions but do not identify the adopted code edition or confirm a routine construction-inspection schedule, so ask Planning and Zoning what plans and inspections apply to your particular project2.
Who is the Turner County building department, and how do you reach it?
Turner County Planning and Zoning is the permit office for rural areas of the county; cities handle their own planning and zoning210. Call 605-297-3024 or visit 400 S Main, PO Box 309, Parker, SD 570532. The office handles building and zoning permits, building eligibility, changes of zone, conditional uses, plats and variances2. For an application, complete the form, include a site plan and pay the fee; the Zoning Director reviews it and may return an approved permit by mail, email or pickup11. Call ahead if you need same-day service or want an in-person zoning visit11.
Does Turner County have zoning?
Yes. Turner County zoning applies to unincorporated land except areas approved for municipal joint zoning jurisdiction, while incorporated cities administer their own planning and zoning310. The official zoning map is filed with the Register of Deeds, and district rules determine where a use can go and what conditions apply12. That makes the parcel's jurisdiction and zoning district the first questions to settle before designing a house, cabin or outbuilding312. We could not confirm a countywide minimum dwelling floor area, a specific tiny-home rule, or a general agricultural exemption from county permits; ask Turner County Planning and Zoning about the exact parcel and proposed use2.
How do septic systems work in Turner County?
South Dakota's on-site wastewater installation requirements apply in Turner County under Administrative Rules Chapter 74:53:01413. Turner County's census identifies local administration through the county planning office, but we could not confirm a general permit or inspection procedure for an ordinary residential septic system; contact Planning and Zoning before hiring an installer or finalizing a site plan52. Only about 1.9% of Turner County soils rate without severe limitations for a conventional drain field, so a buyer should expect careful site evaluation and should budget for the possibility of a nonconventional design14. In the Lake Residential District, a structure must use a central wastewater system or a sealed, leak-proof, corrosion-resistant holding tank, while a septic tank and drain field needs conditional-use approval1516.
Can you live in an RV or tiny home on your land in Turner County?
We could not confirm a Turner County rule that specifically allows or prohibits long-term RV occupancy, temporary camping or tiny-home occupancy on private rural land; ask Planning and Zoning before buying land for any of those uses2. A tiny home is not automatically outside the permit system because Turner County requires permits for regulated buildings, structures and land-use changes1. Manufactured homes have a more specific path: conditional-use consideration requires construction on or after July 15, 1976, at least 22 feet of exterior width excluding overhangs, foundation walls and piers extending at least 42 inches below final grade, and a roof pitch of at least 3 in 1217. A temporary manufactured unit used during construction must be removed within 1 year or when the dwelling is complete, whichever comes first17.
Building a home in Turner County: the steps, in order
- Confirm whether the parcel is under Turner County, city or municipal joint zoning, then ask Planning and Zoning for the district rules and building eligibility32.
- Confirm public-road access with the governing road agency; Turner County requires that approval for building eligibility and development7.
- Submit the completed building-permit application, site plan and fee to Planning and Zoning11.
- Confirm the septic design and any local approval or inspection steps with Planning and Zoning under South Dakota's statewide installation standards54.
- Obtain any required state electrical permit and arrange rough-in and final inspections; the final electrical inspection is required before occupancy1819.
- Obtain the state plumbing inspection certificate and arrange required plumbing inspections unless the project is in a city administering its own requirements20.
What should you check before buying land in Turner County?
Access: the Turner County Highway Department handles entrance permits and can be reached at 605-297-3404 at 1070 E 6th St, Parker SD 570538. A driveway connecting to a state highway instead needs South Dakota Department of Transportation permission before construction begins21. Soils: only about 1.9% of county soils rate without severe limitations for conventional drain fields, so make septic feasibility part of due diligence14. Water: a water-right permit is required only for uses that meet state permitting criteria, but any well driller must be state-licensed22. Flood: development in a regulated floodplain requires a permit in participating South Dakota communities; ask Planning and Zoning who administers the parcel's floodplain review232. Taxes: the effective property-tax rate is about 1%, and the median annual property-tax bill is about $2,0722425.
Watch-outs
- A Parker mailing address does not establish county jurisdiction; cities administer their own planning and zoning, and approved municipal joint-zoning areas are excluded from the county ordinance310.
- Do not assume a small or movable dwelling avoids permitting: Turner County requires permits for regulated structures and land-use changes, while RV and tiny-home occupancy remain questions for Planning and Zoning12.
- Lake Residential District wastewater rules are stricter: central service or an approved sealed holding tank is the baseline, and a septic tank with drain field is only a conditional use1516.
Sources
- 2008 Revised Zoning Ordinance, quoted and re-checked
- Turner County Planning and Zoning (turner.sdcounties.org)
- Turner County South Dakota Planning and Zoning, quoted and re-checked
- South Dakota Feedlot Permit Program - Septic Tank Systems, quoted and re-checked
- South Dakota DANR On-Site Wastewater Systems (2026 county census)
- South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
- 2008 Revised Zoning Ordinance, quoted and re-checked
- Turner County Highway Department (turner.sdcounties.org)
- Turner County Building Permit Application, quoted and re-checked
- Turner County South Dakota Planning and Zoning, quoted and re-checked
- Turner County Building Permit Application, quoted and re-checked
- 2008 Revised Zoning Ordinance, quoted and re-checked
- South Dakota DANR On-Site Wastewater Systems (danr.sd.gov)
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- 2008 Revised Zoning Ordinance, quoted and re-checked
- 2008 Revised Zoning Ordinance, quoted and re-checked
- 2008 Revised Zoning Ordinance, quoted and re-checked
- South Dakota Electrical Commission - Homeowner Wiring (South Dakota statewide rule), quoted and re-checked
- South Dakota Electrical Wiring Rules Bulletin (South Dakota statewide rule), quoted and re-checked
- South Dakota Plumbing Commission - Inspections (South Dakota statewide rule), quoted and re-checked
- Instructions: Applying for permission for driveway or intersection on a South Dakota state highway (South Dakota statewide rule), quoted and re-checked
- South Dakota Water Rights — Drilling a Well (South Dakota statewide rule), quoted and re-checked
- National Flood Insurance Program (South Dakota statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.