Unincorporated McPherson County, South Dakota requires a building/use permit, issued by the county Zoning Officer, for buildings, structures and specified site-preparation work1. County zoning applies to the same unincorporated land, except the mapped area within generally one mile of Eureka, which is under city jurisdiction1. Septic permits and installation rules come from the state, through South Dakota DANR, not the county2,3.
Do you need a building permit in McPherson County, South Dakota?
Yes.
Yes. Unincorporated McPherson County requires a building/use permit before a building or structure is erected, moved, enlarged, structurally altered or used1. The requirement also reaches accessory buildings and excavation, filling, grading, lagooning or dredging done to prepare a future construction site1. Field crops and grasslands are exempt from the building permit in the Agricultural Land District, but that narrow exemption does not cover every farm building or agricultural activity1. Apply to the county Zoning Officer with a scaled site plan showing existing and proposed buildings, intended uses and utilities1. A nonconforming proposal may also need administrative review, a conditional use or a variance1. McPherson County expressly requires cannabis establishments to conform to the International Building Code, but we could not confirm a generally adopted county building code for an ordinary home; ask Planning & Zoning which construction standards apply1.
Who issues building permits in McPherson County, and how do you reach the office?
McPherson County Planning & Zoning accepts building permit applications and makes printed building, drainage, variance and conditional-use forms available in its office.
McPherson County Planning & Zoning accepts building permit applications and makes printed building, drainage, variance and conditional-use forms available in its office6. Planning & Zoning is a function of the Equalization Office in the McPherson County Courthouse6. Reach the office at 605-439-3663 or mail P.O. Box 50, Leola, SD 574566. The published building-permit fee is $25 for projects costing from $0 through $999,999; projects costing $1,000,000 or more are charged $100 per million, and fees are reviewed each January7. The Zoning Officer grants or denies a complete building/use permit application within a reasonable time1. We could not confirm a routine county inspection schedule or separate certificate-of-occupancy process, so ask the office what inspections and closeout documents your project needs.
Does McPherson County have zoning, and what does it allow?
McPherson County zoning applies in unincorporated areas, but the mapped area within generally one mile of Eureka is under City of Eureka jurisdiction.
McPherson County zoning applies in unincorporated areas, but the mapped area within generally one mile of Eureka is under City of Eureka jurisdiction1. The county districts are Agricultural, Commercial/Industrial, Lake Park and Town, and the Official Zoning Map controls where they apply1. In the Agricultural Land District, eligible building lots for permitted uses generally need at least 2 acres, subject to the ordinance's stated exception1. Agricultural District buildings generally need a 150-foot front setback and 25-foot side and rear setbacks; corner lots have front yards on both streets, and the Board sets conditional-use setbacks1. Principal buildings there generally may not exceed 35 feet, although the ordinance lists exceptions1. Town District residential minimums depend on utilities: 20,000 square feet with public water and septic, 43,560 with a well and septic, or 9,600 with public water and sewer1. A manufactured home must have more than 700 square feet of occupied space and be at least 14 feet wide1. A modular home must have more than 1,000 square feet in a ranch style or 850 square feet in a split style, and sit on a permanent foundation1. We could not confirm a minimum floor area for site-built homes or a countywide lot-coverage limit.
How do septic permits work in McPherson County?
South Dakota DANR administers the statewide minimum requirements for individual and small on-site wastewater systems, while local governments may impose stricter requirements.
South Dakota DANR administers the statewide minimum requirements for individual and small on-site wastewater systems, while local governments may impose stricter requirements3. McPherson County identifies DANR rather than a county septic authority for on-site wastewater systems, so county Planning & Zoning issues the building/use permit while the state sets the septic rules2. For any plat in the Lake Park District, the developer must provide for a DANR-approved sewage system before plat approval, and individual on-site systems must meet the state rules1. Contact the DANR On-Site Wastewater Systems Program at (605) 773-4647 about installation plans and the review required for a proposed system2. We could not confirm whether every conventional residential system follows a general permit or inspection process, so settle that question with DANR and county Planning & Zoning before installation. About 59.6% of county soils are rated without severe limitations for a conventional septic drain field; that countywide figure cannot replace a parcel-level soil and site evaluation8. South Dakota also requires installers of individual and small wastewater systems to be certified2.
Can you live in an RV or tiny home on land in McPherson County?
We could not confirm a McPherson County rule that directly allows or prohibits long-term RV occupancy, temporary camping or tiny-home occupancy.
We could not confirm a McPherson County rule that directly allows or prohibits long-term RV occupancy, temporary camping or tiny-home occupancy. Because unincorporated land is zoned, ask McPherson County Planning & Zoning whether the parcel's district permits the proposed dwelling and whether a building/use permit, conditional use or variance is required1. For land in the mapped area under Eureka's jurisdiction, direct the same zoning questions to the City of Eureka; septic rules there are still the state's1,3. A structure sold as a tiny home may face a specific dimensional rule if it is classified as a manufactured home: manufactured homes must contain more than 700 square feet of occupied space and be at least 14 feet wide1. In a county-regulated private campground, no manufactured home is allowed except one used as the campground office1. An off-grid sanitation plan is separate: when water or electricity is unavailable, state rules allow specified unconventional systems, with advance approval required for specified experimental systems9.
How do you build a home in McPherson County, step by step?
Ask McPherson County Planning & Zoning to confirm the parcel's jurisdiction, zoning district and allowed use; the mapped area near Eureka is handled by the city.
- Ask McPherson County Planning & Zoning to confirm the parcel's jurisdiction, zoning district and allowed use; the mapped area near Eureka is handled by the city1.
- Check the district's lot, setback and height standards before designing the home1.
- If land must be divided, discuss the subdivision with the Board of County Commissioners before proceeding with the plat1.
- Prepare the scaled site plan and building, use and utility information required with the county building/use permit application1.
- Resolve any conditional use or variance before construction1.
- Contact DANR about septic design, installation-plan review and installer requirements; a Lake Park plat must provide for a DANR-approved sewage system before approval1,2,3.
- Determine whether the well use needs a water-right permit; when one applies, approval must come before drilling10.
What should you check before buying land in McPherson County?
Start with jurisdiction and zoning: the county's Official Zoning Map controls unincorporated zoning status, while the mapped area near Eureka is under city jurisdiction.
Start with jurisdiction and zoning: the county's Official Zoning Map controls unincorporated zoning status, while the mapped area near Eureka is under city jurisdiction1. Check access before closing. We could not confirm the county's own driveway rule, but a new or modified connection to a South Dakota state highway needs state permission before construction starts12. Water needs advance planning: domestic use generally avoids a water-right permit unless it exceeds 25,920 gallons per day or a peak rate of 25 gallons per minute5. The county averages about 21 inches of precipitation annually and has experienced severe drought in about 10.3% of years8. Typical farmland value is about $2,389 per acre, while the effective property-tax rate is about 1.6% and the median annual property-tax bill is about $1,2188.
Watch-outs
- The mapped area within generally one mile of Eureka is under city rather than McPherson County zoning jurisdiction1.
- We could not confirm county rules for RV living, temporary camping or tiny-home occupancy; the only dwelling-size rules we found cover manufactured homes (more than 700 square feet) and modular homes (more than 1,000 square feet ranch or 850 split), so ask Planning & Zoning about the specific parcel and use1,6.
- A qualifying owner-builder electrical exemption is only from licensure; an approved homeowner permit and inspections are still required4.
- We could not confirm McPherson County's access-approach requirements even though the county ordinance index identifies an Access Approach Ordinance; ask Planning & Zoning before creating or changing a county-road entrance6.
Sources
12 official pages, each quoted and re-checked · written October 9, 2026
- McPherson County Zoning Ordinance #2024-1 (2026 county census)
- On-Site Wastewater Systems in South Dakota
- On-Site Wastewater Systems in South Dakota (South Dakota statewide rule)
- South Dakota Electrical Commission - Homeowner Wiring (2026 county census)
- Using Water in South Dakota
- McPherson County Planning & Zoning (mcpherson.sdcounty.gov)
- Resolution Number 26-3: Establishing Planning and Zoning Permit Application Fees
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Administrative Rule 74:53:01 — Individual and Small On-Site Wastewater Systems (South Dakota statewide rule)
- South Dakota Water Rights - Drilling a Well
- South Dakota Plumbing Commission - Inspections (South Dakota statewide rule)
- Instructions: Applying for permission for driveway or intersection on a South Dakota state highway (South Dakota statewide rule)
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in McPherson County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.