Refugio County, Texas publishes a $20 Development Permit Application for residential, non-residential, mobile-home, new-construction, fill and drainage proposals, but the source does not establish that ordinary work outside a floodplain always requires it1. Unincorporated land has no county zoning, while the towns of Bayside and Woodsboro run their own2,3,4. Septic permits for unincorporated land are handled through the County Judge's office5.
Do you need a building permit in Refugio County, Texas?
Refugio County publishes a Development Permit Application under its "Building Permits" heading and charges a $20 fee.
Refugio County publishes a Development Permit Application under its "Building Permits" heading and charges a $20 fee1. The form covers residential, non-residential, mobile-home, new-construction, substantial-improvement, fill and drainage proposals, but the published material does not expressly say that an ordinary project outside the floodplain must obtain the permit1. Ask the County Judge's office whether your specific parcel and work require the application before construction8. If the property is in a floodplain, submit plans and specifications with the application6. Refugio County's adoption of a countywide building code could not be confirmed, so do not treat the development permit as proof that the county performs full code-plan review. Separately, windstorm insurance through the Texas Windstorm Insurance Association requires certified construction, and applications for a windstorm Certificate of Compliance must be certified to the 2024 International Residential Code or International Building Code9. An industrialized or modular home has a separate state process: an owner purchasing one for personal use may file for an installation permit instead of registering as an industrialized builder7.
Who handles building and development permits in Refugio County, and how do you reach them?
Start with the Refugio County Judge's office at 808 Commerce Street, Room 104, Refugio, TX 78377, phone 361-526-4434.
Start with the Refugio County Judge's office at 808 Commerce Street, Room 104, Refugio, TX 78377, phone 361-526-44348. Ask that office whether the $20 Development Permit Application applies to your parcel and proposed work, because the published form does not make its reach outside floodplains explicit1. The same office processes septic applications: the county packet directs applicants to return all checklist items to the County Judge's office5. Refugio County's Regulations and Permits page links the Development Permit Application and the OSSF application1. For land inside the Town of Bayside, municipal zoning is separate from the county process, so confirm land-use approval with the town as well3.
Does Refugio County have zoning?
Unincorporated Refugio County has no county zoning rule setting minimum home size, minimum lot size, setbacks, lot coverage or building height.
Unincorporated Refugio County has no county zoning rule setting minimum home size, minimum lot size, setbacks, lot coverage or building height2. That unincorporated-county answer does not carry into incorporated towns. The Town of Bayside has zoning that governs buildings, structures, land uses, districts, yards, open spaces and related development within the town3. The Town of Woodsboro also requires development to comply with its Land Development Code and Comprehensive Plan4. Other municipal rules were not confirmed, so ask the relevant city or town before relying on the county answer for an incorporated parcel. Zoning is also separate from the county's development, septic and floodplain processes: a project can face those requirements even when county zoning does not restrict the use1,5,6.
How do septic (OSSF) permits work in Refugio County?
For unincorporated land, Refugio County runs the OSSF application process, and the county packet does not show it applies inside incorporated towns, so a parcel in Bayside or Woodsboro needs the local permitting authority confirmed.
For unincorporated land, Refugio County runs the OSSF application process, and the county packet does not show it applies inside incorporated towns, so a parcel in Bayside or Woodsboro needs the local permitting authority confirmed5. Applications, site/soil evaluations, planning materials and the permit fee all go through the County Judge's office, with a $300 fee for a residential system and $500 for commercial5. Soils make this more than paperwork: USDA survey data shows only 1.7% of Refugio County's soils are rated without severe limitations for a conventional septic drain field, so plan on an engineered or alternative system on nearly every site10. A single-family home on a tract of at least 10 acres can skip the planning-materials, permit and inspection requirements under the state's 10-acre rule, but only if every part of the system stays at least 100 feet from the property line and the other Chapter 285 conditions are met11,12. Boreholes, cesspools and seepage pits are prohibited outright, regardless of tract size11.
Can you live in an RV or tiny home on your land in Refugio County?
Yes, on unincorporated land in Refugio County the county sets no zoning rule against living in an RV, a tiny home or a manufactured home.
Yes, on unincorporated land in Refugio County the county sets no zoning rule against living in an RV, a tiny home or a manufactured home2. Inside the Town of Bayside, municipal zoning applies, so ask the town before buying or placing a dwelling there3. A separate state program applies when installing a factory-built industrialized or modular home: an owner buying one for personal use may file a residential installation-permit application instead of registering as an industrialized builder, and the first installation needs a site inspection scheduled at least 48 hours ahead and completed within 180 days after construction starts7,13. An RV or tiny home using an OSSF generally needs county septic approval; the narrow state exception for a qualifying single-family dwelling on at least 10 acres applies only when every listed condition is met5,12.
Building on land in Refugio County: the steps, in order
Confirm whether the parcel is unincorporated or inside a municipality; the Town of Bayside has its own zoning.
- Confirm whether the parcel is unincorporated or inside a municipality; the Town of Bayside has its own zoning3.
- Ask the County Judge's office whether the $20 Development Permit Application applies to the site and work1,8.
- If the property is in a floodplain, include plans and specifications with the application6.
- Apply for a septic permit through the same office and obtain the required site and soil evaluation5,12.
- For an industrialized or modular home, file the applicable state installation-permit application and arrange the required inspection7,13.
- If a driveway will connect to a state highway, submit Form 1058 to the TxDOT district office before work begins in the right of way14.
What to check before you buy land in Refugio County
Soils: with only 1.7% of the county's soils free of severe limitations for a conventional septic field, budget for an engineered or alternative system on nearly every site.
Soils: with only 1.7% of the county's soils free of severe limitations for a conventional septic field, budget for an engineered or alternative system on nearly every site10. Flood risk: check flood-hazard status before you buy, since property in an identified flood hazard area triggers the county's floodplain development permit and a copy of construction plans6. Water: no drilling permit is required to drill a water well in Refugio County, but you must give the Refugio Groundwater Conservation District written notice of intent before drilling, and the district advises checking groundwater production-permit rules15. Terrain: all of Refugio County's land, 100% of it, sits at 15% slope or less, and 19.4% is wooded10. Climate: the county averages 35.7 inches of rain a year and sees severe drought in 17.4% of years, with a projected 18.9 days a year at or above 100°F by mid-century10. Costs: typical home insurance runs about $2,492 a year, the effective property tax rate is about 1.4%, and the median tax bill is about $1,325 a year, against a typical home value near $135,704 and rural land around $2,528 an acre10. If the land is currently farmed or ranched, it may already qualify for agricultural appraisal, which requires the land to have been devoted principally to agricultural or timber use for at least five of the past seven years16.
Watch-outs
- Refugio County publishes a $20 Development Permit Application, but the source does not establish that ordinary work outside a floodplain always requires it; ask the County Judge's office before starting1,8.
- The no-county-zoning answer is limited to unincorporated Refugio County; the Town of Bayside has municipal zoning2,3.
- The state industrialized-housing installation permit and its inspection rules apply only to factory-built industrialized or modular homes, not to a site-built house, an RV or a tiny home on wheels7.
- Only 1.7% of Refugio County's soils carry no severe limitation for a conventional septic drain field, so get a site evaluation before you assume a standard system will work10.
Sources
16 official pages, each quoted and re-checked · written October 10, 2026
- Refugio County Texas — Regulations
- Texas law on county zoning and building authority
- Bayside Zoning Ordinance
- Community Development | Town of Woodsboro, Texas
- Refugio County OSSF Application Packet
- Refugio County Development Permit Application
- Industrialized Housing and Buildings Frequently Asked Questions
- Refugio County Judge (co.refugio.tx.us)
- Adopted Building Codes
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Refugio County OSSF Application Packet
- Getting a Permit for an OSSF - Such as a Septic System (Texas statewide rule)
- Building Site Inspection Program
- Section 4: Driveway Permits, Design, and Materials (Texas statewide rule)
- Water Well Drilling and Plugging
- Agricultural, Timberland and Wildlife Management Use Special Appraisal
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Refugio County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.