Zoning, building permits and septic rules in Town of Bayside, Texas
Town of Bayside is a town in Refugio County, Texas. Town of Bayside adopts its own zoning, so inside its limits Town of Bayside’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 11, 2026. Rules for unincorporated land are on the Refugio County page.
Answers from the rulebook for Town of Bayside
Town of Bayside’s own rules
Building permitRequired
Construction inside Bayside town
No permit for wallpapering, painting, replacing faucets or light fixtures or similar work
All buildings and manufactured homes must have permits prior to bringing them into the town
Separate building, electrical, plumbing and mechanical permits; homeowner permit if owner does the work
Permits expire six months after issue unless construction has started and continued
“permits are required for new construction, structural additions or changes.”
Owner-builder exemptionConditional
Homeowners building or repairing their own residence inside Bayside town
Exemption is from contractor licensing only, not from permits
Work must be to code and pass inspection
Homeowner permit required if work is done by the homeowner
Any subcontractors other than the owner must be licensed
“a home owner who constructs or repairs his own residence or other property owned and operated by the owner is exempt from the licensing provision of this ordinance but it must be to code and pass inspection”
Building code adoptedAdopted
One- and two-family dwellings and townhouses inside Bayside town
Adopts the 2000 edition of the International Residential Code with appendix chapters A, B, C, E, G, H, I and J
An Ordinance 63-B amendment exists and was not reviewed
Commercial code is separate (Ordinance 68), not reviewed
code edition: 2000 International Residential Code
“an ordinance of town of bayside adopting the 2000 edition of the international residential code”
InspectionsRequired
Permitted construction inside Bayside town
Not required for storage buildings under 120 sq ft, porches, decks, re-roofing
Inspections made within 3 working days of request
Building that fails inspection when brought into town is declared substandard
“each major phase of construction must be inspected by the inspector to make certain the work conforms to the code, the permit, and the approved plans.”
Certificate of occupancyRequired
Buildings and land inside Bayside town
Issued or refused in writing within five days of notice that building is ready
Rental certificate of occupancy required before occupying rental property
No permanent water, electric or garbage service before a certificate of occupancy; temporary service up to 90 days
“no land or building shall be occupied or used and no building hereafter erected, altered, or extended shall be used or changed in use until a certificate of occupancy shall have been issued by the city”
Local zoningPresent
Land inside Bayside town limits
Town has a planning, zoning and sub-standard commission and an Ordinance 38 zoning PDF; that PDF exceeded the size limit and was not read, so the zoning text itself was not reviewed.
“other phases may obtain building permits beyond the 18-month life span as long as each phase continues to conform to all zoning requirements in effect at the time of application for a building permit for each phase.”
Manufactured homesLimited
Manufactured homes brought into Bayside town
Permit required before the home is brought into town
Inspection required; a home that fails inspection is declared substandard
Zoning district placement rules (Ordinance 38, Ordinance 72-D) not reviewed
“all buildings and manufactured homes must have permits prior to bringing them into the town.”
Shed and accessory-building permit exemptionConditional
Small accessory structures inside Bayside town
Exemption is from inspection only; permits are listed as required for storage buildings, garages, carports, decks and porches
Inspections remain required for storage buildings over 120 sq ft, garages and carports
storage building inspection threshold: < 120 square feet (porches, decks and re-roofing also exempt from inspection)
“inspections are not required for storage buildings less than 120 square feet, porches, decks, and re-roofing.”
Driveway accessRequired
Driveways and culverts inside Bayside town
Permit required for concrete driveways and culverts under Ordinance 63
Separate driveway and culvert ordinance #25 and a driveway culvert application exist but were not read
Fee amounts are in a linked PDF (revised building permit fees) that was not opened
Ordinance 63 says fees are set by the city council and may be adjusted annually
No permit fee for rebuilding an existing structure with unchanged square footage, but inspections and fees are required
“the permit fee document is also attached for your convenience.”
Permit processPublished
Building permits inside Bayside town
Application needs site plan, floor plan and construction details
Forms may be emailed, mailed or delivered in person to the city office
City office open 8:00 am to 12:00 pm Monday to Friday
“to obtain a permit for both residential and commercial uses, simply download the forms below (if available) or give us a call”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Town of Bayside or Refugio County directly.
Zoning districts — Inside Bayside town
Minimum dwelling size — Inside Bayside town
Minimum lot size — Inside Bayside town
Setbacks — Inside Bayside town
Lot coverage — Inside Bayside town
15 more unanswered
Building height
Living in an RV
Camping on your land
Tiny homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Subdividing land
Building in a floodplain
Short-term rentals
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Bayside publishes no rule on the point, not that none exists. Refugio County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Bayside means bringing your own water and power. The kit we’d start with: