Unincorporated Eastland County, Texas has no county building-permit department: the county's own office listing shows none, consistent with the general rule that Texas counties lack authority to require prior approval for ordinary residential construction1. Eastland County also has no countywide zoning ordinance2. For septic, Eastland County Water Supply District is an authorized local OSSF agent within its jurisdiction; TCEQ Region 3 is the fallback elsewhere3,4. Land inside the City of Eastland or its extraterritorial jurisdiction plays by different rules, described below.

Do you need a building permit in Eastland County, Texas?

Not for ordinary construction in unincorporated Eastland County: the county's own site lists no building, code-enforcement or permit office, and Texas counties generally have no authority to require prior approval for a house, barn or shed outside a city.

Not for ordinary construction in unincorporated Eastland County: the county's own site lists no building, code-enforcement or permit office, and Texas counties generally have no authority to require prior approval for a house, barn or shed outside a city1. That finding comes from the county's office listing rather than an explicit county statement, so it's worth a confirming call before you break ground. Inside the City of Eastland, the answer flips: the city has adopted the 2018 International Building Code and 2018 International Residential Code as its reference codes and runs its own permit process7. If your land is within the city's extraterritorial jurisdiction, roughly a half-mile band around the city limits, the city's subdivision ordinance applies there and requires a plat before you can divide the land, reviewed for minimum lot size and width, street access, utilities, drainage and flood protection; the city's own page does not say its zoning ordinance reaches the ETJ, so ask the city before assuming either way8.

How do septic permits work in Eastland County?

Eastland County Water Supply District is a TCEQ-authorized OSSF agent, but the published record does not establish that its jurisdiction covers every parcel in Eastland County.

Eastland County Water Supply District is a TCEQ-authorized OSSF agent, but the published record does not establish that its jurisdiction covers every parcel in Eastland County3. TCEQ Region 3 in Abilene is the permitting authority wherever no local jurisdiction is authorized, so confirm the parcel's authority before applying4,9. A permit and approved plan are generally required before constructing, installing, altering, extending, repairing or operating a septic system; qualifying single-family tracts of at least 10 acres and certain emergency repairs have narrow exceptions4. Where TCEQ issues the permit, the application fee is $200 for a single-family OSSF or $400 for another type, plus a $10 commission fee; a local authorized agent sets its own permit and inspection fees10. Submit the application and planning materials to the applicable authority, which must approve or deny them within 30 days and explain a denial in writing4. Only about 2.3% of Eastland County soils avoid severe limits for a conventional drain field, so arrange a site evaluation before committing to a system11. A site in a 100-year floodplain also carries added planning and design requirements10.

Does Eastland County have zoning?

Eastland County has no countywide zoning ordinance.

Eastland County has no countywide zoning ordinance2. Because Texas law gives counties zoning power only in narrow, specifically named circumstances that Eastland County doesn't meet, unincorporated Eastland County sets no minimum dwelling size, no setback, no lot-coverage limit and no building-height limit, and does not restrict accessory dwellings, RVs, tiny homes, manufactured homes or temporary camping5. Lack of zoning does not eliminate platting: outside municipal limits, dividing land into two or more parts generally requires an approved, recorded plat when the division lays out a subdivision, lots or areas intended for public use12. Qualifying agricultural, farm, ranch, wildlife-management or timber-production land may be excepted if no part is laid out for the specified public uses, but platting applies if the qualifying use ends13. The City of Eastland runs zoning inside city limits, while its subdivision review extends about a half-mile into its extraterritorial jurisdiction8.

Can you live in an RV or tiny home on your land in Eastland County?

Unincorporated Eastland County has no zoning ordinance, so it places no restriction on occupying an RV, tiny home or manufactured home on your own land, and sets no minimum home size.

Unincorporated Eastland County has no zoning ordinance, so it places no restriction on occupying an RV, tiny home or manufactured home on your own land, and sets no minimum home size5. Wastewater rules still apply: an off-grid OSSF generally needs a permit and approved plan, may handle only domestic sewage, and can be subject to stricter local requirements14. Eastland County Water Supply District administers OSSF permits within its authorized jurisdiction, while TCEQ Region 3 handles locations without an authorized local jurisdiction3,4. Confirm which authority covers the parcel before moving in, and arrange the site evaluation early because only about 2.3% of county soils avoid severe limits for a conventional drain field11. Texas does not require an owner to hold a state electrician or plumber license for work on the owner's own homestead, though that is a licensing rule and not a county permit15.

Building a home in Eastland County: the steps, in order

Confirm whether the parcel is inside the City of Eastland or its extraterritorial jurisdiction; the city reviews plats in both areas.

  1. Confirm whether the parcel is inside the City of Eastland or its extraterritorial jurisdiction; the city reviews plats in both areas8.
  1. If you are dividing unincorporated land, ask the Eastland County Clerk whether the division needs commissioners court approval and a recorded plat; qualifying agricultural divisions have a conditional exception, not a blanket exemption from other rules12,13.
  1. Get a septic site evaluation early, given how little of the county's soil avoids severe drain-field limits, and identify whether the site falls in a 100-year floodplain with added design requirements10,11.
  1. Ask Eastland County Water Supply District whether the parcel lies within its authorized OSSF jurisdiction; if it does not, contact TCEQ Region 3 in Abilene3,4,9. Submit the application and planning materials to the confirmed authority before septic work begins4.
  1. If the new driveway connects to a state highway, submit TxDOT Form 1058 before construction on the right of way6.
  1. Inside the City of Eastland, apply for the city's building permit under its adopted 2018 IBC/IRC codes7.

What to check before you buy land in Eastland County

Soils are the single biggest thing to verify before you buy: only about 2.3% of Eastland County's soils are free of severe limits for a conventional septic drain field, so get a site evaluation on the specific parcel rather than assuming standard septic will work.

Soils are the single biggest thing to verify before you buy: only about 2.3% of Eastland County's soils are free of severe limits for a conventional septic drain field, so get a site evaluation on the specific parcel rather than assuming standard septic will work11. About a fifth of the county, 21.6%, is wooded, while 94.5% of the land sits at 15% slope or less11. The county gets 31.1 inches of precipitation a year and sees severe drought in about 26.7% of years11. The nearest city of 100,000 or more is about 55 miles from the county center11. Texas lets a groundwater conservation district permit water wells in its boundaries, and a district must exempt a domestic or livestock well on a tract larger than 10 acres that cannot produce more than 25,000 gallons a day; one state water-board table lists the county's Trinity (Antlers) area as having no district, so ask the Eastland County Judge's office or the district which rules cover your parcel before drilling16. Property taxes run an effective 1.2% with a median bill around $1,451 a year, and typical home insurance runs about $2,320 a year11.

Watch-outs

  • The 'no building permit' finding for unincorporated Eastland County comes from the county's own office listing showing no building department, not from an explicit county statement that no permit is required; call the County Judge's office to confirm before you build1.
  • If your land sits within about a half-mile of the Eastland city limits, you may be inside the city's extraterritorial jurisdiction and subject to its subdivision plat review even though county zoning and building permits don't apply there8.
  • Eastland County Water Supply District is an authorized OSSF agent, but its published jurisdiction does not establish coverage of every county parcel; ask the district whether it covers your land, with TCEQ Region 3 as the fallback elsewhere3,4.
  • Whether a groundwater conservation district covers your parcel, and so whether a well permit applies, is unconfirmed; ask before drilling16.

Sources

16 official pages, each quoted and re-checked · written October 10, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Eastland County has no countywide zoning.

RuleEastland CountyComanche CountyBrown CountyCallahan CountyErath CountyStephens CountyPalo Pinto County
Building permitNot requiredNot requiredNot requiredLimitedNot requiredNot requiredNot required
County zoningNoNoNoNoNoNoNo
Septic permitsTCEQComanche CountyCounty OSSF programCallahan CountyCounty Env. Health Dept.TCEQCounty Public Works Dept.

County locator

Eastland County in Texas

68
County map
Eastland County highlighted among the Texas counties · colored by Index score

How Eastland County scores

68 / 100 · #52 of 254 in Texas · six factors, land price, tax, rain and climate

Seclusion64100% ev.
Self-Sufficiency4396% ev.
Admin Boringness8290% ev.
Durability43100% ev.
Property Autonomy71100% ev.
Carry Cost80100% ev.

Evidence strength: 97%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$152kTypical home
1.2%Property tax
$3,026Land / acre
31.1"Annual rain
26.7% of yrsSevere drought
43.5 / yr (+27.5)Mid-century 100°F days
28.4 daysMid-century dry spell
1.85" (+4.1%)Mid-century 1-day rain
1.36×Wildfire change factor
100%Forward climate coverage
$2,320Home insurance / yr
-0.3% / yrInsurance growth
0%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
11,789People within 30 min
3,639,200People within 2 hr
10,409Radius comparison (15 mi)
19.5People / sq mi
0%Federal land
94.5%Land at 15% slope or less
2.3%Soils rated "not limited" for septic (strict USDA rating)
13,841 acWorkable land screen
21.6%Wooded land
10.6 tonsBiomass / forest ac
64.5°FAvg temp

Scout Eastland County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Eastland County. Listing sites control their own results and filters.

Sell land in Eastland County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Eastland County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet covered: Town of Carbon · Gorman · Town of Rising Star

Answers from the rulebook for Eastland County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Eastland County rules

  • Zoning districts · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Minimum dwelling size · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Setbacks · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Lot coverage · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Building height · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Living in an RV · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Camping on your land · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Tiny homes · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Manufactured homes · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Accessory dwellings · by state lawNo county rule

    Unincorporated Eastland County: no county rule sets this, because Eastland County has adopted no county zoning ordinance (Texas law lets some counties zone, but this one has not). The county legal census found no county zoning ordinance, citing eastlandcountytexas.com.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
  • Who permits septicLocal (with conditions)

    OSSF permitting and administration within the area of jurisdiction delegated by TCEQ to Eastland County WSD; the geographic boundary of that delegated area was not located in the official sources opened.

    • TCEQ's official authorized-agent guidance states that an authorized agent administers the OSSF program within its area of jurisdiction.
    • The TCEQ 2024 official OSSF report lists EASTLAND COUNTY WSD under the AUTHORIZED AGENT table with identifier 620256.
    • This evidence does not establish that the delegated area covers all of Eastland County or identify the specific portion covered.
    • Where a local jurisdiction has not been authorized, TCEQ states that the TCEQ regional office is the permitting authority.
    • TCEQ states that OSSF permits and approved plans are generally required, subject to the stated statutory and regulatory exceptions, including qualifying 10-acre-rule systems and emergency repairs reported within 72 hours.
    “EASTLAND COUNTY WSD (EASTLAND) 620256 8 0 0 0 0 0 1 0 0 0 0 0 7”
  • County-wide zoningAbsent

    Texas counties may not adopt comprehensive zoning in unincorporated areas; Eastland County has only limited statutory exceptions (e.g., an Airport Zoning Ordinance), not general county zoning.

    Eastland County, Texas — official county website ↗From the county’s own site, awaiting a second reviewer

Texas rules that apply here

  • Building permitLimited

    Industrialized housing or buildings installed in Texas, including purchasers or lessees acquiring a unit for their own or their company’s use.

    • A person purchasing or leasing an industrialized house or building for their own use or their company’s use may file for an installation permit instead of registering as an industrialized builder.
    • A person responsible for assembly, connection, and on-site construction for persons other than themselves must be registered as an industrialized builder.
    • Municipalities may require applicable local permits and licenses before construction begins when the municipality regulates the installation.
    “A person who is a retailer of industrialized housing or buildings, or who is responsible for the assembly, connection, and on-site construction and erection of an industrialized house or building for persons other than themselves, must be registered as an industrialized builder. Subcontractors do not require the registration unless required by other applicable state laws. For example, electricians, HVAC contractors, and plumbers must be licensed in accordance with the applicable state law. If you are purchasing or leasing an industrialized house or building for your own use, or your company's use, you may file for an installation permit in lieu of registering as an industrialized builder.”
  • Owner-builder exemptionConditional

    An owner performing electrical, plumbing, or air-conditioning and refrigeration work on the owner's own residence or homestead in Texas.

    • Electrical work is exempt from state electrician licensing when performed on a dwelling the person owns and resides in.
    • Plumbing is exempt from state plumbing licensing when performed by the property owner in the property owner's homestead.
    • Air-conditioning and refrigeration contracting is exempt from the applicable state registration requirements when performed in a building owned solely by the person as the person's home.
    • These exemptions do not establish a blanket exemption for every construction trade or contractor-regulated activity.
    “A person who perform electrical work on a dwelling that they own and reside in is not required by the state to be licensed as electricians.”
    One more reviewed finding on this topic
    • Conditional — Electrical work on a dwelling owned and occupied by the property owner in Texas.
      “A person who perform electrical work on a dwelling that they own and reside in is not required by the state to be licensed”
  • Building code adoptedPartial

    Industrialized housing and buildings, modules, and modular components governed by the Texas Industrialized Housing and Buildings program.

    • The mandatory state code adoption applies to industrialized housing and buildings, modules, and modular components, not all construction statewide.
    • The effective date is July 1, 2024.
    • The International Existing Building Code applies to alterations of portable industrialized buildings.
    • Manufacturers already certified for Texas must have design-package documents reviewed and approved to the new editions with an approval date on or after July 1, 2024, unless the manufacturer elected to transition before the effective date under Department rule 70.70(a)(5)(B).
    • Construction begun on or after July 1, 2024 must comply with the new code editions and approved design packages.
    • Construction begun before July 1, 2024, or before a manufacturer's effective transition date, must meet the stated completion, inspection, and labeling deadline to remain eligible for a Texas decal.

    effective date: 2024-07-01 · International Building Code: 2021 Edition (including appendices C, F, and K) · International Residential Code: 2021 Edition (including appendices AG, AH, AK, AP, AQ, and AT) · International Fuel Gas Code: 2021 Edition · International Mechanical Code: 2021 Edition · International Plumbing Code: 2021 Edition · International Energy Conservation Code: 2015 Edition · National Electrical Code: 2020 Edition · International Existing Building Code: 2021 Edition (for alterations of portable industrialized buildings)

    “July 1, 2024, all industrialized housing and buildings, modules, and modular components shall comply with the following codes, as amended in §70.101 of the IHB Rules:”
    One more reviewed finding on this topic
    • Partial — Industrialized housing and buildings, modules, and modular components built for Texas under the Industrialized Housing and Buildings program.
      “Effective July 1, 2024, all industrialized housing and buildings, modules, and modular components shall comply with the following codes, as amended in §70.101 of the IHB Rules:”
  • InspectionsLimited

    Construction and first installation of industrialized housing and permanent industrialized buildings in Texas; on-site inspections outside a municipality or in a jurisdiction without a building-inspection department are addressed by the Texas Industrialized Housing and Buildings program.

    • Texas Occupations Code Chapter 1202 requires the department to inspect industrialized housing and buildings for compliance with mandatory building codes or approved designs, plans, and specifications; approved third-party inspectors may be designated under commission rules.
    • For first installation, site inspections are required for all industrialized housing and permanent industrialized buildings, except unoccupied industrialized buildings not open to the public, such as communication-equipment shelters, when they are not also classified as a hazardous occupancy by the mandatory building code.
    • For industrialized construction located in a municipality, the statute assigns on-site inspection to the municipal building official; outside a municipality, an approved third-party inspector performs on-site inspections of industrialized housing.
    “Site inspections are required for the first installation of all industrialized housing and permanent industrialized buildings.”
  • Certificate of occupancyLimited

    Industrialized housing and buildings subject to the Texas Industrialized Housing and Buildings rules, where a local building official administers certificate-of-occupancy rules.

    • The certificate of occupancy is issued by the local building official in accordance with locally adopted rules and regulations.
    • A building or structure may not be used or occupied, and its occupancy classification may not be changed, until the local building official issues a certificate of occupancy under those locally adopted rules.
    • The state rule provision does not itself create a uniform certificate-of-occupancy process for all Texas construction; local adoption and administration control for this industrialized-housing/buildings provision.
    “The local building official shall issue a certificate of occupancy in accordance with the locally adopted rules and regulations.”
  • Septic permitRequired

    Construction, installation, alteration, extension, repair, and operation of OSSFs in Texas, subject to stated exemptions and local requirements.

    • A permit and approved plan are required for construction, alteration, repair, extension, and operation of an OSSF.
    • A permit is generally required to construct, install, alter, extend, or repair an OSSF.
    • A local permitting authority must be checked because local programs may be more stringent than state minimums.
    • The 10-acre exemption requires compliance with 30 TAC Chapter 285 planning, construction, and installation standards; a site evaluation by a TCEQ-licensed site evaluator or professional engineer; service to a single-family dwelling on a tract of at least 10 acres; no nuisance or groundwater pollution; all OSSF parts at least 100 feet from the property line; on-site effluent disposal; and the single-family dwelling must be the only dwelling on the tract.
    • Emergency repairs listed by TCEQ do not require a permit but must be reported to the permitting authority in writing within 72 hours after repairs begin.
    • Grandfathered systems may be exempt if installed before the local program was authorized or before September 1, 1989, whichever is earlier, and if they are not creating a nuisance, are not in need of repair, and have had no significant increase in use or other alteration.
    • The permitting authority must approve or deny planning materials and the permit application within 30 days of receipt.

    minimum tract size for 10-acre exemption: >= 10 acres (single-family dwelling and all other stated conditions must be met) · minimum OSSF setback under 10-acre exemption: >= 100 feet from property line (all parts of the OSSF) · emergency repair reporting deadline: <= 72 hours (after repairs have begun) · permit application decision deadline: <= 30 days (from receipt by permitting authority)

    “A permit and approved plan are required to construct, alter, repair, extend, and operate an OSSF.”
    3 more reviewed findings on this topic
    • Required — Construction, installation, alteration, extension, repair, and operation of OSSFs, including septic systems, in Texas and therefore potentially Eastland County unless a documented exception applies.
      “A permit is required to construct, install, alter, extend, or repair an OSSF. Always check with your local permitting authority. Local permitting programs can be more stringent than State minimums.”
    • Required — Construction, alteration, repair, extension, or operation of an on-site sewage facility in unincorporated Eastland County, including an area administered by an authorized agent, unless an express §285.3(f) exception applies.
      “a person shall hold a permit and an approved plan to construct, alter, repair, extend, or operate an on-site sewage facility (ossf) unless the ossf meets one of the exceptions in subsection (f) of this section.”
    • Required — Construction, installation, alteration, extension, or repair of an OSSF in Texas
      “A permit is required to construct, install, alter, extend, or repair an OSSF. [...] An OSSF may be exempt from permitting if it complies with all other requirements, including planning, construction, and installation standards of 30 TAC 285 AND meets the “10 acre rule”:”
  • Septic inspectionLimited

    OSSF installation and, where applicable, maintenance inspections in Texas

    • Authorized agents or their designated representatives inspect system installation.
    • Some permitting authorities impose more stringent requirements.
    • Maintenance-provider inspection and reporting requirements apply to systems and circumstances governed by 30 TAC §285.91(4).
    • Electronic monitoring may reduce reporting to every six months where the stated monitoring conditions apply.

    reduced maintenance reporting interval with qualifying electronic monitoring: 6 months (only where the system uses the specified electronic monitoring, automatic notification, and disinfection monitoring)

    “Many times, the AA has a "designated representative" (DR) to assist them with their responsibilities, which include reviewing plans for constructing, altering, extending or repairing each OSSF; issuing permits; and inspecting system installation. [...] If the system uses an electronic monitor, automatic radio or telephone to notify the maintenance provider of system or component failure and to monitor the amount of disinfection in the system, reporting may be reduced to every six months.”
    One more reviewed finding on this topic
    • Limited — OSSFs using secondary treatment or drip irrigation in Texas.
      “A system using secondary treatment or drip irrigation must be inspected by a valid maintenance company once every four months, or be maintained by the single family homeowner, where allowed.”
  • Off-grid sanitationLimited

    Off-grid wastewater sanitation through an OSSF in Texas.

    • An OSSF generally requires a permit and approved plan before construction, installation, alteration, extension, repair, or operation.
    • A qualifying single-family dwelling on a tract of at least 10 acres may use the 10-acre permitting exemption only if every stated site-evaluation, setback, nuisance, groundwater, on-site disposal, and single-dwelling condition is met.
    • Local permitting authorities may impose requirements more stringent than state minimums.
    • Emergency repairs are exempt from permitting only for the listed repair types and must be reported in writing within 72 hours after repairs begin.

    10-acre exemption tract size: >= 10 acres (all TCEQ conditions must be satisfied) · 10-acre exemption OSSF setback: >= 100 feet from property line (all parts of the OSSF)

    “An OSSF may be exempt from permitting if it complies with all other requirements, including planning, construction, and installation standards of 30 TAC 285 AND meets the “10 acre rule”:”
    2 more reviewed findings on this topic
    • Limited — Off-grid domestic wastewater treatment through an OSSF or septic system in Texas, including Eastland County where the applicable permitting authority allows the system.
      “Almost all OSSFs must have a permit prior to any construction, installation, repair, extension, or other alteration. [...] OSSFs can handle only domestic sewage. Industrial or hazardous waste cannot enter an OSSF; this waste will be treated in the soil and will ruin an OSSF by literally killing the bacteria that break down the biosolids.”
    • Limited — Composting toilets used as on-site sewage facility treatment systems in Texas.
      “Composting toilets will be approved by the executive director provided the system has been tested and certified under NSF International Standard 41 (1999) or under any other standards approved by the executive director.”
  • Well permitLimited

    Wells subject to groundwater-conservation-district permitting under Texas Water Code Chapter 36, including wells located in areas of Eastland County covered by a groundwater conservation district if such coverage exists.

    • A groundwater conservation district may provide exemptions from its permit requirements.
    • A district must exempt a well used solely for domestic use or livestock or poultry when it is on a tract larger than 10 acres and is incapable of producing more than 25,000 gallons of groundwater per day.
    • The exemption does not apply when the groundwater is used to supply a subdivision for which plat approval is required under Chapter 232, Local Government Code.
    • A district may not restrict production from a well qualifying under Section 36.117(b)(1).
    • A district may require well registration and the driller must file the required well log.
    • The TWDB 2021 GMA 8 table identifies Eastland County's Trinity (Antlers) area as No District-County; the source does not establish coverage for every aquifer or parcel in Eastland County.

    minimum tract size: > 10 acres (The exemption does not apply to subdivision-supply wells for which plat approval is required under Chapter 232, Local Government Code.) · maximum production capacity: <= 25000 gallons per day (The well must be incapable of producing more than this amount.)

    “drilling or operating a well used solely for domestic use or for providing water for livestock or poultry”
    One more reviewed finding on this topic
    • Limited — Drilling, equipping, operating, or completing a water well, or substantially altering a well or well pump, where the well is within a groundwater conservation district in Texas.
      “Except as provided by Section 36.117, a district shall require a permit for the drilling, equipping, operating, or completing of wells or for substantially altering the size of wells or well pumps.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Utility service to subdivided land in a county any part of which is within 100 miles of an international border, contains the majority of the area of a municipality with a population greater than 250,000, and is not a county within 50 miles of an international border, where Texas Local Government Code Chapter 232, Subchapter B applies.

    • The utility must receive either a commissioners-court certificate under Local Government Code §232.028(a), or a commissioners-court determination under §232.028(b)(1) that the plat has been reviewed and approved.
    • The operative restriction excepts Local Government Code §232.0291(d) and §232.037(c).
    • The underlying subchapter applies only to land subdivided into two or more lots intended primarily for residential use in the county's jurisdiction; a lot of five acres or less is presumed residential.
    • The underlying subchapter does not apply if the subdivision is a qualifying gift between relatives within the third degree, if all subdivision lots exceed 10 acres, or to a county to which Subchapter G applies.
    • For this subchapter, county jurisdiction means land in the county outside municipal corporate limits, except where a municipal-county agreement under Local Government Code §242.001 authorizes municipal plat and permit regulation in the municipality's extraterritorial jurisdiction.
    “Except as provided by Subsection (d) or Section 232.037(c), a utility may not serve or connect any subdivided land with water or sewer services unless the utility receives a certificate issued by the commissioners court under Section 232.028(a) or receives a determination from the commissioners court under Section 232.028(b)(1) that the plat has been reviewed and approved by the commissioners court.”
    One more reviewed finding on this topic
    • Water and sewer (with conditions) — Utility service to subdivided land in a county any part of which is within 50 miles of an international border, where Texas Local Government Code Chapter 232, Subchapter B applies.
      “Except as provided by Subsection (c) or Section 232.037(c), a utility may not serve or connect any subdivided land with water or sewer services unless the utility receives a certificate issued by the commissioners court under Section 232.028(a) or receives a determination from the commissioners court under Section 232.028(b)(1) that the plat has been reviewed and approved by the commissioners court.”
  • Agricultural exemptionAvailable (with conditions)

    Qualifying agricultural, farm, ranch, wildlife-management, or timber-production land in Eastland County outside municipality limits that is divided into two or more parts.

    • The owner must not lay out any part of the tract for the public-use purposes described by Local Government Code Section 232.001(a)(3).
    • The land must be used primarily for agricultural use as defined by Section 1-d, Article VIII, Texas Constitution, or for farm, ranch, wildlife management, or timber production use within the meaning of Section 1-d-1, Article VIII, Texas Constitution.
    • If the tract ceases to be used primarily for the qualifying agricultural or production use, the platting requirements of Chapter 232 apply.
    • The exception is a limitation on the county's authority to require a subdivision plat; it does not exempt the land from other applicable state, county, municipal, health, wastewater, floodplain, or recording requirements.

    division threshold: >= 2 parts (The agricultural exception applies to a qualifying tract divided into two or more parts.) · qualifying use: primarily agricultural, farm, ranch, wildlife management, or timber production (The applicable constitutional or statutory definitions control.)

    “the land is to be used primarily for agricultural use, as defined by Section 1-d, Article VIII, Texas Constitution”
    2 more reviewed findings on this topic
    • Available (with conditions) — Agricultural, farm, ranch, wildlife-management, or timber-production land outside municipal limits in Eastland County that is being divided into two or more parts for purposes covered by the county subdivision-platting statute.
      “the land is to be used primarily for agricultural use”
    • Available (with conditions) — Texas professional-engineering licensing for a person or entity constructing or preparing plans for a private building used exclusively for farm, ranch, or agricultural purposes, or storage of raw agricultural commodities.
      “exempt from the licensing requirements of this chapter if: [...] (E) a private building to be used exclusively for: (i) farm, ranch, or agricultural purposes”
  • Shed and accessory-building permit exemptionAvailable (with conditions)

    Texas professional-engineering licensing for a garage or other structure pertinent to a qualifying private dwelling or limited-size apartment building.

    • The person or entity must not make or imply a representation that engineering services have been or will be offered to the public.
    • The accessory structure must be a garage or other structure pertinent to a private dwelling, a one-story apartment building with no more than eight units, or an apartment building no more than two stories high with no more than four units.
    • This is an exemption from Chapter 1001 engineering-licensing requirements, not an affirmative exemption from locally administered building permits, zoning, septic, floodplain, well, or other requirements.
    • The Section 1001.056 exemption does not apply to engineering design or inspection necessary for residential-dwelling windstorm certification under Insurance Code Chapter 2210, Subchapter F.
    • The Section 1001.056 exemption does not apply to engineering design for a residential-dwelling slab on qualifying expansive soil unless the work meets IRC requirements as applied in the jurisdiction where the dwelling is located.
    “exempt from the licensing requirements of this chapter [...] (D) a garage or other structure pertinent to a building described by Paragraph (A), (B), or (C);”
  • Subdividing landLimited

    Subdivision platting in Eastland County outside municipality limits, including divisions of land into two or more parts.

    • A tract outside municipality limits must generally be platted when divided into two or more parts to lay out a subdivision, lots, or streets, alleys, squares, parks, or other parts intended for public use.
    • The agricultural exception applies only when the owner does not lay out a part of the tract described by Local Government Code Section 232.001(a)(3), and the land is used primarily for qualifying agricultural, farm, ranch, wildlife-management, or timber-production purposes.
    • If the tract ceases to be used primarily for the qualifying agricultural or production use, the platting requirements apply.
    • Other statutory exceptions include certain transfers to relatives within the third degree, subdivisions with all lots greater than 10 acres, Veterans' Land Board sales, qualifying state or political-subdivision land, and specified floodplain sales to adjoining landowners.
    • The county commissioners court must approve a plat required by Section 232.001, and a plat must be filed and recorded with the Eastland County Clerk.

    minimum division triggering general plat rule: >= 2 parts (Subject to statutory exceptions in Section 232.0015.) · agricultural-use exception: primarily agricultural, farm, ranch, wildlife management, or timber production use (No part may be laid out for the public-use purposes described by Section 232.001(a)(3).)

    “land located outside the limits of a municipality must have a plat [...] if the owner divides the tract into two or more parts”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivision of land in Eastland County outside municipal limits, including divisions subject to county platting authority under Texas Local Government Code Chapter 232.
      “The owner of a tract of land located outside the limits of a municipality must have a plat of the subdivision prepared”
  • Driveway accessRequired

    New or modified access driveways connecting property to a Texas state highway right of way.

    • A local public agency may receive access driveway permitting authority for state highways, but TxDOT approval remains required for drainage impacts on the state highway system before local approval.
    • No access driveway is permitted within a flared or widened right-of-way section at an intersection of a state highway with another highway, road, or street.
    • All entrances and exits, including radii, must be confined within the permittee's property frontage.
    • One-way 45-to-90-degree driveways are permitted for connections to one-way frontage roads or lane-divided highways; otherwise the driveway angle must be 75 to 90 degrees.
    • ADAAG and Texas Accessibility Standards apply.

    private residential driveway maximum width: <= 24 feet (Except as increased by permissible radii.) · driveway-to-pavement radius: >= 15 feet

    “A driveway must be constructed in accordance with a fully executed driveway permit”
    One more reviewed finding on this topic
    • Required — New or modified driveway access to a state highway serving property in Eastland County.
      “A completed Permit Form 1058 is necessary whenever new access driveways are constructed or existing access driveways are modified.”
  • Building in a floodplainRequired

    OSSF development on any tract in Eastland County where an OSSF will be installed.

    • The 100-year floodplain must be determined from FEMA maps or, when FEMA maps are unavailable, a flood study prepared by a professional engineer.
    • The 100-year flood boundaries must be shown on the site drawing, including an indication if the floodplain does not exist within the tract.
    • An OSSF site within a 100-year floodplain is subject to special planning requirements and must be located so flooding will not damage the system and cause environmental contamination.
    • Planning materials must show how tank flotation is eliminated.
    • Within a regulated floodway, a professional engineer must demonstrate that the system will not increase flood height, qualifying components are buried without added fill, and non-buried components are elevated above the 100-year flood elevation.

    floodplain design standard: 100-year floodplain

    “The 100-year floodplain for each tract of land where an OSSF will be installed shall be determined from either Federal Emergency Management Agency (FEMA) maps or from a flood study prepared by a professional engineer when FEMA maps are not available.”
  • Permit feesPublished (with conditions)

    OSSF permit fees applicable to an OSSF located in Eastland County where TCEQ is the permitting authority.

    • The application fee is $200 for an OSSF serving a single-family dwelling and $400 for all other types of OSSFs.
    • An additional $10 fee is collected for each OSSF permit.
    • Fees are payable when the owner or owner's agent applies, must be submitted to the appropriate regional office by money order or check, and must be payable to the Texas Commission on Environmental Quality.
    • The re-inspection fee equals one-half of the permit fee in effect when the original application was submitted; application fees are not refundable.
    • Where an authorized local agent administers the OSSF program, the authorized agent sets permit and inspection fees, plus the $10 commission fee.

    single-family-dwelling OSSF application fee: 200 USD · other OSSF application fee: 400 USD · commission fee per OSSF permit: 10 USD · re-inspection fee: one-half of permit fee in effect when original application was submitted

    “The application fee for an on-site sewage facility (OSSF) permit is: (1) $200 for an OSSF serving a single family dwelling; or (2) $400 for all other types of OSSFs.”
    2 more reviewed findings on this topic
    • Variable (with conditions) — Municipal building-permit fees for constructing, renovating, or remodeling structures in Texas municipalities.
      “In this section, "building permit fee" means a fee charged by a municipality as a condition to constructing, renovating, or remodeling a structure.”
    • Published (with conditions) — A Texas Department of Licensing and Regulation residential or commercial installation permit for each building containing industrialized-housing or industrialized-building modules or modular components.
      “Residential and Commercial Installation Permit | $75 for each building containing industrialized housing or buildings modules or modular components | Installation permit is in lieu of an industrialized builder’s registration in accordance with rule §§ 70.20 and 70.25.”
  • Permit processPublished (with conditions)

    Constructing a new driveway or revising an existing driveway on the right of way of a Texas state highway.

    • The applicant should contact the local District TxDOT office.
    • The applicant must submit Form 1058, Permit to Construct Access Driveway Facilities on Highway Right of Way.
    • The application must be for the bona fide purpose of securing or changing access to the owner's property, not parking or servicing vehicles on state highway rights of way.
    • No construction may begin on the right of way until a fully executed driveway permit is received and the applicant gives TxDOT 24-hour notification.
    • The driveway must comply with the executed permit and applicable regulations; TxDOT inspection must find construction satisfactory.
    • Where a local public agency has permitting authority, drainage impacts on the state highway system still require TxDOT approval before local approval.
    • Driveway geometrics, utilities, environmental requirements, wetlands considerations, ADAAG, TAS, and other applicable state and federal laws must be considered.

    required form: Form 1058, Permit to Construct Access Driveway Facilities on Highway Right of Way · advance notification: 24 hours (Notification to TxDOT is required before construction on the right of way.) · private residential driveway maximum width: <= 24 feet (Except as increased by permissible radii.) · minimum driveway radius to highway pavement: >= 15 feet

    “The applicant shall complete and submit to TxDOT a Form 1058”
    One more reviewed finding on this topic
    • Published (with conditions) — OSSF permit applications and approvals for property in Eastland County, including septic systems and holding tanks.
      “Applications and planning materials must be submitted to the permitting authority. To find your permitting authority, search by the county the OSSF is to be located.”
  • county zoning authorityLimited

    Texas counties adopting zoning regulations for specified unincorporated or otherwise specially defined areas.

    • Chapter 231 does not grant a general statewide county zoning power; authority is provided through geographically or subject-matter limited subchapters.
    • For Padre Island, the authority applies in Cameron or Willacy County outside a municipality and within two miles of a publicly owned park or recreational development, or within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.
    • Other Chapter 231 subchapters address special areas including the Amistad Recreation Area in Val Verde County, military zones, certain lakes, the El Paso Mission Trail Historical Area, Lake Somerville, and Falcon Lake in Zapata County.
    • The cited statute was enacted effective September 1, 1987; the Falcon Lake subchapter was added effective June 15, 2007, and amended effective September 1, 2009.

    Padre Island distance from publicly owned park or recreational development: <= 2 miles (Area must be outside a municipality and in Cameron or Willacy County.) · Padre Island distance from beach, wharf, or bathhouse: <= 2 miles (The beach, wharf, or bathhouse must be used by at least 500 persons annually.)

    “This subchapter applies to the areas of Padre Island located in Cameron or Willacy County and located: (1) outside a municipality but within two miles of a publicly owned park or recreational development; or (2) within two miles of a beach, wharf, or bathhouse used by at least 500 persons annually.”
    One more reviewed finding on this topic
    • Limited — County zoning authority over unincorporated land in Texas, where a specific statutory grant applies.
      “As you suggest, a county has very limited and specific zoning authority, and none that may be used to regulate construction or operation of the proposed facility.”
  • county building authorityLimited

    Texas counties adopting and enforcing fire-code building permits for specified buildings in unincorporated areas and applying residential building-code standards in certain counties.

    • Under Section 233.061, the county must have a population over 250,000 or be adjacent to a county with a population over 250,000.
    • Under Section 233.062, the fire code applies only to commercial establishments, public buildings, and multifamily residential dwellings consisting of four or more units constructed in an unincorporated area.
    • The fire code does not apply to an industrial facility having a fire brigade that conforms to Occupational Health and Safety Administration requirements.
    • A covered applicant must submit a plan and a commissioners-court-set application fee; the county must issue or deny the permit within 30 days, and failure to act within 30 days approves the construction for purposes of the subchapter.
    • The fire code must conform to the International Fire Code or Uniform Fire Code as those codes existed on May 1, 2005, or establish protective measures exceeding those standards; later editions may be adopted.
    • Residential standards under Section 233.152 apply only if the county adopts a resolution or order and the county is within 50 miles of an international border or has a population over 100.
    • Those residential standards apply only to new single-family-house or duplex construction beginning after September 1, 2009; manufactured or modular structures governed by Occupations Code Chapters 1201 or 1202 are excluded from the definition of new residential construction.
    • A municipality's building code controls in its extraterritorial jurisdiction, and Section 233.152 does not authorize county prior approval of new residential construction or county zoning regulations.
    • Fire-code inspection and permit fees may be charged under a fee schedule based on building type, limited to amounts necessary to administer and enforce the subchapter; inspection fees must be reasonable and reflect approximate inspection costs.

    county population threshold for fire-code authority: > 250000 persons (A county adjacent to a county over 250,000 also qualifies.) · multifamily residential dwelling threshold: >= 4 units (The fire code applies only to covered buildings constructed in an unincorporated area.) · residential-code border distance: <= 50 miles (Alternative qualification is county population over 100.) · application decision period: 30 days (If the commissioners court does not issue or deny the permit within 30 days after receiving the application and fee, construction is approved for purposes of the subchapter.) · residential standards effective construction date: > 2009-09-01 (Applies only to new residential construction that begins after September 1, 2009.)

    “The commissioners court of a county with a population of over 250,000 or a county adjacent to a county with a population of over 250,000 may adopt a fire code and rules necessary to administer and enforce the fire code. [...] The fire code applies only to the following buildings constructed in an unincorporated area of the county: (1) a commercial establishment; (2) a public building; and (3) a multifamily residential dwelling consisting of four or more units.”
    One more reviewed finding on this topic
    • Limited — County fire-code adoption and building-permit authority for specified buildings in unincorporated areas of qualifying Texas counties, including multifamily residential dwellings of four or more units.
      “The commissioners court of a county with a population of over 250,000 or a county adjacent to a county with a population of over 250,000 may adopt a fire code and rules necessary to administer and enforce the fire code.”

Inside cities and towns in Eastland County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Building code adoptedAdopted (with conditions)

    Building-code standards administered by the City of Eastland within the city.

    • The City of Eastland adopted the 2018 International Building Code as a reference code by Ordinance 21-868 on June 21, 2021.
    • Any subsequent editions of the International Building Code are adopted as reference codes and take effect from publication by the International Code Council.
    • The City of Eastland separately adopted the 2018 International Residential Code as a reference code by Ordinance 20-859 on March 16, 2020, with subsequent editions taking effect from publication.

    International Building Code edition: 2018 (Adopted as a reference code) · International Residential Code edition: 2018 (Adopted as a reference code)

    “The 2018 International Building Code, as published by the International Code Council, is hereby adopted as a reference code for the city.”
  • Local zoningPresent (with conditions)

    Lots 1–5 of Block 70 of the Daugherty’s Addition, within the City of Eastland, Texas.

    • The City of Eastland ordinance changed the listed parcels from the Single-Family Residential District (SF) to the General Business District (C2), amended the zoning district map, and adopted the map as amended.
    • This municipal zoning claim does not establish a county zoning rule for unincorporated Eastland County.
    “AN ORDINANCE OF THE CITY OF EASTLAND, TEXAS CHANGING THE ZONING USE DESIGNATION OF PROPERTY DESCRIBED AS LOTS 1 – 5 OF BLOCK 70 OF THE DAUGHERTY’S ADDITION TO THE CITY OF EASTLAND FROM SINGLE-FAMILY RESIDENTIAL DISTRICT (“SF”) TO GENERAL BUSINESS DISTRICT (“C2”); AMENDING THE ZONING DISTRICT MAP FOR THE CITY OF EASTLAND TO REFLECT SUCH CHANGE; AND ADOPTING THE ZONING DISTRICT MAP SO AMENDED.”
    2 more reviewed findings on this topic
    • Present (with conditions) — Zoning and land-use regulation within the City of Eastland, Texas; the city also states that its subdivision-platting regulations apply within the city limits and extraterritorial jurisdiction.
      “This multifaceted department oversees all development and long-range planning and zoning.”
    • Present (with conditions) — Development and land use within the City of Eastland, Eastland County, Texas.
      “This multifaceted department oversees all development and long-range planning and zoning. It also maintains the maps which govern the land use in the City and authorizes permits for building in the City of Eastland.”
  • Minimum lot sizeSpecified

    Subdivision plats within the City of Eastland and its extraterritorial jurisdiction, including the unincorporated area extending one-half mile from the city boundary.

    • The City of Eastland regulates subdivision platting through an adopted subdivision ordinance.
    • Plats are reviewed for minimum lot size and lot width, street access and size, utility provisions, drainage, and flood protection.
    • The source does not state the numeric minimum lot size or lot width.
    “Plats are reviewed for compliance with regulations regarding minimum lot size and lot width, street access and size, utility provisions and drainage and flood protection.”
  • Subdividing landRegulated (with conditions)

    Subdivision platting within the City of Eastland and its extraterritorial jurisdiction, including the unincorporated area extending one-half mile from the city boundary.

    • The City of Eastland regulates subdivision platting through an adopted subdivision ordinance.
    • A subdivision plat is a survey prepared by a licensed registered surveyor describing lot lines, streets, and easements.
    • The City states that state law requires every owner dividing a tract into two or more parts to first file a plat.
    • Plats are reviewed for minimum lot size and lot width, street access and size, utility provisions, drainage, and flood protection.

    ETJ extent: 0.5 mile from city boundary

    “The ETJ of the City of Eastland is the unincorporated area [...] extending outward to a perimeter one-half mile from the corporate boundary.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Short-term rentals — Short-term rental use in Eastland County, Texas.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Eastland County, Texas

Is Eastland County a good place to live off-grid or homestead?

Eastland County scores 68/100 on the Bolthole Index, a strong county profile. Its strengths: low administrative friction for a quiet rural property and manageable long-term carry cost.

How much does land cost in Eastland County, Texas?

Land in Eastland County runs about $3,026 per acre, based on the latest county data.

What is the water situation in Eastland County?

Eastland County gets about 31.1" of rain a year, with severe drought in roughly 26.7% of years.

How remote is Eastland County?

A representative private-land location has about 11,789 people within a 30-minute drive and 3,639,200 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.