Obion County, Tennessee

Building permits, zoning and land rules in Obion County, Tennessee

75Index Score / 100
#31 of 95 in Tennessee

Unincorporated Obion County, Tennessee requires a building permit, even though the county has no building code outside city limits1. Get the county permit from the Obion County Assessor’s Office; septic construction, modification and repair require a separate state permit through the Tennessee Department of Environment and Conservation1,2.

Do you need a building permit in Obion County, Tennessee?

Yes.

Yes. Buildings and related work in unincorporated Obion County require a building permit, and the county directs applicants to the Assessor’s Office in the courthouse1. The Assessor says permits are used for new buildings and remodels, demolition permits remove buildings from the records, and applicants should obtain permits for room additions, repairs after storm or flood damage, and new-home construction5.

Obion County has opted out of Tennessee’s State Residential Building Program, and no county building code exists outside city limits1,6. An owner or contractor may request a State Fire Marshal inspection during construction of a new home or addition; if the dwelling meets statewide building safety standards, the State Fire Marshal will issue a certificate of occupancy6. A parcel inside a municipality needs a city-specific answer because each city has its own codes1.

Who handles building permits in Obion County?

The Obion County Assessor of Property is the building-permit contact for a house or building located in unincorporated Obion County.

The Obion County Assessor of Property is the building-permit contact for a house or building located in unincorporated Obion County5. Call the office at (731) 507-0999 Ext.#4 or visit 4 Bill Burnett Circle in Union City; the office page also lists PO Box 327, Union City, TN 382815.

Tell the office the parcel location and describe the proposed new building, remodel, room addition, repair or demolition, because those are the project types the Assessor identifies on its permit page5. For land inside a city, contact that city’s building office instead; Obion County’s own guidance specifically routes Union City properties to the Union City Building Department5.

Does Obion County have zoning?

Obion County’s official guidance says each city has its own codes and no code exists outside city limits, so the rules depend first on whether the parcel is incorporated.

Obion County’s official guidance says each city has its own codes and no code exists outside city limits, so the rules depend first on whether the parcel is incorporated1. We could not confirm that unincorporated Obion County has no zoning ordinance, so ask the Assessor to identify any parcel-specific land-use approvals before treating rural land as unrestricted. The county building-permit requirement and state septic rules still apply outside city limits1,2.

Union City has zoning, and its official zoning map controls the current zoning status of land inside the city7. Property there must meet the rules for its mapped district7. Other incorporated cities may have different ordinances and should be contacted directly1. We could not confirm unincorporated-county rules for minimum home size, setbacks, subdivision approval, short-term rentals or floodplain development; ask the Assessor about those issues before buying or designing a project.

How do septic permits work in Obion County?

TDEC administers septic permits for Obion County through the Jackson Environmental Field Office.

TDEC administers septic permits for Obion County through the Jackson Environmental Field Office3. A permit is required to construct, modify or repair a septic system, and the installer must arrange a final inspection before covering the completed system2.

Applications may be filed online or on paper with the appropriate field office; review generally takes 10 days and must finish within 45 days after submission8. The conventional-system permit is $400 for design flow up to 1,000 gallons per day, with a $100 construction inspection; alternative systems begin with a $500 permit and a $200 inspection8. Only 12.2% of county soils are rated without severe limits for a conventional drain field, so make the site evaluation an early contingency9. Call TDEC’s septic-inquiry line at 731-441-55933.

Can you live in an RV or tiny home in Obion County?

We could not confirm an unincorporated Obion County rule that allows or prohibits living in an RV on private land, or a rule that sets a minimum size for a tiny home.

We could not confirm an unincorporated Obion County rule that allows or prohibits living in an RV on private land, or a rule that sets a minimum size for a tiny home. The county says no code exists outside city limits, but a county building permit is still required and Tennessee still requires a permitted septic system for construction, modification or repair1,2.

Before buying, ask the Obion County Assessor whether the proposed structure needs a county permit and whether any parcel-specific land-use rule applies, then ask TDEC how the wastewater arrangement can be approved3,5. Union City has zoning, and a manufactured dwelling there must meet district setbacks and other standards, connect to public utilities, and sit on a continuous permanent masonry wall; a previously occupied unit cannot be moved onto residentially zoned property in Union City7,10.

Building a home in Obion County: what are the steps?

Confirm whether the parcel is inside a city, because cities have their own codes and Union City has zoning, while unincorporated Obion County has no county building code.

  1. Confirm whether the parcel is inside a city, because cities have their own codes and Union City has zoning, while unincorporated Obion County has no county building code1,7.
  2. For unincorporated land, call the Obion County Assessor and obtain the required county building permit1,5.
  3. Apply to TDEC for the septic construction permit before installation or repair, allowing for the published review period2,8.
  4. If access will be built or changed on state highway right-of-way, obtain the required TDOT highway-entrance permit11.
  5. If building for your own use, confirm the Tennessee owner-builder conditions: one permit every two years, no sale, lease or rent, and licensing rules for hired prime contractors4.
  6. Have the septic installer arrange TDEC’s final inspection before covering the system2.

What should you check before buying land in Obion County?

Start with jurisdiction: each city has its own codes, while the county says no code exists outside city limits and still requires a building permit there.

Start with jurisdiction: each city has its own codes, while the county says no code exists outside city limits and still requires a building permit there1. Ask the Assessor to confirm the parcel’s jurisdiction and any land-use approvals. Then make the purchase contingent on a workable wastewater plan, because only 12.2% of soils are rated without severe limits for a conventional drain field9.

Confirm legal road access and whether a proposed entrance touches state highway right-of-way, where a TDOT permit is required11. Ask the relevant utility whether sewer service is available and whether connection is mandatory for the parcel12. We could not confirm the county’s private-well, floodplain-development or county-road driveway requirements; ask TDEC about wells, the Assessor about parcel-specific approvals, and the road authority that maintains the frontage before closing.

Watch-outs

  • A county building permit is still required even though the county says no code exists outside city limits1.
  • Do not cover a permitted septic installation until the installer has arranged the required final inspection2.
  • Rules inside an Obion County city differ from the unincorporated-county rules because each city has its own codes1.
  • Union City has zoning and does not allow a previously occupied manufactured home to be moved onto residentially zoned property7,10.

Sources

12 official pages, each quoted and re-checked · written October 9, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Unlike 3 of the 4 neighbors with published rules, Obion County has no countywide zoning.

RuleObion CountyLake CountyDyer CountyWeakley CountyGibson CountyCrockett CountyCarroll County
Building permitRequiredLimitedRequiredRequiredRequiredRequiredNot required
County zoningNoYesYesNoNot publishedYesNot published
Septic permitsTDECTDECTDECTDECTDECTDECTDEC

County locator

Obion County in Tennessee

75
County map
Obion County highlighted among the Tennessee counties · colored by Index score

How Obion County scores

75 / 100 · #31 of 95 in Tennessee · six factors, land price, tax, rain and climate

Seclusion57100% ev.
Self-Sufficiency72100% ev.
Admin Boringness64100% ev.
Durability49100% ev.
Property Autonomy71100% ev.
Carry Cost86100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$168kTypical home
0.6%Property tax
$4,192Land / acre
52.9"Annual rain
7.4% of yrsSevere drought
12.5 / yr (+11.5)Mid-century 100°F days
16.2 daysMid-century dry spell
2.48" (+7.8%)Mid-century 1-day rain
1.63×Wildfire change factor
100%Forward climate coverage
$1,881Home insurance / yr
0.2% / yrInsurance growth
0.99%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
31,288People within 30 min
1,102,038People within 2 hr
37,724Radius comparison (15 mi)
55.8People / sq mi
0.3%Federal land
81.7%Land at 15% slope or less
12.2%Soils rated "not limited" for septic (strict USDA rating)
41,062 acWorkable land screen
32.6%Wooded land
88.1 tonsBiomass / forest ac
58.9°FAvg temp

Scout Obion County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Obion County. Listing sites control their own results and filters.

Sell land in Obion County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Obion County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet covered: Town of Obion · Town of Rives · Town of Samburg · South Fulton · Town of Troy · Woodland Mills

Answers from the rulebook for Obion County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Obion County rules

  • Building permitRequired

    Buildings and related work in unincorporated Obion County.

    • The FAQ states a permit is required even though no county building code exists outside city limits.
    • Permits can be obtained from the Obion County Assessor’s Office in the courthouse.
    “Outside of city limits, no code exists. However, you do need to pull a building permit.”
  • Building code adoptedNot adopted

    County building code in unincorporated Obion County.

    • Municipal building codes may apply inside city limits.
    “Each city in the county has its own codes. Outside of city limits, no code exists.”
  • Local zoningVaries (with conditions)

    Countywide aggregate of municipal and unincorporated-area land-use controls in Obion County; this does not assert that the county administers municipal zoning.

    • The county FAQ states that each city has its own codes and directs questions concerning building-code issues within city limits to the respective city because cities often have different ordinances.
    • Union City administers a zoning ordinance within its municipal limits; its R-1, R-2, R-3, OTR-1, and OTR-2 district provisions do not establish rules for unincorporated county land.
    • The county FAQ's statement that no code exists outside city limits was made in response to a building-code question and is not treated here as proof that no county zoning ordinance exists.
    “Each city in the county has its own codes. Outside of city limits, no code exists.”
    One more reviewed finding on this topic
    • Varies (with conditions) — Aggregate of local zoning and code authority across Obion County's incorporated cities and areas outside city limits; the county does not administer each municipal ordinance.
      “Each city in the county has its own codes. Outside of city limits, no code exists. However, you do need to pull a building permit.”
  • County-wide zoningAbsent

    Per the county FAQ, each city has its own codes but outside city limits no zoning code exists, so unincorporated Obion County is not zoned.

    Obion County, TN - FAQs ↗From the county’s own site, awaiting a second reviewer

Tennessee rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    A person who owns property and constructs their own home in Tennessee, including Obion County.

    • The owner is allowed one permit every two years.
    • The home must not be for sale, lease, or rent and must be for individual use.
    • If the owner hires a contractor, that contractor is considered a prime and must be licensed and obtain the building permit for inspections.
    • The homeowner should not obtain the permit on behalf of the contractor because doing so could relieve the contractor from most liability and insurance requirements.
    • Contracts may not be split into phases to circumvent the law.
    • Anyone paid in excess of $25,000 by the owner is considered a prime and must be licensed.

    owner permits: per 1 permit per two years · amount paid by owner: > 25000 USD (Anyone paid in excess of this amount is considered a prime and required to be licensed.)

    “Yes. A person who owns property is allowed one permit every two years to build their home as long as it is not for sale, lease, or rent (individual use). If they hire a contractor, the contractor is considered a "prime" and required to be licensed, as well as obtain the building permit for inspections. (TCA 62-6-103 and Rule 0680-1-.22)”
    One more reviewed finding on this topic
    • Conditional — A Tennessee property owner constructing a single residence for the owner's individual use.
      “one permit every two years to build their home as long as it is not for sale, lease, or rent (individual use).”
  • InspectionsLimited

    One- and two-family dwellings and townhouses in areas of Tennessee where the State Fire Marshal's residential building code enforcement program applies (not areas with locally enforced codes under an exemption, and not opt-out jurisdictions).

    • Program does not apply where the local government has received an exemption from the State Fire Marshal's Office by enforcing local building codes.
    • Program does not apply where the city or county legislative body opted out by a 2/3 vote; in opt-out jurisdictions an owner may request a State Fire Marshal inspection (Tenn. Code Ann. 68-120-101(b)(1)(d)) and receive a certificate of occupancy if standards are met.
    • The page lists inspections of the foundation before pouring, framing/rough-in and final; this record does not state a fixed minimum count, and whether any inspection may be waived was not located on the pages opened.
    • A slab inspection is not required for garages or unfinished basements; an additional slab inspection fee applies if the slab under living space is not a monolithic pour.
    • One free re-inspection per project if a required inspection is not passed the first time; additional re-inspections require a fee.
    • Detached garages, sheds, barns and other detached structures not used for living purposes do not need a state residential building permit.
    • Inspections are performed by state contracted inspectors and scheduled at core.tn.gov.

    inspection stages: foundation before pouring; framing/rough-in; final (slab inspection not required for garages or unfinished basements; waiver rules not confirmed)

    “inspections are performed of the foundation prior to pouring, the framing/rough-in construction and the final construction.”
    One more reviewed finding on this topic
    • Limited — One- and two-family dwellings in Obion County areas identified by Tennessee as opt-out or non-code jurisdictions.
      “Their home may now be inspected by an inspector with the State Fire Marshal’s Office during the construction process, both for new construction and additions to existing homes. If the one- or two-family dwelling is determined to meet the statewide building construction safety standards, the State Fire Marshal’s Office will release a Certificate of Occupancy, often referred to as a “CO.””
  • Certificate of occupancyLimited

    Certificates of occupancy for one- and two-family dwellings in Tennessee opt-out or non-code jurisdictions when the State Fire Marshal's Office inspects the dwelling during construction.

    • The owner or contractor may obtain a state building permit to request the inspection.
    • The Certificate of Occupancy is released only if the dwelling is determined to meet statewide building construction safety standards.
    • The source describes this process for opt-out or non-code jurisdictions and for new construction or additions to existing homes.
    “determined to meet the statewide building construction safety standards, the State Fire Marshal’s Office will release a Certificate of Occupancy”
  • Camping on your landLimited

    Overnight camping on Tennessee Wildlife Resources Agency-controlled Wildlife Management Areas and related lands where overnight camping is allowed.

    • Overnight camping may be permitted only in designated areas and by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor.
    • Camping is subject to limitations prescribed in the permit if required.
    • Camping may not exceed three weeks from the beginning to the end of the camping stay.
    • Owner contact information or a TWRA ID number and date of arrival must be displayed on a camper, tent, vehicle, or similar item at all times.
    • Where overnight camping is allowed, firearms and archery equipment must remain in camp except during legal hunting hours.

    maximum camping stay: <= 3 weeks

    “May be permitted in designated areas by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor. Such camping is subject to the limitations prescribed in the permit if required.”
    One more reviewed finding on this topic
    • Limited — Camping and use of trailers or other camper units in Tennessee state forests administered by the Tennessee Department of Agriculture, Division of Forestry.
      “Camping and the use of trailers or other camper units are allowed only at designated locations. The district forester will issue written permits to persons to camp in backcountry or other isolated sections of a forest area.”
  • Tiny homesAllowed (with conditions)

    Preassembled permanent tiny homes delivered to a homeowner as a completed unit, including a tiny home built off-site on a chassis or installed on a permanent foundation.

    • The State Fire Marshal’s Office says its inspection program allows construction, inspection, and permanent consumer use of tiny homes and similar structures.
    • The program inspection is described as similar to inspections of a site-built home and provides a decal reflecting compliance with adopted statewide building and electrical codes.
    • State residential-code regulations apply to new construction; additions over 30 square feet have been covered since October 1, 2011.
    • A state residential building permit is not zoning approval and does not authorize violation of a local ordinance; local zoning or other local requirements may independently control placement or occupancy.
    • If a subsurface sewage system will serve the residence, a conventional septic-system permit is required for installation of a conventional system or approved substitute product; an alternative-system permit is required for installation of an alternative system.
    • If a water well is drilled or a well pump or water-treatment device is installed, the work must be performed by a licensed person.

    addition area triggering state residential-code regulation: > 30 square feet (Applies to additions beginning October 1, 2011.)

    “The new tiny home inspection program was developed to allow for the construction, inspection and use of tiny homes and similar structures for permanent use by consumers.”
  • Manufactured homesLimited

    HUD-labeled manufactured homes installed in Tennessee under the state manufactured-housing program.

    • Manufactured homes must be installed by licensed installers and have an installation decal applied after setup.
    • A state residential building permit is not required merely to place a manufactured or modular home in the state program, but a Manufactured/Modular Site Work Permit is required for a custom addition, site-built deck, porch, or stoop next to the home.
    • A state residential building permit is not zoning approval and does not authorize violation of a local ordinance; local zoning or other local requirements may independently control siting or occupancy.
    • If a subsurface sewage system will serve the residence, state septic-system permitting applies.
    “Ensure your application is approved and your license is active prior to installing any manufactured home in the state of Tennessee”
  • Who permits septicMixed (with conditions)

    Tennessee subsurface sewage disposal system construction permitting and related SSDS administration statewide.

    • The Tennessee Division of Water Resources administers SSDS permitting in non-contract counties.
    • Permit packages and Certificate of Completion packages for sites in contract counties are submitted directly to the contract county.
    • The listed contract counties are Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby, and Williamson.
    • Installer permits are valid statewide, but contract counties may require an additional permit.
    “Permit packages and Certificate of Completion Packages for sites located in the contract counties listed below should be submitted directly to the contract county.”
    2 more reviewed findings on this topic
    • State (with conditions) — Subsurface sewage disposal systems serving property in Obion County.
      “Benton, Carroll, Decatur, Dyer, Hardin, Haywood, Lake Lauderdale, Obion, Weakley, Chester, Crockett, Gibson, Hardeman (Division of Water Resources served by Memphis EFO, except for septic related services), Henderson, Henry, Madison, McNairy”
    • Mixed (with conditions) — Statewide subsurface sewage disposal system permitting and assistance, with specified contract counties providing ground water protection services in their own areas.
      “NOTE: Some counties provide ground water protection services for their own areas. The online application form is not to be submitted for services requested in the following metropolitan or contact counties: Blount County, Davidson County/Nashville, Hamilton County, Jefferson County, Knox County, Madison County, Sevier County, Shelby County, Williamson County.”
  • Septic permitRequired

    Construction, installation, modification, or repair of residential, commercial, or industrial septic systems in Tennessee.

    • A permit is required before construction, modification, or repair.
    • A septic system permit should be obtained before starting dirt work or construction of any building, including the building pad.
    • Repair permits have no permit fee.
    • Alternative systems require an extra-high intensity soils map prepared by a Tennessee-licensed soils consultant.
    • Contract counties may require an additional permit.

    new conventional SSDS permit fee: 400 USD up to 1000 gallons per day design flow ($100 for each additional 1000 gpd flow) · new alternative SSDS permit fee: 500 USD up to 1000 gallons per day design flow ($150 for each additional 1000 gpd flow) · experimental SSDS permit fee: 500 USD · repair permit fee: 0 USD (Repair construction inspection fee is $100)

    “A septic system permit is required for the construction, modification or repair of a septic system. This permit ensures that the septic system design complies with state regulations and safeguards your health by properly managing wastewater.”
    One more reviewed finding on this topic
    • Required — Construction, modification, or repair of septic systems in Obion County.
      “A septic system permit is required for the construction, modification or repair of a septic system.”
  • Septic inspectionRequired

    Installation of subsurface sewage disposal systems in Tennessee.

    • The installer must notify the Division when installation is complete.
    • A final inspection is scheduled before the system is covered.
    • TDEC inspects each SSDS installation for compliance with permit conditions and regulatory requirements.
    • Inspection fees vary by system type: $100 for new conventional or large-diameter graveless pipe systems, $200 for alternative systems, and $100 for repair construction inspections.

    new conventional construction inspection fee: 100 USD · alternative construction inspection fee: 200 USD · repair construction inspection fee: 100 USD

    “The applicant or SSDS installer must notify the Division when a system has been installed so that it can be inspected and approved.”
    One more reviewed finding on this topic
  • Off-grid sanitationLimited

    Construction, modification, or repair of an on-site subsurface sewage disposal (septic) system, including systems serving residential, commercial, and industrial properties in Tennessee.

    • A septic-system permit is required for construction, modification, or repair.
    • An applicant planning a new system, or repair or modification of an existing system, must apply for a permit.
    • A TDEC Environmental Scientist conducts a site evaluation and may request a detailed site plan or soils map from a private licensed soil consultant.
    • If a permit is issued, the applicant provides it to a licensed installer; after installation, the installer contacts the local Environmental Scientist for a final inspection before the system is covered.
    • A Certificate of Completion is issued if the installation is approved.
    “A septic system permit is required for the construction, modification or repair of a septic system.”
  • Well permitRequired

    Drilling a water well for production of water from underground sources in Tennessee.

    • Before drilling, the property owner or licensed well driller must submit a Notice of Intent to the Director in the Department-prescribed manner.
    • A driller must have documentation that the Notice of Intent was submitted to the Division of Water Resources before beginning operations at a drill site.
    • The Notice of Intent fee or a receipt must accompany the driller's report; no well or borehole may be drilled unless the driller has documentation that a Notice of Intent has been filed.
    • A Notice of Intent and fee are not required for well closure, deepening, or reworking of a water well or closed-loop geothermal borehole.
    • The Notice of Intent fee requirement does not apply in a qualifying local jurisdiction authorized to regulate well location and construction that has a Commissioner-approved inspection fee.
    • The Notice of Intent fee does not apply when the property owner filed a notice and paid the fee for the same property within the previous five years, provided the new notice identifies the first notice's identification number.
    • A Notice of Intent expires 180 days after its original filing date.

    Notice of Intent fee for water wells for production of water per property site: 75 USD (Not required for qualifying local jurisdictions or when the same property satisfies the five-year prior-notice exception.) · Notice of Intent expiration: 180 days

    “A Notice of Intent to drill a water well must be submitted by the property owner or the licensed well driller to the Director in the manner prescribed by the Department, prior to commencement of drilling a water well in Tennessee.”
  • Mandatory utility hookupConditional

    Connection of buildings to sanitary sewer systems where a qualifying Tennessee utility system has issued bonds payable for sewer services and the property abuts a street or public way containing a sanitary sewer.

    • The property must abut a street or other public way containing a sanitary sewer.
    • A building must exist on the lot or parcel for residential, commercial, or industrial use.
    • The utility system may require connection and cessation of other sewage-disposal methods.
    • For electrical service, written notification must show public sewer service, a septic permit application, or an existing septic system.
    “Utility systems within the State of Tennessee that have issued bonds payable for sewer services are granted authority in TCA § 7-35-201 (1) to "require the owner tenant or occupant of each lot or parcel of land that abuts upon a street or other public way containing a sanitary sewer and upon which lot or parcel a building exists for residential, commercial or industrial use, to connect the building with the sanitary sewer and to cease to use any other means for the disposal of sewage, sewage waste or other polluting matter."”
    One more reviewed finding on this topic
    • Sewer (with conditions) — Residential, commercial, or industrial buildings on lots or parcels abutting a street or other public way containing a sanitary sewer, where the applicable Tennessee utility system has issued bonds payable for sewer services.
      “Utility systems within the State of Tennessee that have issued bonds payable for sewer services are granted authority in TCA § 7-35-201 (1) to "require the owner tenant or occupant of each lot or parcel of land that abuts upon a street or other public way containing a sanitary sewer and upon which lot or parcel a building exists for residential, commercial or industrial use, to connect the building with the sanitary sewer and to cease to use any other means for the disposal of sewage, sewage waste or other polluting matter."”
  • Agricultural exemptionConditional

    Buildings or structures on land used for agricultural purposes and subject to county zoning regulation in Tennessee.

    • The building or structure must be located on lands devoted to agricultural uses.
    • The building or structure must be incidental to the agricultural enterprise.
    • The exemption does not apply to agricultural lands adjacent or in proximity to state or federal-aid highways, public airports, or public parks.
    • The exemption does not apply to land located within the one-hundred-year flood plain.
    • The Attorney General opinion states that the provision applies to counties only and has no application to municipalities.
    • There is no blanket exemption for cotton gins, grain elevators, slaughterhouses, processing plants, or milk bottling plants; those structures qualify only when the statutory conditions are met.
    “it must be located on lands “devoted to agricultural uses;” and (2) it must be “incidental to the agricultural enterprise.””
  • Shed and accessory-building permit exemptionAvailable (with conditions)

    State residential building permits for detached garages, sheds, barns, and other detached structures that are not used for living purposes.

    • This is an exemption from the state residential building permit, not an exemption from all state or local requirements.
    • The State Residential Building Code Enforcement Program applies only in areas that have not received an SFMO exemption through local-code enforcement and have not opted out by a two-thirds vote of the city or county legislative body.
    • The exemption stated by the Department is limited to detached structures not used for living purposes; the opened official page does not state an accessory-structure size threshold.
    • The state residential building permit is not zoning approval and does not authorize violation of state law, regulation, or local ordinance.
    “A state residential building permit is not required for detached garages, sheds, barns or other detached structures that are not used for living purposes.”
  • Driveway accessLimited

    Construction, modification, revision, or change in use of a driveway on Tennessee state highway right-of-way.

    • The requirement applies to state highway right-of-way and does not establish a permit requirement for every driveway on every road.
    • Property owners must obtain the permit from TDOT.
    • County or municipal land-use regulations may also apply.
    “Under state law, a permit is required before construction of a driveway on state highway right-of-way, including the modification, revision, or change in use”
  • Building in a floodplainLimited

    Development in or near mapped floodplains throughout Tennessee, insofar as Tennessee's statewide floodplain-management guidance describes locally administered requirements.

    • Floodplain development requirements are managed locally by the community where the property is located.
    • Each NFIP-participating community has a local floodplain administrator who helps manage development in mapped flood hazard areas.
    • If the property is inside city limits, contact the city floodplain administrator; if outside city limits, contact the county floodplain administrator.
    • Local review may be required before development begins in a regulated floodplain.
    • Requirements vary by community and are based on the local floodplain management ordinance and flood zones mapped in that community.
    • Development activity that may require local review includes construction, repairs, substantial improvements, placement of fill, grading, excavation, manufactured homes, accessory structures, or other development activity.
    • Floodplain management ordinances are adopted, administered, and enforced by the local community, not by TEMA.

    local review before development in a regulated floodplain: may be required (Requirements vary by community and mapped flood zone.)

    “Floodplain development requirements are managed locally. Each community that participates in the National Flood Insurance Program has a local floodplain administrator who helps manage development in mapped flood hazard areas. [...] If the property is inside city limits, contact the city floodplain administrator. If the property is outside city limits, contact the county floodplain administrator. [...] Local review may be required before development begins in a regulated floodplain. Requirements vary by community and are based on the local floodplain management ordinance and flood zones mapped in that community.”
  • Permit feesPublished (with conditions)

    Tennessee SSDS permits and inspections applicable in Obion County.

    • Fees vary by system type and design flow.
    • Repair permits have no permit fee but repair construction inspection has a $100 fee.

    new conventional or large diameter graveless pipe SSDS permit: 400 USD up to 1000 gallons per day design flow ($100 for each additional 1000 gpd flow) · new conventional SSDS construction inspection: 100 USD · new alternative SSDS permit: 500 USD up to 1000 gallons per day design flow ($150 for each additional 1000 gpd flow) · alternative SSDS construction inspection: 200 USD · experimental SSDS permit: 500 USD · repair permit: No permit fee · repair construction inspection: 100 USD

    “New Conventional or Large Diameter Graveless Pipe SSDS Permit | $400 up to 1000 gallons per day design flow”
    One more reviewed finding on this topic
    • Published (with conditions) — Residential building permits administered by Tennessee's State Residential Building Code Enforcement Program for one- and two-family dwellings and townhouses where the state program applies.
      “$0 to $5,000 | $100 | $100 | $100 $5,001 to $100,000 | $350 | $100 | $100”
  • Permit processPublished (with conditions)

    Residential permit purchase and inspection process under Tennessee's State Residential Building Code Enforcement Program.

    • The state program applies to one- and two-family dwellings and townhouses only in areas without the stated local-code exemption or opt-out.
    • A first-time CORE user must register for an account.
    • A building permit must be purchased online or at a local Issue Agent.
    • Inspections cover the foundation before pouring, framing/rough-in construction, and final construction.
    • One free re-inspection is available; each additional re-inspection requires an additional fee.
    • A homeowner may build a home only if it will be the homeowner's residence, not sold or leased, and the homeowner has not received a homeowner building permit during the preceding 24 months.
    • Detached garages, sheds, barns, and other detached structures not used for living purposes do not require a state residential building permit.
    • A permit is not required for installation of a manufactured or modular home, but custom site work such as a deck, patio, or stoop requires a permit.

    effective date for permit requirement for additions over 30 square feet: 2011-10-01 (Applies to additions to existing homes.) · free re-inspections per project: 1 inspection (Available if a required inspection is not passed the first time.)

    “A building permit must be purchased online or at a local Issue Agent. The cost of the building permit is based on the estimated cost”
    One more reviewed finding on this topic
    • Published (with conditions) — Tennessee SSDS permit process applicable in Obion County.
      “A detailed review of the application is conducted, and the applicant is notified when the review is complete. The review process generally takes 10 days and must be completed within 45 days of the date the application was submitted.”
  • county zoning authorityGeneral

    County legislative bodies adopting zoning regulations for portions of Tennessee counties outside municipal corporations.

    • The authority is exercised under the conditions and procedures in Tennessee Code Annotated §§ 13-7-101 through 13-7-119.
    • The grant applies to portions of counties outside municipal corporations.
    • County zoning authority does not authorize county building permits or regulation of buildings or structures on agricultural land when the building or structure is incidental to the agricultural enterprise, except on agricultural lands adjacent or in proximity to state federal-aid highways, public airports or public parks.
    • The agricultural-land limitation applies to counties only and has no application to municipalities.
    “Under Tenn. Code Ann. § 13-7-101, et seq., the General Assembly has expressly delegated the authority to county legislative bodies to enact zoning regulations and create a board of zoning appeals.”

Inside cities and towns in Obion County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Local zoningPresent (with conditions)

    Land within the City of Union City, Tennessee, which is an incorporated municipality in Obion County.

    • The City of Union City Department of Planning and Codes administers planning, zoning, plan review, and subdivision regulations.
    • The City publishes a Zoning Ordinance.
    • The Planning Commission reviews site plans and subdivision plans for compliance with city codes; its stated submittal deadline is 14 days before the scheduled meeting.
    • Board of Zoning Appeals applications for Home Occupations, Administrative Reviews, Special Exceptions, and Variances are heard case by case; the stated deadline is 14 days before the meeting and the regular-meeting application fee is $50.00.

    Planning Commission submittal deadline: 14 days before scheduled meeting · Board of Zoning Appeals application fee: 50 USD (regular meeting) · Board of Zoning Appeals submittal deadline: 14 days before scheduled meeting

    “The Department of Planning and Codes serves as the administrative body & information center for planning, zoning, plan review & subdivision regulations.”
    One more reviewed finding on this topic
    • Present (with conditions) — Land use within the City of Union City, an incorporated municipality in Obion County.
      “The City of Union City is hereby divided into thirteen zones, or districts, as shown on the Official Zoning Map which, together with all explanatory matter thereon, is hereby adopted by reference and declared to be part of this Ordinance.”
  • Zoning districtsPartial

    Published zoning-district information for Union City, a municipality within Obion County.

    • This claim is municipality-specific and does not establish zoning-district publication for unincorporated Obion County or other municipalities.
    “The City of Union City is hereby divided into thirteen zones, or districts, as shown on the Official Zoning Map [...]”
  • Minimum lot sizeDistrict specific (with conditions)

    Dwelling units in Union City's R-2 Medium Density Residential District, within Obion County.

    • The first-unit rule applies to dwelling units other than townhouses; each additional dwelling unit requires additional area.
    • Townhouses have a separate per-unit area requirement.
    • Other uses are subject to the Board of Zoning Appeals' determination.

    minimum lot area for first non-townhouse dwelling unit: >= 6000 square feet (Add 2,500 square feet for each additional dwelling unit) · minimum townhouse lot area: >= 2600 square feet per unit

    “6,000 sq. ft. for the first dwelling unit”
  • Manufactured homesLimited

    Placement of manufactured residential dwellings within Union City, Obion County.

    • The home must be installed on a continuous, permanent masonry wall.
    • The unit must meet setback and other requirements for the district in which it is located.
    • The unit must connect to public utility systems in compliance with applicable building codes.
    • Previously lived-in units may not be relocated to residentially zoned properties in Union City.
    • Flood-hazard-area requirements in Chapter 18 apply.

    masonry wall deadline: 90 days (after placement of the dwelling) · roof pitch: >= 3:12 ratio

    “Previously lived in units may not be relocated to residentially zoned properties in Union City.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Minimum dwelling size — Minimum dwelling-size requirements in Obion County, especially unincorporated areas.
  • Setbacks — Setback requirements in Obion County, especially unincorporated areas.
  • Lot coverage — Lot-coverage requirements in unincorporated Obion County.
  • Building height — Building-height requirements in unincorporated Obion County.
  • Living in an RV — Long-term RV occupancy or camping on private land outside Obion County municipalities.
3 more unanswered
  • Accessory dwellings
  • Subdividing land
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Obion County, Tennessee

Is Obion County a good place to live off-grid or homestead?

Obion County scores 75/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and strong self-sufficiency basics: 52.9″/yr rainfall plus 32.6% wooded land.

How much does land cost in Obion County, Tennessee?

Land in Obion County runs about $4,192 per acre, based on the latest county data.

What is the water situation in Obion County?

Obion County gets about 52.9" of rain a year, with severe drought in roughly 7.4% of years.

How remote is Obion County?

A representative private-land location has about 31,288 people within a 30-minute drive and 1,102,038 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Obion compares in Tennessee