Bolthole Index

Morgan County, Tennessee

Building permits, zoning and land rules in Morgan County, Tennessee

75Index Score / 100
#37 of 95 in Tennessee

Morgan County, Tennessee opted out of the state residential building-permit program, but we could not confirm whether the county requires its own building permit1. Ask Morgan County Government about building permits and zoning approval; TDEC handles septic permits and inspections throughout the county2,3,4.

Do you need a building permit in Morgan County, Tennessee?

Morgan County opted out of Tennessee's State Residential Building Program, so a state residential building permit is not the default for a house, duplex or townhouse there.

Morgan County opted out of Tennessee's State Residential Building Program, so a state residential building permit is not the default for a house, duplex or townhouse there1. Opting out does not prove that no building permit is needed: we could not confirm whether Morgan County requires a local building permit1. Tennessee's State Fire Marshal has adopted the 2021 International Building Code and the amended 2018 International Residential Code, subject to local-jurisdiction exceptions, but the county's own adopted code remains unconfirmed10. Ask Morgan County Government which building permit, code edition, inspections, fees and documents apply before work begins2.

Who handles Morgan County building permits and how do you reach them?

Morgan County maintains a Building Codes and Zoning department, but a direct department phone number, street address, online building-permit application and building-permit search portal could not be confirmed.

Morgan County maintains a Building Codes and Zoning department, but a direct department phone number, street address, online building-permit application and building-permit search portal could not be confirmed5. Call Morgan County Government at the number in the office listing and request the current Building Codes and Zoning contact2. Because Morgan County opted out of the state residential program, ask the county contact to identify any local building-permit application, plan review, inspection sequence, fee schedule and adopted code before construction1. Inside Wartburg, ask city Development Services about city building permits and zoning approval; TDEC still handles septic permits and inspections for properties in Morgan County3,4,11.

Does Morgan County, Tennessee have zoning?

Morgan County administers zoning through its Building Codes and Zoning department, but we could not confirm the operative county ordinance, map, district boundaries or whether every unincorporated parcel is covered.

Morgan County administers zoning through its Building Codes and Zoning department, but we could not confirm the operative county ordinance, map, district boundaries or whether every unincorporated parcel is covered5. Ask county Building Codes and Zoning for the parcel's district and written standards; the general county number can route the call2. Inside Wartburg, city Development Services assists with planning, permitting and zoning, so ask the city about building permits and zoning approval; TDEC remains the septic-permit authority3,11. RV occupancy, minimum dwelling size, minimum lot size and setbacks remain unconfirmed. Tennessee's agricultural zoning exemption is conditional: a qualifying structure must be on land devoted to agricultural use and incidental to the agricultural enterprise, and stated location exceptions apply12.

How do septic permits work in Morgan County?

A Morgan County property owner must obtain a TDEC Septic System Construction Permit before installing a septic system or repairing a faulty one.

A Morgan County property owner must obtain a TDEC Septic System Construction Permit before installing a septic system or repairing a faulty one6. Apply online or through the Knoxville Environmental Field Office; review generally takes 10 days and must be completed within 45 days after a complete submission3,13. A new conventional permit costs $400 for up to 1,000 gallons per day, plus a $100 construction inspection; system type and design flow can change the charge13. The system must pass final inspection before it is covered4. Only about 2.9% of county soils are rated without severe limits for a conventional drain field, so evaluate soils early14.

Can you live in an RV or tiny home in Morgan County?

We could not confirm a Morgan County rule allowing or prohibiting long-term RV living or temporary camping, so ask county Building Codes and Zoning for a parcel-specific written answer.

We could not confirm a Morgan County rule allowing or prohibiting long-term RV living or temporary camping, so ask county Building Codes and Zoning for a parcel-specific written answer2,5. Tennessee allows completed tiny homes intended as permanent residences to be inspected through the State Fire Marshal's Modular Building or Commissioner's Inspection Program, including units built off-site on a chassis or installed on a permanent foundation7. That state inspection path does not establish that Morgan County zoning allows a tiny home on a particular parcel7. We could not confirm the county's minimum dwelling size, zoning approval or local building-permit requirement for a tiny home; ask county Building Codes and Zoning before buying or placing one1,2.

Building a home in Morgan County: what are the steps?

Ask Morgan County Building Codes and Zoning to identify the parcel's zoning district, allowed residential use, setbacks, local building-permit requirement and adopted code; for a Wartburg parcel, ask city Development Services about city building permits and zoning approval.

  1. Ask Morgan County Building Codes and Zoning to identify the parcel's zoning district, allowed residential use, setbacks, local building-permit requirement and adopted code; for a Wartburg parcel, ask city Development Services about city building permits and zoning approval1,5,11. TDEC remains responsible for septic permits3.
  1. Apply to TDEC for the septic construction permit before dirt work or construction, including the building pad6. Include the requested site, occupancy, water, soils, well, driveway and utility information13.
  1. Before requesting electrical service, obtain written confirmation of public sewer service, a pending septic application or an existing septic system, as applicable6.
  1. Confirm driveway jurisdiction. For a county-road entrance, the Road Superintendent or designee sizes the culvert, the resident buys it and the county installs it9. A state-highway entrance requires a TDOT driveway permit15.
  1. If acting as owner-builder, ask Morgan County whether a local route is available; the state-program exemption does not resolve eligibility in this opt-out county2,8.
  1. Complete locally required building inspections, if any, and schedule TDEC's final septic inspection before covering the system4.

What should you check before buying land in Morgan County?

Start with written answers on zoning, setbacks, dwelling type, RV use, floodplain status and the local building-permit path from Morgan County Building Codes and Zoning, or from Wartburg Development Services for land inside the city.

Start with written answers on zoning, setbacks, dwelling type, RV use, floodplain status and the local building-permit path from Morgan County Building Codes and Zoning, or from Wartburg Development Services for land inside the city5,8,11. Arrange septic feasibility early because about 2.9% of county soils are rated without severe limits for conventional drain fields, and ask whether a planned land division needs a subdivision evaluation6,14. Confirm whether access is from a county road or state highway because different entrance requirements apply9,15. For budgeting context, the county's effective property-tax rate is about 0.6%, with a median annual property-tax bill of about $83714.

Watch-outs

  • Morgan County opted out of the state residential building-permit program, but the current local building-permit requirement and adopted code could not be confirmed; ask Morgan County Government before filing or building1,2.
  • Do not assume a wooded parcel will support a conventional septic field: about 2.9% of Morgan County soils are rated without severe limitations for that use14.
  • Before constructing an entrance onto a county road, have the County Road Superintendent or designee determine the needed culvert size and length9.

Sources

15 official pages, each quoted and re-checked · written October 4, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 3 of the 4 neighbors with published rules, Morgan County has countywide zoning.

RuleMorgan CountyRoane CountyScott CountyCumberland CountyAnderson CountyFentress CountyLoudon County
Building permitRequiredRequiredNot requiredRequiredRequiredLimitedRequired
County zoningYesYesNot publishedNot publishedYesNoYes
Septic permitsTDECTDECTDECTDECTDECTDECTDEC

County locator

Morgan County in Tennessee

75
County map
Morgan County highlighted among the Tennessee counties · colored by Index score

How Morgan County scores

75 / 100 · #37 of 95 in Tennessee · six factors, land price, tax, rain and climate

Seclusion57100% ev.
Self-Sufficiency58100% ev.
Admin Boringness50100% ev.
Durability76100% ev.
Property Autonomy71100% ev.
Carry Cost86100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$221kTypical home
0.6%Property tax
$4,274Land / acre
57.9"Annual rain
3.9% of yrsSevere drought
2.5 / yr (+2.4)Mid-century 100°F days
12.4 daysMid-century dry spell
2.36" (+9.8%)Mid-century 1-day rain
1.66×Wildfire change factor
100%Forward climate coverage
$1,616Home insurance / yr
-1.2% / yrInsurance growth
1.3%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
16,583People within 30 min
2,500,206People within 2 hr
36,683Radius comparison (15 mi)
41.3People / sq mi
1.6%Federal land
28.9%Land at 15% slope or less
2.9%Soils rated "not limited" for septic (strict USDA rating)
8,251 acWorkable land screen
87.1%Wooded land
60.2 tonsBiomass / forest ac
56.2°FAvg temp

Scout Morgan County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Morgan County. Listing sites control their own results and filters.

Sell land in Morgan County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Morgan County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet covered: Sunbright · Wartburg

Answers from the rulebook for Morgan County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Morgan County rules

  • Driveway accessRequired

    Construction of an entrance or exit road to a Morgan County road.

    • The County Road Superintendent or designee determines the required culvert size and length.
    • The resident must purchase the culvert.
    • The culvert must be at least fifteen inches in diameter.
    • The County Road Department installs the culvert.

    minimum culvert diameter: >= 15 inches

    “Before constructing an entrance or exit road to a county road, the resident or future resident must have County Road Superintendent or his designee determine the size and length of culvert required.”
  • County-wide zoningPresent

    The county's official Building Codes and Zoning department indicates the county administers zoning.

    Morgan County, TN - Building Codes and Zoning ↗From the county’s own site, awaiting a second reviewer

Tennessee rules that apply here

  • Building permitLimited

    State residential building permits for one- and two-family dwellings and townhouses in Tennessee jurisdictions where the State Fire Marshal's Office administers the residential building permit program.

    • The state permit is required only in some areas because other jurisdictions may enforce local residential building codes.
    • A county legislative body may remove unincorporated areas from the state program or a city legislative body may remove the city by a two-thirds vote.
    • The state permit does not replace grading or fill approval, floodplain compliance, septic or sewer permits, electrical permits, or zoning approval.
    • Local governments remain responsible for locally adopted codes and other requirements.
    “Why is the state residential building permit only required in some areas of the state?”
    One more reviewed finding on this topic
    • Limited — State residential building permits for one- and two-family dwellings and townhouses in Morgan County, Tennessee
      “Morgan County | OPT OUT | Randy Randolph | 5445randolph@gmail.com | 931-261-8994 [...] OPT OUT - The jurisdiction has passed a resolution opting out of the program”
  • Owner-builder exemptionConditional

    A Tennessee property owner constructing a single residence for the owner's individual use.

    • The owner may have one permit every two years.
    • The residence must not be for sale, lease, or rent.
    • If the owner hires a contractor, the contractor is a prime and must be licensed and obtain the building permit for inspections.
    • Contracts may not be split into phases to circumvent the licensing law.
    • Anyone paid more than $25,000 by the owner is considered a prime and must be licensed.
    • The exemption is based on TCA 62-6-103 and Rule 0680-1-.22.

    owner permits: per 1 permit per two years · contractor payment threshold: > 25000 USD (Anyone paid in excess of this amount is considered a prime and must be licensed.)

    “one permit every two years to build their home as long as it is not for sale, lease, or rent (individual use).”
    One more reviewed finding on this topic
    • Available (with conditions) — Homeowner construction under Tennessee's State Residential Building Code Enforcement Program.
      “construction is to be the residence of the homeowner (not to be sold or leased)”
  • Building code adoptedPartial

    Tennessee State Fire Marshal's Office residential building-code standards for one- and two-family dwellings and townhomes statewide, except where a qualifying local government enforces its own current residential code or has opted out.

    • The State Fire Marshal's Office has adopted the 2018 International Residential Code with amendments.
    • For one- and two-family dwellings and townhomes, the adopted energy code is the 2018 International Energy Conservation Code with amendments.
    • The statewide program applies only in areas that have not received an exemption from the State Fire Marshal's Office because local building codes are enforced by the local government or opted out of state residential building codes and enforcement by a two-thirds vote of the city or county legislative body.
    • A qualifying local jurisdiction may continue operating its own program if its building code is current within seven years of the most recent edition; other versions may be approved in writing by the State Fire Marshal's Office.
    • A county legislative body may vote to remove unincorporated areas of the county from the state program, and a city legislative body may vote to remove the city from the state program.
    • A city or county may opt out by passage, by a two-thirds vote, of a resolution exempting the city or county; the opt-out resolution expires 180 days following the date of the election for the city or county's legislative body.
    • If the subsequent legislative body does not vote to opt out before the resolution expires, the State Fire Marshal's Office begins enforcing the residential building-code requirements until the city or county enforces residential building codes or passes another opt-out resolution.
    • The State Fire Marshal's Office enforces only the codes it adopts; local governments enforce other locally adopted codes or requirements.
    • The state residential building permit is a building permit only and is not grading or fill approval, floodplain compliance, a septic or sewer permit, an electrical permit, or zoning approval.
    • The permit fee is based on the cost of construction and covers all required inspections and one free re-inspection; additional re-inspections cost $100 each.

    International Residential Code edition: 2018 (with amendments) · International Energy Conservation Code edition for one- and two-family dwellings and townhomes: 2018 (with amendments) · local-code currency window: <= 7 years (other versions can be approved in writing by the State Fire Marshal's Office) · opt-out vote: two-thirds vote (resolution expires 180 days following the date of the election for the city or county's legislative body) · additional re-inspection fee: 100 USD (one re-inspection per permit is free)

    “The codes currently adopted by the Tennessee State Fire Marshal’s Office are: [...] International Residential Code (IRC), 2018 edition, published by the ICC, with amendments;”
    2 more reviewed findings on this topic
    • Adopted (with conditions) — Tennessee State Fire Marshal’s Office building construction safety codes, including the International Building Code and International Residential Code, applicable in Tennessee subject to applicable statutory and local-jurisdiction exceptions.
      “The codes currently adopted by the Tennessee State Fire Marshal’s Office are: 1. International Building Code (IBC), 2021 edition, published by the International Code Council (ICC); See Appendix for amendments; 2. International Residential Code (IRC), 2018 edition, published by the ICC, with amendments;”
    • Adopted — The Tennessee State Residential Building Code Enforcement Program where the state program applies.
      “The state has adopted the 2018 International Residential Code (IRC)”
  • InspectionsLimited

    One- and two-family dwellings and townhouses in areas of Tennessee where the State Fire Marshal's residential building code enforcement program applies (not areas with locally enforced codes under an exemption, and not opt-out jurisdictions).

    • Program does not apply where the local government has received an exemption from the State Fire Marshal's Office by enforcing local building codes.
    • Program does not apply where the city or county legislative body opted out by a 2/3 vote; in opt-out jurisdictions an owner may request a State Fire Marshal inspection (Tenn. Code Ann. 68-120-101(b)(1)(d)) and receive a certificate of occupancy if standards are met.
    • The page lists inspections of the foundation before pouring, framing/rough-in and final; this record does not state a fixed minimum count, and whether any inspection may be waived was not located on the pages opened.
    • A slab inspection is not required for garages or unfinished basements; an additional slab inspection fee applies if the slab under living space is not a monolithic pour.
    • One free re-inspection per project if a required inspection is not passed the first time; additional re-inspections require a fee.
    • Detached garages, sheds, barns and other detached structures not used for living purposes do not need a state residential building permit.
    • Inspections are performed by state contracted inspectors and scheduled at core.tn.gov.

    inspection stages: foundation before pouring; framing/rough-in; final (slab inspection not required for garages or unfinished basements; waiver rules not confirmed)

    “inspections are performed of the foundation prior to pouring, the framing/rough-in construction and the final construction.”
  • Certificate of occupancyLimited

    Certificates of occupancy for one- and two-family dwellings in Tennessee opt-out or non-code jurisdictions when the State Fire Marshal's Office inspects the dwelling during construction.

    • The owner or contractor may obtain a state building permit to request the inspection.
    • The Certificate of Occupancy is released only if the dwelling is determined to meet statewide building construction safety standards.
    • The source describes this process for opt-out or non-code jurisdictions and for new construction or additions to existing homes.
    “determined to meet the statewide building construction safety standards, the State Fire Marshal’s Office will release a Certificate of Occupancy”
  • Camping on your landLimited

    Overnight camping on Tennessee Wildlife Resources Agency-controlled Wildlife Management Areas and related lands where overnight camping is allowed.

    • Overnight camping may be permitted only in designated areas and by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor.
    • Camping is subject to limitations prescribed in the permit if required.
    • Camping may not exceed three weeks from the beginning to the end of the camping stay.
    • Owner contact information or a TWRA ID number and date of arrival must be displayed on a camper, tent, vehicle, or similar item at all times.
    • Where overnight camping is allowed, firearms and archery equipment must remain in camp except during legal hunting hours.

    maximum camping stay: <= 3 weeks

    “May be permitted in designated areas by permission from the area manager, park ranger, lake manager, park superintendent, or national forest supervisor. Such camping is subject to the limitations prescribed in the permit if required.”
    One more reviewed finding on this topic
    • Limited — Camping and use of trailers or other camper units in Tennessee state forests administered by the Tennessee Department of Agriculture, Division of Forestry.
      “Camping and the use of trailers or other camper units are allowed only at designated locations. The district forester will issue written permits to persons to camp in backcountry or other isolated sections of a forest area.”
  • Tiny homesAllowed (with conditions)

    Preassembled permanent tiny homes delivered to a homeowner as a completed unit, including a tiny home built off-site on a chassis or installed on a permanent foundation.

    • The State Fire Marshal’s Office says its inspection program allows construction, inspection, and permanent consumer use of tiny homes and similar structures.
    • The program inspection is described as similar to inspections of a site-built home and provides a decal reflecting compliance with adopted statewide building and electrical codes.
    • State residential-code regulations apply to new construction; additions over 30 square feet have been covered since October 1, 2011.
    • A state residential building permit is not zoning approval and does not authorize violation of a local ordinance; local zoning or other local requirements may independently control placement or occupancy.
    • If a subsurface sewage system will serve the residence, a conventional septic-system permit is required for installation of a conventional system or approved substitute product; an alternative-system permit is required for installation of an alternative system.
    • If a water well is drilled or a well pump or water-treatment device is installed, the work must be performed by a licensed person.

    addition area triggering state residential-code regulation: > 30 square feet (Applies to additions beginning October 1, 2011.)

    “The new tiny home inspection program was developed to allow for the construction, inspection and use of tiny homes and similar structures for permanent use by consumers.”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Permanent residential use of completed tiny homes in Tennessee, including Morgan County, through the State Fire Marshal’s Office Modular Building or Commissioner’s Inspection Program.
      “These tiny homes delivered to the homeowner as a completed unit are now allowed to be inspected through the SFMO’s Modular Building Program regardless of where constructed or delivered in Tennessee. [...] The new tiny home inspection program was developed to allow for the construction, inspection and use of tiny homes and similar structures for permanent use by consumers.”
  • Manufactured homesLimited

    HUD-labeled manufactured homes installed in Tennessee under the state manufactured-housing program.

    • Manufactured homes must be installed by licensed installers and have an installation decal applied after setup.
    • A state residential building permit is not required merely to place a manufactured or modular home in the state program, but a Manufactured/Modular Site Work Permit is required for a custom addition, site-built deck, porch, or stoop next to the home.
    • A state residential building permit is not zoning approval and does not authorize violation of a local ordinance; local zoning or other local requirements may independently control siting or occupancy.
    • If a subsurface sewage system will serve the residence, state septic-system permitting applies.
    “Ensure your application is approved and your license is active prior to installing any manufactured home in the state of Tennessee”
  • Who permits septicMixed (with conditions)

    Tennessee subsurface sewage disposal system construction permitting and related SSDS administration statewide.

    • The Tennessee Division of Water Resources administers SSDS permitting in non-contract counties.
    • Permit packages and Certificate of Completion packages for sites in contract counties are submitted directly to the contract county.
    • The listed contract counties are Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby, and Williamson.
    • Installer permits are valid statewide, but contract counties may require an additional permit.
    “Permit packages and Certificate of Completion Packages for sites located in the contract counties listed below should be submitted directly to the contract county.”
    2 more reviewed findings on this topic
    • State — Subsurface sewage disposal systems serving properties in Morgan County under Tennessee's SSDS program.
      “Counties Served [...] Morgan [...] Division of Water Resources [...] Septic Related Services”
    • Mixed (with conditions) — Statewide subsurface sewage disposal system permitting and assistance, with specified contract counties providing ground water protection services in their own areas.
      “NOTE: Some counties provide ground water protection services for their own areas. The online application form is not to be submitted for services requested in the following metropolitan or contact counties: Blount County, Davidson County/Nashville, Hamilton County, Jefferson County, Knox County, Madison County, Sevier County, Shelby County, Williamson County.”
  • Septic permitRequired

    Construction, installation, modification, or repair of residential, commercial, or industrial septic systems in Tennessee.

    • A permit is required before construction, modification, or repair.
    • A septic system permit should be obtained before starting dirt work or construction of any building, including the building pad.
    • Repair permits have no permit fee.
    • Alternative systems require an extra-high intensity soils map prepared by a Tennessee-licensed soils consultant.
    • Contract counties may require an additional permit.

    new conventional SSDS permit fee: 400 USD up to 1000 gallons per day design flow ($100 for each additional 1000 gpd flow) · new alternative SSDS permit fee: 500 USD up to 1000 gallons per day design flow ($150 for each additional 1000 gpd flow) · experimental SSDS permit fee: 500 USD · repair permit fee: 0 USD (Repair construction inspection fee is $100)

    “A septic system permit is required for the construction, modification or repair of a septic system. This permit ensures that the septic system design complies with state regulations and safeguards your health by properly managing wastewater.”
    One more reviewed finding on this topic
    • Required — Installation or repair of subsurface sewage disposal systems in Morgan County.
      “A Conventional Septic System Permit is required”
  • Septic inspectionRequired

    Installation of subsurface sewage disposal systems in Tennessee.

    • The installer must notify the Division when installation is complete.
    • A final inspection is scheduled before the system is covered.
    • TDEC inspects each SSDS installation for compliance with permit conditions and regulatory requirements.
    • Inspection fees vary by system type: $100 for new conventional or large-diameter graveless pipe systems, $200 for alternative systems, and $100 for repair construction inspections.

    new conventional construction inspection fee: 100 USD · alternative construction inspection fee: 200 USD · repair construction inspection fee: 100 USD

    “The applicant or SSDS installer must notify the Division when a system has been installed so that it can be inspected and approved.”
    One more reviewed finding on this topic
  • Off-grid sanitationLimited

    Construction, modification, or repair of an on-site subsurface sewage disposal (septic) system, including systems serving residential, commercial, and industrial properties in Tennessee.

    • A septic-system permit is required for construction, modification, or repair.
    • An applicant planning a new system, or repair or modification of an existing system, must apply for a permit.
    • A TDEC Environmental Scientist conducts a site evaluation and may request a detailed site plan or soils map from a private licensed soil consultant.
    • If a permit is issued, the applicant provides it to a licensed installer; after installation, the installer contacts the local Environmental Scientist for a final inspection before the system is covered.
    • A Certificate of Completion is issued if the installation is approved.
    “A septic system permit is required for the construction, modification or repair of a septic system.”
  • Well permitRequired

    Drilling a water well for production of water from underground sources in Tennessee.

    • Before drilling, the property owner or licensed well driller must submit a Notice of Intent to the Director in the Department-prescribed manner.
    • A driller must have documentation that the Notice of Intent was submitted to the Division of Water Resources before beginning operations at a drill site.
    • The Notice of Intent fee or a receipt must accompany the driller's report; no well or borehole may be drilled unless the driller has documentation that a Notice of Intent has been filed.
    • A Notice of Intent and fee are not required for well closure, deepening, or reworking of a water well or closed-loop geothermal borehole.
    • The Notice of Intent fee requirement does not apply in a qualifying local jurisdiction authorized to regulate well location and construction that has a Commissioner-approved inspection fee.
    • The Notice of Intent fee does not apply when the property owner filed a notice and paid the fee for the same property within the previous five years, provided the new notice identifies the first notice's identification number.
    • A Notice of Intent expires 180 days after its original filing date.

    Notice of Intent fee for water wells for production of water per property site: 75 USD (Not required for qualifying local jurisdictions or when the same property satisfies the five-year prior-notice exception.) · Notice of Intent expiration: 180 days

    “A Notice of Intent to drill a water well must be submitted by the property owner or the licensed well driller to the Director in the manner prescribed by the Department, prior to commencement of drilling a water well in Tennessee.”
  • Mandatory utility hookupConditional

    Connection of buildings to sanitary sewer systems where a qualifying Tennessee utility system has issued bonds payable for sewer services and the property abuts a street or public way containing a sanitary sewer.

    • The property must abut a street or other public way containing a sanitary sewer.
    • A building must exist on the lot or parcel for residential, commercial, or industrial use.
    • The utility system may require connection and cessation of other sewage-disposal methods.
    • For electrical service, written notification must show public sewer service, a septic permit application, or an existing septic system.
    “Utility systems within the State of Tennessee that have issued bonds payable for sewer services are granted authority in TCA § 7-35-201 (1) to "require the owner tenant or occupant of each lot or parcel of land that abuts upon a street or other public way containing a sanitary sewer and upon which lot or parcel a building exists for residential, commercial or industrial use, to connect the building with the sanitary sewer and to cease to use any other means for the disposal of sewage, sewage waste or other polluting matter."”
    2 more reviewed findings on this topic
    • Conditional — Electrical service for a new residence in Morgan County using public sewer or an existing or proposed septic system.
      “before the electrical inspector can process a request for electrical service”
    • Sewer (with conditions) — Residential, commercial, or industrial buildings on lots or parcels abutting a street or other public way containing a sanitary sewer, where the applicable Tennessee utility system has issued bonds payable for sewer services.
      “Utility systems within the State of Tennessee that have issued bonds payable for sewer services are granted authority in TCA § 7-35-201 (1) to "require the owner tenant or occupant of each lot or parcel of land that abuts upon a street or other public way containing a sanitary sewer and upon which lot or parcel a building exists for residential, commercial or industrial use, to connect the building with the sanitary sewer and to cease to use any other means for the disposal of sewage, sewage waste or other polluting matter."”
  • Agricultural exemptionConditional

    Buildings or structures on land used for agricultural purposes and subject to county zoning regulation in Tennessee.

    • The building or structure must be located on lands devoted to agricultural uses.
    • The building or structure must be incidental to the agricultural enterprise.
    • The exemption does not apply to agricultural lands adjacent or in proximity to state or federal-aid highways, public airports, or public parks.
    • The exemption does not apply to land located within the one-hundred-year flood plain.
    • The Attorney General opinion states that the provision applies to counties only and has no application to municipalities.
    • There is no blanket exemption for cotton gins, grain elevators, slaughterhouses, processing plants, or milk bottling plants; those structures qualify only when the statutory conditions are met.
    “it must be located on lands “devoted to agricultural uses;” and (2) it must be “incidental to the agricultural enterprise.””
  • Shed and accessory-building permit exemptionAvailable (with conditions)

    State residential building permits for detached garages, sheds, barns, and other detached structures that are not used for living purposes.

    • This is an exemption from the state residential building permit, not an exemption from all state or local requirements.
    • The State Residential Building Code Enforcement Program applies only in areas that have not received an SFMO exemption through local-code enforcement and have not opted out by a two-thirds vote of the city or county legislative body.
    • The exemption stated by the Department is limited to detached structures not used for living purposes; the opened official page does not state an accessory-structure size threshold.
    • The state residential building permit is not zoning approval and does not authorize violation of state law, regulation, or local ordinance.
    “A state residential building permit is not required for detached garages, sheds, barns or other detached structures that are not used for living purposes.”
  • Subdividing landRegulated (with conditions)

    Division of land in Morgan County into two or more lots, sites, or other divisions for immediate or future construction where a septic system is or will be used.

    • A subdivision evaluation is required when the tract or parcel is divided into two or more lots, sites, or other divisions for immediate or future construction where a septic system is or will be used.
    • A subdivision does not include division into two or more tracts or parcels when all are 5 acres or larger.
    • A survey and soils map must be submitted before the Division performs the evaluation.

    minimum parcel size exception: >= 5 acres (all resulting tracts or parcels)

    “A Subdivision Evaluation is required if you want to divide any tract or parcel of land into 2 or more lots, sites or other divisions for the purpose of immediate or future construction of houses, buildings, or other development where a septic system is or will be used.”
  • Building in a floodplainLimited

    Development in or near mapped floodplains throughout Tennessee, insofar as Tennessee's statewide floodplain-management guidance describes locally administered requirements.

    • Floodplain development requirements are managed locally by the community where the property is located.
    • Each NFIP-participating community has a local floodplain administrator who helps manage development in mapped flood hazard areas.
    • If the property is inside city limits, contact the city floodplain administrator; if outside city limits, contact the county floodplain administrator.
    • Local review may be required before development begins in a regulated floodplain.
    • Requirements vary by community and are based on the local floodplain management ordinance and flood zones mapped in that community.
    • Development activity that may require local review includes construction, repairs, substantial improvements, placement of fill, grading, excavation, manufactured homes, accessory structures, or other development activity.
    • Floodplain management ordinances are adopted, administered, and enforced by the local community, not by TEMA.

    local review before development in a regulated floodplain: may be required (Requirements vary by community and mapped flood zone.)

    “Floodplain development requirements are managed locally. Each community that participates in the National Flood Insurance Program has a local floodplain administrator who helps manage development in mapped flood hazard areas. [...] If the property is inside city limits, contact the city floodplain administrator. If the property is outside city limits, contact the county floodplain administrator. [...] Local review may be required before development begins in a regulated floodplain. Requirements vary by community and are based on the local floodplain management ordinance and flood zones mapped in that community.”
  • Permit feesPublished (with conditions)

    Tennessee SSDS permits and construction inspections applicable to Morgan County.

    • Fees vary by system type and design flow.
    • Repair permits have no permit fee but repair construction inspection has a $100 fee.

    new conventional or large diameter graveless pipe SSDS permit: 400 USD up to 1000 gallons per day design flow ($100 for each additional 1000 gpd flow) · new conventional SSDS construction inspection: 100 USD · new alternative SSDS permit: 500 USD up to 1000 gallons per day design flow ($150 for each additional 1000 gpd flow) · alternative SSDS construction inspection: 200 USD · experimental SSDS permit: 500 USD · repair permit: No permit fee USD · repair construction inspection: 100 USD

    “New Conventional or Large Diameter Graveless Pipe SSDS Permit | $400”
    One more reviewed finding on this topic
    • Published (with conditions) — Residential building permits administered by Tennessee's State Residential Building Code Enforcement Program for one- and two-family dwellings and townhouses where the state program applies.
      “$0 to $5,000 | $100 | $100 | $100 $5,001 to $100,000 | $350 | $100 | $100”
  • Permit processPublished (with conditions)

    Residential permit purchase and inspection process under Tennessee's State Residential Building Code Enforcement Program.

    • The state program applies to one- and two-family dwellings and townhouses only in areas without the stated local-code exemption or opt-out.
    • A first-time CORE user must register for an account.
    • A building permit must be purchased online or at a local Issue Agent.
    • Inspections cover the foundation before pouring, framing/rough-in construction, and final construction.
    • One free re-inspection is available; each additional re-inspection requires an additional fee.
    • A homeowner may build a home only if it will be the homeowner's residence, not sold or leased, and the homeowner has not received a homeowner building permit during the preceding 24 months.
    • Detached garages, sheds, barns, and other detached structures not used for living purposes do not require a state residential building permit.
    • A permit is not required for installation of a manufactured or modular home, but custom site work such as a deck, patio, or stoop requires a permit.

    effective date for permit requirement for additions over 30 square feet: 2011-10-01 (Applies to additions to existing homes.) · free re-inspections per project: 1 inspection (Available if a required inspection is not passed the first time.)

    “A building permit must be purchased online or at a local Issue Agent. The cost of the building permit is based on the estimated cost”
    One more reviewed finding on this topic
    • Published (with conditions) — Tennessee SSDS permit processing applicable to Morgan County.
      “The review process generally takes 10 days and must be completed within 45 days”
  • county zoning authorityGeneral

    County legislative bodies adopting zoning regulations for portions of Tennessee counties outside municipal corporations.

    • The authority is exercised under the conditions and procedures in Tennessee Code Annotated §§ 13-7-101 through 13-7-119.
    • The grant applies to portions of counties outside municipal corporations.
    • County zoning authority does not authorize county building permits or regulation of buildings or structures on agricultural land when the building or structure is incidental to the agricultural enterprise, except on agricultural lands adjacent or in proximity to state federal-aid highways, public airports or public parks.
    • The agricultural-land limitation applies to counties only and has no application to municipalities.
    “Under Tenn. Code Ann. § 13-7-101, et seq., the General Assembly has expressly delegated the authority to county legislative bodies to enact zoning regulations and create a board of zoning appeals.”

Inside cities and towns in Morgan County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Local zoningPresent (with conditions)

    New construction projects and land-use changes within the City of Wartburg, Morgan County, Tennessee.

    • The official page identifies the City of Wartburg Development Services as assisting with planning, permitting, and zoning; it does not publish the underlying zoning ordinance or dimensional schedules.
    “The City of Wartburg Development Services plays a crucial role in guiding the town's growth and development in a sustainable and responsible manner. They assist with planning, permitting, and zoning, ensuring that new construction projects and land-use changes align with the community's vision and regulations.”
    One more reviewed finding on this topic
    • Present (with conditions) — Planning, permitting, and zoning within the City of Wartburg, Morgan County, Tennessee.
      “Wartburg Development Services assists with planning, permitting, and zoning, promoting sustainable growth and preserving community resources and quality of life.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Zoning districts — Published zoning districts in Morgan County.
  • Minimum dwelling size — Minimum dwelling-size requirements in Morgan County, Tennessee.
  • Minimum lot size — Minimum lot size in Morgan County.
  • Setbacks — Building and land-use setbacks in Morgan County, Tennessee.
  • Lot coverage — Lot coverage in Morgan County.
4 more unanswered
  • Building height
  • Living in an RV
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Morgan County, Tennessee

Is Morgan County a good place to live off-grid or homestead?

Morgan County scores 75/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and mixed durability signals.

How much does land cost in Morgan County, Tennessee?

Land in Morgan County runs about $4,274 per acre, based on the latest county data.

What is the water situation in Morgan County?

Morgan County gets about 57.9" of rain a year, with severe drought in roughly 3.9% of years.

How remote is Morgan County?

A representative private-land location has about 16,583 people within a 30-minute drive and 2,500,206 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Morgan compares in Tennessee