Unincorporated Humphreys County, Tennessee does not require a residential permit under the State Residential Building Code Enforcement Program because the county opted out; unrelated local permits may still apply1. Subdivision review, floodplain development and septic work each have separate approvals234. County zoning remains unconfirmed, while McEwen and Waverly administer municipal zoning567.
At a glance
- Building permit
- Not required under the state residential program in unincorporated areas; unrelated local permits may still apply1
- Zoning
- County zoning is unconfirmed for unincorporated areas; McEwen and Waverly have municipal zoning567
- Septic permits
- Tennessee Department of Environment and Conservation (TDEC), Nashville Environmental Field Office48
- Owner-builder
- One permit every two years to build your own home, but this is a state licensing exemption, not a county building-permit requirement here910
- Subdivision (plat) review
- Required by the county Planning Commission for splitting land, outside the Waverly and New Johnsonville planning regions and McEwen city limits211
- Floodplain permit
- Required before construction, fill or grading near a mapped flood zone, from the County Executive's Office312
- Setbacks (unzoned areas)
- 40 ft from arterial streets, 30 ft from collector/minor streets, 15 ft side and rear, under the county's subdivision regulations13
- Agricultural buildings
- Exempt from county zoning regulation if incidental to the agricultural enterprise, away from highways, airports and floodplains14
Who to call
Planning & zoning
Humphreys County Planning Commission
Subdivision plat review and approval for Humphreys County, outside the Waverly and New Johnsonville planning regions and McEwen city limits
Room 1, Rawlings Building, 102 Thompson Street, Waverly, TN 37185
Floodplain permits
Humphreys County Executive's Office
Floodplain determinations and permits for construction, fill or grading near a mapped flood zone under the National Flood Insurance Program
102 Thompson Street, Waverly, TN 37185
Septic permits
Tennessee Department of Environment and Conservation (TDEC), Nashville Environmental Field Office
Septic System Construction Permits and related Division of Water Resources services for Humphreys County
711 R.S. Gass Blvd, Nashville, TN 37216
Contact details are copied from each office’s official page and were checked against it on September 28, 2026.
Do you need a building permit in Humphreys County, Tennessee?
No state-program residential building permit is required for a one- or two-family home or townhouse in unincorporated Humphreys County because the county is listed as OPT OUT; this answer does not rule out unrelated local permits1. The state table separately lists New Johnsonville as OPT OUT and McEwen and Waverly as EXEMPT, but those labels do not resolve separate municipal codes15. An owner in an opt-out jurisdiction may request a State Fire Marshal inspection during construction, and a qualifying home can receive a state Certificate of Occupancy1617. Tennessee's owner-builder rule also allows a property owner one permit every two years for a personal home that is not for sale, lease or rent, subject to its contractor-licensing conditions10. Floodplain, septic and subdivision approvals remain separate from the residential program342.
Who handles land-use permits in Humphreys County, and how do you reach them?
For a land split in the county planning jurisdiction, start with the Humphreys County Planning Commission in Room 1 of the Rawlings Building, 102 Thompson Street, Waverly, TN 37185, at (931) 296-779511. The commission meets on the fourth Monday of each month, except December, and plat submissions are due three Fridays before the scheduled meeting11. For construction, fill or grading near a flood zone, contact the Humphreys County Executive's Office at the same street address and phone number before work begins12. TDEC, rather than county government, administers septic permitting through the Nashville Environmental Field Office at 711 R.S. Gass Blvd, Nashville, TN 37216, phone (615) 687-700048. We could not confirm a county building or zoning office for unincorporated parcels, so ask the Planning Commission which county contact applies to a specific project511.
Does Humphreys County have zoning?
County zoning for unincorporated Humphreys County remains unconfirmed, not a settled no5. Municipal parcels are different: McEwen administers its own zoning ordinance and official zoning map, while Waverly answers land-use questions from its current zoning map and each property's classification67. Outside the Waverly and New Johnsonville planning regions and McEwen city limits, the county's Subdivision Regulations govern land division2. In unzoned areas or areas without designated setbacks within that jurisdiction, the regulations set building setbacks of 40 feet from arterial-street rights-of-way, 30 feet from collector or minor-street rights-of-way, and 15 feet at side and rear lot lines13. Tennessee law allows counties to adopt zoning outside municipalities, so the Planning Commission should confirm the status for a specific unincorporated parcel1811. Agricultural buildings qualify for a county-zoning exemption only when the land is devoted to agriculture and the structure is incidental to that enterprise, with exceptions near specified public facilities and in the one-hundred-year floodplain14.
How do septic permits work in Humphreys County?
TDEC's Division of Water Resources, rather than Humphreys County, administers septic permits for construction, modification and repair419. TDEC's Nashville Environmental Field Office serves Humphreys County and can be reached at (615) 687-70008. Obtain the septic permit before dirt work or construction of the building pad; a complete application may take up to 45 days to process20. A conventional permit costs $400 for up to 1,000 gallons per day of design flow, with $100 for each additional 1,000 gallons per day21. After installation, the installer must arrange the final inspection before covering the system, and TDEC issues the Certificate of Completion after approval22. Only 0.9% of Humphreys County soils are rated without severe limitations for a conventional drain field, so a site evaluation may point toward an alternative design23. A septic-served land division needs a subdivision evaluation unless every resulting parcel is at least 5 acres21. Before an electrical inspector processes service for a proposed house, written proof must show public sewer service, a septic application or an existing septic system24. We could not confirm whether a private well requires its own property-owner permit; ask TDEC's Division of Water Resources8.
Can you live in an RV or tiny home on your land in Humphreys County?
We could not confirm a rule for long-term RV occupancy, temporary camping, tiny-home occupancy or manufactured-home placement on private land in unincorporated Humphreys County. Those gaps are not permission or a ban, and the unresolved county-zoning question makes parcel-level confirmation especially important5. Ask the Humphreys County Planning Commission what applies at the address before buying a unit or preparing a site11. Inside McEwen or Waverly, contact the relevant city because both municipalities administer zoning, and a city's rules do not answer the question for unincorporated land67. The county's state-program opt-out addresses residential building permits for one- and two-family dwellings and townhouses; it does not establish RV, tiny-home or manufactured-home occupancy rights1. Electrical service for a proposed house also requires written proof of public sewer service, a septic application or an existing septic system before the inspector processes the request24.
What are the steps to build a home in Humphreys County?
<ol><li>Ask the Planning Commission whether county zoning or another land-use rule applies to the parcel and proposed use511.</li><li>If you are splitting land, complete subdivision plat review; minor subdivisions of 1-3 lots cost $250, while major subdivisions cost $400 plus $25 per lot252.</li><li>Ask the County Executive's Office whether the work is near a flood zone, because construction, fill and grading there require a county permit before work starts123.</li><li>Apply through TDEC before septic work, dirt work or building-pad construction; a complete application may take up to 45 days820.</li><li>Confirm that no unrelated local permit applies; the county's opt-out removes the state-program residential permit for covered homes in unincorporated Humphreys County1.</li><li>If desired, request the optional State Fire Marshal inspection path toward a state Certificate of Occupancy1617.</li><li>Arrange the septic final inspection before covering the system, then prepare the required sewer or septic proof for electrical service2224.</li></ol>
What should you check before buying land in Humphreys County?
Soils are the biggest catch here: only 0.9% of Humphreys County's land is free of severe limitations for a conventional septic drain field, so assume a standard system won't work on most parcels and budget for a site evaluation and likely an engineered system before you commit23. Terrain is more forgiving, with 48.6% of the county at 15% slope or less, so check the specific parcel's grade rather than assuming easy building on hillier ground26. The county gets 53.7 inches of rain a year with severe drought in only 4.9% of years, and 76.5% of the land is wooded, which matters for clearing and access costs272829. Ask the Planning Commission directly whether zoning applies to your parcel and confirm flood-zone status with the County Executive's Office before you close, since neither is settled countywide and both affect what you can build1112. If your driveway will connect to a state highway, Tennessee requires a TDOT entrance permit before construction, on top of anything the county requires30. Typical property tax in the county runs about a 0.5% effective rate, with a median bill near $895 a year, against a typical home value around $258,996313233.
Watch-outs
- Humphreys County's building-code opt-out and the absence of a confirmed zoning ordinance can look like "no rules," but subdivision review, floodplain permits and state septic permitting all still apply — confirm each with the Planning Commission, County Executive's Office and TDEC before you build3434.
- RV, tiny-home, temporary-camping and manufactured-home occupancy on private land are open questions with no official Humphreys County or Tennessee source confirming or prohibiting them — call the Planning Commission before you plan around any assumption11.
- McEwen and Waverly administer municipal zoning, so do not apply the unresolved unincorporated-county zoning answer to property inside either city67.
Sources
- Residential Jurisdictions & Inspectors, quoted and re-checked
- Subdivision Regulations of Humphreys County, Tennessee, quoted and re-checked
- Public Notices & Meeting Calendar, quoted and re-checked
- TDEC - Subsurface Sewage Disposal Systems (SSDS) (2026 county census)
- (2026 county census)
- Planning and Zoning – City of McEwen Tennessee, quoted and re-checked
- Frequently Asked Questions – City of Waverly, quoted and re-checked
- Tennessee Department of Environment and Conservation (TDEC), Nashville Environmental Field Office (tn.gov)
- Residential Jurisdictions & Inspectors (2026 county census)
- Can I build my own home without a license?, quoted and re-checked
- Humphreys County Planning Commission (humphreyscountytn.gov)
- Humphreys County Executive's Office (humphreyscountytn.gov)
- Subdivision Regulations of Humphreys County, Tennessee, quoted and re-checked
- Exemption from County Zoning Regulation for Buildings on Land Used for Agriculture, quoted and re-checked
- Residential Jurisdictions & Inspectors, quoted and re-checked
- Residential Jurisdictions & Inspectors, quoted and re-checked
- Residential Jurisdictions & Inspectors, quoted and re-checked
- Tennessee Attorney General Opinion No. 10-108 (Tennessee statewide rule), quoted and re-checked
- Subsurface Sewage Disposal System (SSDS) Frequently Asked Questions, quoted and re-checked
- Subsurface Sewage Disposal System (SSDS) Frequently Asked Questions, quoted and re-checked
- Septic System Construction Permit, quoted and re-checked
- Subsurface Sewage Disposal System (SSDS) Frequently Asked Questions, quoted and re-checked
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Online Application for Septic Related Services, quoted and re-checked
- Planning Commission, quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Annual precipitation: Bolthole Index county data
- Share of years in severe drought: Bolthole Index county data
- Wooded share of land: Bolthole Index county data
- Highway Entrance Permits (Tennessee statewide rule), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
- Residential Jurisdictions & Inspectors, quoted and re-checked
Written September 28, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.