Humphreys County, Tennessee
McEwen is a city in Humphreys County, Tennessee. McEwen adopts its own zoning, so inside its limits McEwen’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Humphreys County page.
Excavation, construction, movement, alteration, repair, change of use, or land filling inside McEwen city limits.
permit validity if work not commenced: 6 months · permit invalidity after work suspension or discontinuance: 1 years
“It shall be unlawful to commence the excavation for or the construction of any building or other structure, including accessory structures, to commence the moving, alteration, or repair of any structure, or to change the use of a building or structure, or to commence the filling of land without a permit therefore, issued by the Building Inspector/Zoning Administrator.”
Buildings or premises requiring a certificate of occupancy under McEwen's zoning ordinance.
final-inspection timing after notice of readiness: <= 3 days
“Within three (3) days after notification that a building or premises or part thereof is ready for occupancy of use, it shall be the duty of the Building Inspector/Zoning Administrator to make a final inspection thereof”
A land, building, structure, or part thereof inside McEwen that is erected, moved, or altered in use.
“No land or building or other structure or part thereof hereafter erected, moved, or altered in its use shall be used until the Building Inspector/Zoning Administrator shall have issued a Certificate of Occupancy stating that such land, structure, or part thereof is found to be in conformity with the provisions of this ordinance.”
Land inside McEwen city limits.
“This Ordinance shall be known as the Zoning Ordinance for the City of McEwen, Tennessee. The zoning map shall be referred to as the official zoning map of McEwen, Tennessee and all explanatory matter thereon is hereby adopted and made a part of this ordinance.”
Zoning districts inside McEwen city limits.
number of zoning districts: 6
“All territory which may hereafter be annexed to the City of McEwen shall be zoned "Low-Density Residential, R-1." Such annexed territory shall retain such zoning classification until such time as the necessary studies are made by the Planning Commission and the Official Zoning Map is amended in the manner provided. 5.050. Specific district regulations. The following regulations shall apply in the six (6) zoning districts established in Section 5.010 of this ordinance.”
A mobile home or travel trailer temporarily occupied on private residential property inside McEwen city limits.
initial temporary occupancy period: 2 weeks · maximum occupancy in any 90-day period: <= 4 weeks
“Out-of-town visitors of McEwen residents and similar parties desiring to locate a mobile home or travel trailer, for temporary occupancy during visitation, on private residential property within the city, must first obtain a permit therefor from the building inspector. Such permit shall be issued for a temporary occupancy period of two (2) weeks and may be renewed for only two (2) additional weeks in any ninety (90) day period, it being the intent that no mobile home or travel trailer shall be permitted for more than four (4) consecutive weeks or for more than four (4) weeks in any ninety (90) day period.”
All subdivisions located within McEwen city limits.
plat approval or disapproval period: <= 30 days
“These subdivision regulations shall apply to all subdivisions, as herein defined, located within the McEwen city limits. No land shall be subdivided within the jurisdictional area until the subdivider submits a plat as required by these regulations, obtains planning commission approval of the plat, and files the approved plat with the county register.”
Vehicle access points to streets inside McEwen city limits.
maximum residential access-point width: <= 30 feet · minimum ditch-line culvert: >= 18 inches
“A point of access for vehicles onto a street shall not exceed thirty (30) feet in width for all residential, retail, and commercial service land uses. All points of access shall be so constructed as to provide for proper drainage of property and public street. A minimum of an eighteen (18) inch culvert shall be provided in the ditch line. For industrial land uses a point of access for vehicles onto a street shall not exceed forty-five (45) feet in width.”
Municipal building permits inside McEwen city limits.
“The McEwen Board of Mayor and Aldermen shall establish a schedule of fees and a collection procedure for Building Permits. The schedule of fees shall be posted in the office of the Building Inspector/Zoning Administrator and City Hall.”
Municipal building-permit applications inside McEwen city limits.
“Application for a Building Permit shall be made in writing to the Building Inspector/Zoning Administrator on forms provided for that purpose. All applications for Building Permits shall be accompanied by a plan or a plat in duplicate, drawn to scale”
McEwen does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
R-1 Low-Density Residential District inside McEwen.
minimum lot area without public sewer: >= 40000 square feet · minimum lot area with public sewer: >= 20000 square feet
“E. Dimensional Regulations: All uses permitted in the R-1, Low-Density Residential District shall comply with the following requirements except as provided in Article VII. 1. Minimum Lot Size: Without Public Sewer (in sq. ft.) With Public Sewer (in sq. ft.) Area 40,000 20,000”
R-1 Low-Density Residential District inside McEwen.
front setback: >= 40 feet · side setback: >= 15 feet · rear setback: >= 25 feet
“2. Minimum Yard Requirements: Front Setback 40 feet Side 15 feet Rear 25 feet”
R-1 Low-Density Residential District inside McEwen.
maximum lot coverage: <= 35 percent
“3. Maximum Lot Coverage: On any lot or parcel of land, the area occupied by all buildings including accessory buildings may not exceed thirty-five (35) percent of the total area of such lot or parcel.”
R-1 Low-Density Residential District inside McEwen.
maximum building height: <= 35 feet (Article VII, § 7.050)
“4. Height Requirement: No building shall exceed thirty-five (35) feet in height, except as provided in Article VII, Section 7.050.”
Mobile homes and mobile-home parks in McEwen R-1 Low-Density Residential District.
“D. Uses Prohibited: Mobile Homes and mobile home parks; billboards and similar advertising structures; uses not specifically permitted; or uses not permitted upon approval as a special exception.”
We looked and could not find an official answer yet. Silence is not permission; ask McEwen or Humphreys County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that McEwen publishes no rule on the point, not that none exists. Humphreys County’s page lists the county offices to call.