Genesee County, New York

Building permits, zoning and septic rules in Genesee County, New York

52Index Score / 100
#43 of 62 in New York

Genesee County, New York requires a building permit for work covered by the state Uniform Code, but the city, town or village where the property lies issues that permit and conducts building inspections1,2,3. Zoning is also local, while the county Environmental Health Division issues residential septic construction permits throughout Genesee County4,5.

Do you need a building permit in Genesee County, New York?

Yes.

Yes. The current New York State Uniform Code took effect on December 31, 2025, and applies statewide outside New York City2,8. A building permit is required for work that must conform to the Uniform Code or Energy Code, although each local enforcement program may keep or omit the state's listed exceptions1. Genesee County does not issue one countywide building permit: the Code Enforcement Officer for the city, town or village containing the parcel handles the building-permit decision and local fee schedule3. Zoning approval is separate and also local, while a residential septic construction permit stays with Genesee County Environmental Health4,5.

Who issues building permits in Genesee County, and how do you reach them?

Contact the Code Enforcement Officer for the city, town or village where the Genesee County parcel lies.

Contact the Code Enforcement Officer for the city, town or village where the Genesee County parcel lies3. A building-permit application must give the local code official enough information to determine compliance, including the location, scope, tax-map number, street address, occupancy classification and acceptable construction documents1. As an example only, the City of Batavia Bureau of Inspection handles building permits, building inspections and zoning enforcement inside the city, at One Batavia City Centre, Batavia, NY 14020, 585-345-63459. Do not use that city office for land elsewhere in Genesee County. County Environmental Health still handles residential septic construction permits for addresses throughout Genesee County5. Permit holders must notify the local authority when work is ready and keep it accessible until accepted2.

Does Genesee County have zoning?

Genesee County does not adopt county-level zoning; towns and villages exercise zoning, and the County Planning Board reviews certain local planning actions referred under state law.

Genesee County does not adopt county-level zoning; towns and villages exercise zoning, and the County Planning Board reviews certain local planning actions referred under state law4. The City of Batavia also administers zoning inside the city9. Ask the city, town or village containing the parcel about zoning approval, the zoning district, allowed uses, setbacks, lot size, building height and subdivision review before relying on a purchase or site plan. Genesee County Planning provides municipal planning support and referral review, but it does not replace the municipality's zoning decision4. Septic construction permits remain countywide through Genesee County Environmental Health even when a municipality controls zoning5. The County Planning Board charges no referral-review fee, so verify any payment demand directly with the Planning Department4.

How do septic permits work in Genesee County?

The Genesee & Orleans County Health Departments' Environmental Health Division oversees septic design and permitting throughout Genesee County, including new systems, repairs and replacements.

The Genesee & Orleans County Health Departments' Environmental Health Division oversees septic design and permitting throughout Genesee County, including new systems, repairs and replacements7. A residential onsite wastewater treatment system requires a county septic construction permit, and the application must include a $175 check or money order payable to the Genesee County Health Department5. Environmental Health also performs septic inspections during property transfers7. Only about 12% of Genesee County soils are rated without severe limits for a conventional drain field, so arrange the site evaluation before committing to a house location or system budget10. This county role does not move to the city, town or village that issues the building permit or zoning approval3,4,5. Reach Environmental Health at (585) 344-2580 or health@geneseeny.gov7.

Can you live in an RV or tiny home on your land in Genesee County?

We could not confirm a countywide rule allowing long-term RV occupancy, temporary camping or tiny-home occupancy in Genesee County.

We could not confirm a countywide rule allowing long-term RV occupancy, temporary camping or tiny-home occupancy in Genesee County. Ask the city, town or village that controls the parcel about allowed uses, placement and occupancy before buying or moving a unit onto the land4. For work requiring a building permit, the local authority must inspect the completed work and issue a certificate of occupancy or compliance before occupancy; a use or occupancy-classification change also requires a certificate1. A person who will own and occupy a manufactured home may apply for installer certification, but homeowner-performed installation components must be supervised and certified by a certified installer6. That narrow installer path does not replace a municipal building permit, local zoning approval or a county septic construction permit3,4,5.

Building a home in Genesee County: the steps, in order

Identify the city, town or village containing the parcel and ask its Code Enforcement Officer about zoning approval, building-permit documents and local fees.

  1. Identify the city, town or village containing the parcel and ask its Code Enforcement Officer about zoning approval, building-permit documents and local fees3,4.
  2. Confirm the allowed use and dimensional rules, then determine which project work requires a building permit1.
  3. Contact County Environmental Health at (585) 344-2580 before fixing the house and septic locations7.
  4. Submit the local building-permit application with enough information for code review, and submit the separate county septic construction-permit application with its $175 payment1,5.
  5. Notify the municipality when work is ready and keep it accessible for required building inspections2.
  6. Obtain the municipality's certificate of occupancy or compliance before occupying completed permitted work2.

What to check before you buy land in Genesee County

Only about 12% of Genesee County soils are rated without severe limits for a conventional septic drain field, so obtain Environmental Health's site guidance before assuming a standard system will fit.

Only about 12% of Genesee County soils are rated without severe limits for a conventional septic drain field, so obtain Environmental Health's site guidance before assuming a standard system will fit7,10. Check public-water eligibility early: development inside a Smart Growth Development Area has access, Agricultural District land may face lateral restrictions, and new development outside the boundary is not automatically eligible for a hookup but can receive case-by-case review11. Agricultural District enrollment can provide protection from nuisance claims and certain local regulations, but it does not create a blanket building-permit exemption12. Ask the municipality about zoning approval; we could not confirm countywide driveway-access or floodplain-development permit rules, so also ask which road authority and floodplain official cover the parcel4. The median property-tax bill is about $3,958 per year, with an effective rate near 2.5%10.

Watch-outs

  • Genesee County warns that scammers have emailed Planning Board applicants demanding review or approval fees; the county does not charge for Planning Board referrals, so confirm any demand with the Planning Department at (585) 815-79014.
  • Building permits, building inspections and zoning approval depend on the city, town or village, but residential septic construction permits remain with Genesee County Environmental Health3,4,5.
  • Only about 12% of Genesee County's soils are rated without severe limits for a conventional septic drain field; budget for a site evaluation and a possible engineered system before you count on a standard drain field7,10.

Sources

12 official pages, each quoted and re-checked · written October 10, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Unlike 4 of its 6 neighbors, Genesee County has no countywide zoning.

RuleGenesee CountyOrleans CountyWyoming CountyMonroe CountyLivingston CountyErie CountyNiagara County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningNoYesYesNoNoYesYes
Septic permitsCounty Health Dept.County Health Dept.County Health Dept.County Dept. of Public HealthCounty Dept. of HealthCounty Dept. of HealthCounty Dept. of Health

County locator

Genesee County in New York

52
County map
Genesee County highlighted among the New York counties · colored by Index score

How Genesee County scores

52 / 100 · #43 of 62 in New York · six factors, land price, tax, rain and climate

Seclusion22100% ev.
Self-Sufficiency69100% ev.
Admin Boringness5690% ev.
Durability82100% ev.
Property Autonomy33100% ev.
Carry Cost68100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$230kTypical home
2.5%Property tax
$4,099Land / acre
36.9"Annual rain
2.4% of yrsSevere drought
0.7 / yr (+0.7)Mid-century 100°F days
9 daysMid-century dry spell
1.44" (+8.9%)Mid-century 1-day rain
1.69×Wildfire change factor
100%Forward climate coverage
$935Home insurance / yr
1.6% / yrInsurance growth
0.43%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
220,210People within 30 min
3,217,371People within 2 hr
83,820Radius comparison (15 mi)
116.7People / sq mi
2%Federal land
97.3%Land at 15% slope or less
12%Soils rated "not limited" for septic (strict USDA rating)
37,153 acWorkable land screen
41.4%Wooded land
59.5 tonsBiomass / forest ac
47.6°FAvg temp

Scout Genesee County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Genesee County. Listing sites control their own results and filters.

Sell land in Genesee County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Genesee County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet covered: Town of Alabama · Village of Alexander · Batavia · Village of Corfu · Village of Elba · Town of Oakfield

Answers from the rulebook for Genesee County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Genesee County rules

  • Local zoningVaries (with conditions)

    Countywide aggregate of local municipal zoning; this is not a finding that Genesee County itself administers each local ordinance.

    • The County directs an applicant to contact the municipality where the business will operate to determine whether local zoning approval is required.
    • Home-based businesses should check applicable local zoning requirements.
    • The County Planning Department assists local municipalities with zoning-law and ordinance revisions.
    “Contact the municipality where your business will operate to determine whether local permits, licenses or zoning approvals are required. Home-based businesses should also check applicable local zoning requirements.”
  • Who permits septicCounty

    Private water and residential onsite wastewater treatment systems in Genesee County.

    • The county Environmental Health division operates within the Genesee and Orleans County Health Department structure and follows local and New York State sanitary codes.
    “Environmental Health oversees the design and permitting of onsite wastewater treatment systems (septic systems).”
  • Septic permitRequired

    Residential onsite wastewater treatment system construction in Genesee County.

    • The application is made under Chapter II of the Genesee County Sanitary Code.
    • The application is for installation of a residential onsite wastewater treatment system.
    • A check or money order payable to the Genesee County Health Department in the amount of $175.00 must accompany the application under Chapter V Fees of the Genesee County Sanitary Code.

    application fee: 175 USD (check or money order payable to the Genesee County Health Department)

    “Under the provisions of Chapter II of the Genesee County Sanitary Code, application is hereby made for a Construction Permit to install a Residential Onsite Wastewater Treatment System to serve the hereinafter described property, concerning which the following information is submitted.”
  • Septic inspectionLimited

    Residential onsite wastewater systems in Genesee County, specifically inspections during property transfers.

    • The official page identifies inspections during property transfers but does not state a general periodic inspection requirement.
    “They assist homeowners with permits for new installations, repairs, and replacements, as well as inspections during property transfers.”
  • Mandatory utility hookupWater (with conditions)

    County water-system hookups in Genesee County Smart Growth Development Areas and developments outside those areas.

    • Water access is available to existing and new development within Smart Growth Development Areas.
    • New development on land enrolled in an Agricultural District may be restricted by lateral restrictions established during formation of certain water districts.
    • Development outside the Smart Growth Development Area boundary is not automatically eligible and requires case-by-case administrative review.
    • The source addresses water-system access and does not establish countywide sewer-connection requirements.
    “New developments outside of the Smart Growth Development Area boundary are not automatically eligible for water system hook-up.”
    One more reviewed finding on this topic
    • Water (with conditions) — County water-system hookups for existing and new development in Genesee County.
      “Water access is available to existing and new development located within Smart Growth Development Areas (see town maps below), but new development on land enrolled in an Agricultural District may be restricted due to lateral restrictions established during the formation of certain water districts. New developments outside of the Smart Growth Development Area boundary are not automatically eligible for water system hook-up. However, the County has established an administrative review process for case-by-case evaluations.”
  • Agricultural exemptionConditional

    Parcels enrolled or proposed for enrollment in Genesee County agricultural districts.

    • Participation is voluntary and free.
    • Eligible land must be primarily viable agricultural land, defined by the county page as at least 51% prime farmland soils or contiguous to the main farm operation.
    • Submitting an application does not guarantee enrollment or qualification for a reduced agricultural property-tax assessment.
    • The stated protections include relief from nuisance claims and certain local regulations, not a blanket exemption from all permits or codes.

    minimum prime farmland soil share: >= 51 percent (eligibility may alternatively be based on contiguity to the main farm operation)

    “This law allows landowners to propose agricultural districts, which provide protections such as relief from nuisance claims and certain local regulations.”
  • Permit feesPublished

    Genesee County Environmental Health fees for private sewage and water services.

    • The fee schedule is dated 12/18/2024.
    • The schedule lists fees for well construction permits, soil percolation tests, septic construction permits, septic permit renewals, septic tank replacement or upgrades, and system evaluations.

    well construction permit: 25 USD · soil percolation test - site evaluation: 250 USD · additional percolation test: 100 USD · permit to construct septic system: 175 USD (includes final inspection) · septic permit renewal: 50 USD (within 60 days of expiration; same applicant) · septic tank only replacement or upgrade: 75 USD

    “PRIVATE SEWAGE / WATER: Well Construction Permit [...] Soil Percolation Test - Site Evaluation [...] Additional Perc Test [...] Permit to Construct Septic System (includes final inspection) [...] Septic Permit Renewal (within 60 days of expiration; same applicant) [...] Septic Tank Only (Replace/Upgrade)”
    One more reviewed finding on this topic
    • Variable (with conditions) — Environmental Health permits and plans in Genesee County.
      “There are fees associated with many of the services provided by the Environmental Health Division including, but not limited to, permits and plans for Campgrounds, Children’s Camps, Food Service Establishments, Indoor Tanning, Migrant Farmworker Housing, Mobile Home Parks, On-Site Wastewater Treatments Systems (OWTS), Public Water Supply, Swimming Pools & Bathing Beaches, Temporary Residences, etc.”
  • Permit processPartial

    Published construction-permit, residential OWTS-permit, and county planning-referral process materials applicable in Genesee County.

    • The New York State building-permit process requires an application containing sufficient information for code review and specifies minimum information and construction-document requirements.
    • The Genesee County residential OWTS application requires submission under Chapter II of the County Sanitary Code and payment of a $175 fee under Chapter V.
    • The county planning referral form addresses subdivision proposals and final-action consequences, but it does not provide a complete municipal subdivision application process.

    residential OWTS application fee: 175 USD (payable to Genesee County Health Department)

    “An authority having jurisdiction’s code enforcement program must provide for an application process that requests sufficient information to enable the code enforcement official to determine that the intended work meetsthe requirements of the Uniform Code and Energy Code.”
  • County-wide zoningAbsent

    Genesee County does not adopt county-level zoning; zoning is exercised by towns and villages, with the county Planning Board performing General Municipal Law Article 12-B (239-m) referral review only.

    Genesee County, New York - Planning ↗From the county’s own site, awaiting a second reviewer

New York rules that apply here

  • Building permitRequired

    Work that must conform to the New York State Uniform Code or Energy Code throughout New York State except New York City, where the city has its own construction code; local authorities having jurisdiction administer and enforce the state requirements within their boundaries.

    • A local authority having jurisdiction may expressly exempt one or more listed categories of work from the building-permit requirement.
    • Permitted exemption categories include one-story detached tool or storage sheds, playhouses, or similar structures associated with one- or two-family dwellings or townhouses not exceeding 144 square feet gross floor area; temporary sets and scenery; certain window awnings; partitions or movable cases less than 5 feet 9 inches high; painting, wallpapering, tiling, carpeting, or similar finish work; listed portable equipment or appliances; certain equipment replacements; and repairs that do not affect fire and life safety.
    • A permit exemption does not authorize work violating the Uniform Code or Energy Code.
    • Beginning December 31, 2025, regulated parties submitting building permit applications must comply with the 2025 NYS Uniform Code, subject to the stated transition option before that date.

    maximum gross floor area for listed detached accessory structures: <= 144 square feet (Only for one-story detached structures associated with one- or two-family dwellings or townhouses and used for tool/storage sheds, playhouses, or similar uses.) · height threshold for listed partitions or movable cases: < 5 feet 9 inches

    “Each authority having jurisdiction shall include in its code enforcement program provisions requiring building permits to be required for work that must conform to either or both of the Codes.”
    3 more reviewed findings on this topic
  • Owner-builder exemptionConditional

    Owner-performed home-improvement work at an owner’s primary residence in New York, as to a New York State home-improvement-contractor license.

    • New York State does not license home-improvement contractors.
    • A county or local municipality may license home-improvement contractors or particular home-improvement trades.
    • The Department of State identifies New York City; Suffolk, Nassau, Westchester, Putnam, and Rockland Counties; and the City of Buffalo as examples of local jurisdictions requiring a home-improvement-contractor license.
    • This finding concerns home-improvement-contractor licensing only; it does not establish an exemption from locally administered building permits, inspections, or licenses for particular trades.
    “Check your local government licensing requirements: New York State does not license home improvement contractors. However, some counties and local municipalities do, including New York City, Suffolk, Nassau, Westchester, Putnam, and Rockland counties, and the City of Buffalo.”
    2 more reviewed findings on this topic
    • Conditional — An owner who intends to own and occupy a manufactured home in Genesee County and seeks to perform installation work.
      ““A person who intends to own and occupy a manufactured home may apply for certification as the installer of such manufactured home” pursuant to the requirements contained within Part 1210.”
    • Conditional — A person intending to own and occupy a manufactured home in Genesee County.
      “19 NYCRR Part 1210 requires a certified installer to be on site while any manufactured home is being installed. “A person who intends to own and occupy a manufactured home may apply for certification as the installer of such manufactured home” pursuant to the requirements contained within Part 1210. Should a homeowner choose to complete a required component of the installation, that work shall be supervised and certified by an installer holding certification issued pursuant to part 1210.”
  • Building code adoptedAdopted

    The New York State Uniform Fire Prevention and Building Code for construction statewide outside New York City, including residential construction in towns and other local governments.

    • The Uniform Code took effect January 1, 1984.
    • New York City was permitted to retain its own code.
    • Cities, towns, and villages outside New York City do not need to adopt the Uniform Code affirmatively; it is automatically in effect.
    • A local government cannot exclude itself from all or any part of the Uniform Code.
    • Building permits must be required for work that must conform to the Uniform Code, subject to permitted exceptions.

    effective date: 1984-01-01

    “The Uniform Code is applicable in every part of the State (except the City of New York, which was permitted to retain its own code).”
    3 more reviewed findings on this topic
  • InspectionsRequired

    Construction work for which a building permit has been issued and which is subject to the Uniform Code or Energy Code, administered by the applicable local authority having jurisdiction throughout New York State except New York City.

    • Inspections may be performed in person or remotely when the authority determines the remote inspection can be performed to the same level and quality and provides sufficient information; otherwise an in-person inspection is required.
    • Where applicable, inspections include the worksite before permit issuance, footing and foundation, concrete slab preparation, framing, structural/electrical/plumbing/mechanical/fire-protection systems, fire-resistant construction and penetrations, heating appliances/chimneys/flues/gas vents, Energy Code compliance elements, manufactured buildings or homes, and a final inspection.
    • Permit work must remain accessible and exposed until inspected and accepted; the permit holder must notify the authority when work is ready for inspection.
    • The state minimum standards do not require regular periodic inspections of owner-occupied one- and two-family dwellings or agricultural buildings used directly and solely for agricultural purposes, but this does not limit inspections invited by the owner or required where conditions threaten or present a public-health, safety, or welfare hazard.

    maximum interval for periodic fire-safety and property-maintenance inspections of multiple dwellings and nonresidential occupancies: <= 3 years (This periodic-inspection interval does not apply as a requirement to owner-occupied one- and two-family dwellings or qualifying agricultural buildings.)

    “Each authority having jurisdiction shall include in its code enforcement program provisions requiring the authority having jurisdiction, or an individual or entity contracted by the authority having jurisdiction and satisfying the requirements set forth in section 1203.2 (e)(2), to perform construction inspections required by the Codes including those listed in this paragraph, either in-person or remotely.”
    4 more reviewed findings on this topic
  • Certificate of occupancyRequired

    Work subject to a building permit and the Uniform Code or Energy Code, and structures or portions converted from one use or occupancy classification or subclassification to another, throughout New York State except New York City.

    • Permission to use or occupy covered buildings or portions is granted only by issuance of a certificate of occupancy or certificate of compliance, except as provided for temporary certificates of occupancy.
    • Before issuance, the authority must inspect and determine compliance with applicable Codes and, where applicable, review structural-observation statements, special-inspection reports, flood-hazard certifications, Energy Code test results, and manufactured-building or manufactured-home seals, insignias, and data plates.
    • A temporary certificate may be issued before completion for a specified period and specified portions, subject to safe occupancy, operational fire and life-safety components, required means of egress, and completion of remaining work.

    temporary certificate period: specified period (The permit holder must undertake to bring the structure into full compliance with the Codes.)

    “The code enforcement program shall provide that, except as provided in section 1203.3 (d)(4), permission to use or occupy a building or structure, or portion thereof, for which a building permit was previously issued, or which has been converted from one use or occupancy classification or subclassification to another, shall be granted only by issuance of a certificate of occupancy or a certificate of compliance.”
    4 more reviewed findings on this topic
  • Zoning districtsPartial

    Publication and adoption of zoning districts by New York municipalities statewide; zoning is locally adopted and administered rather than administered by New York State as a single statewide zoning map.

    • Zoning districts are shown on each municipality’s zoning map.
    • A New York municipality has the choice whether to adopt zoning and, if adopted, how the zoning regulations will work in the community.
    • The source states that all New York cities have adopted zoning, while towns and villages may adopt zoning under the applicable enabling laws and local procedures.
    • District-specific zoning regulations and maps must therefore be obtained from the relevant city, town, or village.
    • The cited publication discusses local adoption procedures and does not publish a single statewide set of zoning districts.
    “Since New York is a home rule state, a municipality has the choice of whether or not to adopt zoning and if it does, how the zoning regulations will work in the community.”
    One more reviewed finding on this topic
    • Partial — New York cities, towns, and villages that enact local zoning laws and zoning districts
      “New York’s zoning enabling statutes (the state statutes which give cities, towns and villages the power to enact local zoning laws) require that zoning laws be adopted in accordance with a comprehensive plan.”
  • Manufactured homesLimited

    Installation, alteration, and repair of a manufactured home intended for dwelling use in New York.

    • The Uniform Code applies in every part of New York except New York City, which may retain its own code.
    • The Department of State FAQ states that a building permit is required for Uniform-Code work, including manufactured-home installation, alteration, and repair.
    • Except as provided by the Secretary's regulations, each local government administers and enforces the Uniform Code; if a local government does not enforce it, the statute specifies county or Secretary administration contingencies.
    • For matters the Uniform Code does not provide, Executive Law § 379 permits a municipality to adopt building regulations; local land-use approval therefore requires jurisdiction-specific research.
    “Homes installed after 1/1/06, either new or relocated (even within the same park or community), get a building permit and an installers warranty seal.”
    One more reviewed finding on this topic
    • Limited — Installation and occupancy of manufactured homes in New York
      “are permits and certificates of occupancy/compliance required for the installation of a manufactured home? yes. pursuant to 19 nycrr part 1203 a building permit "shall be required for [all] work which shall comply with the uniform code," including the installation”
  • Off-grid sanitationAllowed (with conditions)

    Use of an individual onsite wastewater treatment system where a municipal or communal wastewater system is unavailable.

    • The system must comply with statewide Appendix 75-A minimum standards.
    • Alternative systems require prior review and approval by the State or county health department official having jurisdiction.
    • Design must be prepared by or under the supervision of a design professional.
    “when a municipal or communal system is not available”
  • Well permitRequired

    New or additional wells withdrawing water from underground sources in Kings, Queens, Nassau, or Suffolk County when the installed pumping capacity exceeds 45 gallons per minute, singly, in the aggregate, or considering old and new wells on or for use on one property.

    • The rule applies to any purpose, including agricultural use.
    • A fire well with no permanently attached pumping equipment is excluded when installed by a municipal corporation, fire district, duly organized fire company, or fire department.
    • The Department may impose conditions, requirements, and limitations and may issue limited or revocable permits.
    • A new well permit may be valid for no more than 10 years from issuance; a renewed permit may be valid for a Department-specified period no longer than 10 years from reissuance or renewal.

    installed pumping capacity: > 45 gallons per minute (Applies to a new well or wells singly or in the aggregate, or the total installed capacity of old and new wells on or for use on one property.) · new well permit validity: <= 10 years (Measured from date of issuance.)

    “No person or public corporation shall hereafter install or operate any new or additional wells in the counties of Kings, Queens, Nassau or Suffolk to withdraw water from underground sources for any purpose or purposes whatsoever where the installed pumping capacity of any such new well or wells singly or in the aggregate, or the total installed pumping capacity of old and new wells on or for use on one property is in excess of forty-five gallons a minute without a permit pursuant to this title.”
    2 more reviewed findings on this topic
    • Required — Construction or operation of a water-withdrawal system, including a well, regulated under 6 NYCRR Part 601; Part 601 is exclusive of Long Island wells regulated under Part 602.
      “‘Threshold volume’ means the withdrawal of water of a volume of 100,000 gallons or more per day, determined by the limiting maximum capacity of the water withdrawal system; except that for withdrawals for agricultural purposes the threshold volume shall mean the withdrawal of water of a volume in excess of an average of 100,000 gallons per day in any consecutive 30-day period.”
    • Limited — Wells forming part of a water withdrawal system (outside Kings, Queens, Nassau and Suffolk counties, which are under Part 602) with capacity at or above the threshold volume; ordinary domestic wells below the threshold are not covered by this DEC permit
      “'threshold volume' means the withdrawal of water of a volume of 100,000 gallons or more per day, determined by the limiting maximum capacity of the water withdrawal system; except that for withdrawals for agricultural purposes the threshold volume shall mean the withdrawal of water of a volume in excess of an average of 100,000 gallons per day in any consecutive 30-day period.”
  • Shed and accessory-building permit exemptionConditional

    Construction or installation of a one-story detached structure associated with one- or two-family dwellings or multiple single-family dwellings (townhouses), used for tool and storage sheds, playhouses, or similar uses.

    • The authority having jurisdiction must expressly provide the exemption in its code-enforcement program.
    • The gross floor area must not exceed 144 square feet.
    • The exemption is only from the building-permit requirement; it does not authorize work that violates either Code.
    • The governing regulation requires authorities having jurisdiction to require building permits for work that must conform to either or both Codes unless an expressly authorized exemption applies.

    gross floor area: <= 144 square feet (Only for one-story detached structures associated with the specified dwellings and used for tool/storage sheds, playhouses, or similar uses.)

    “set forth in their code enforcement program, an authority having jurisdiction may exempt [...] provided the gross floor area does not exceed 144 square feet;”
  • Subdividing landLimited

    Subdivision review by a town planning board for land outside the limits of an incorporated village in New York.

    • The town board may authorize and empower the planning board only by resolution.
    • Town Law § 276 applies to the part of a town outside the limits of an incorporated village.
    • Subdivision means division of a parcel into lots, blocks, or sites as specified in a local ordinance, law, rule, or regulation, with or without streets or highways, for sale, transfer of ownership, or development.
    • Local regulations may define subdivisions as major or minor and must set the review procedures and criteria for each.
    • Preliminary and final plats must comply with applicable State Environmental Quality Review Act requirements.
    • A final plat receiving conditional approval does not qualify for recording and does not authorize building permits until the required conditions are completed, the plat is signed by an authorized planning-board officer, and the plat is recorded.
    • An approved final plat must generally be filed with the county clerk or register within sixty-two days after final approval or the approval expires.

    minimum unimproved-lot threshold for previously filed plat to be treated as undeveloped: >= 20 percent (unless existing conditions, such as poor drainage, have prevented development) · final plat filing deadline after final approval: 62 days (otherwise approval expires) · partial approved plat filing threshold: >= 10 percent of total lots (remaining sections are subject to the statutory expiration rule)

    “the town board may, by resolution, authorize and empower the planning board to approve preliminary and final plats of subdivisions showing lots, blocks or sites, with or without streets or highways, within that part of the town outside the limits of any incorporated village.”
    2 more reviewed findings on this topic
    • Regulated (with conditions) — Subdivision review in towns, for the portion of a town outside incorporated villages, where the town board authorizes the planning board to review plats.
      “For the purpose of providing for the future growth and development of the town and affording adequate facilities for the housing, transportation, distribution, comfort, convenience, safety, health and welfare of its population, the town board may, by resolution, authorize and empower the planning board to approve preliminary and final plats of subdivisions showing lots, blocks or sites, with or without streets or highways, within that part of the town outside the limits of any incorporated village.”
    • Regulated (with conditions) — Subdivision review in towns outside incorporated villages, where the town board has authorized the planning board to approve subdivision plats.
      “the town board may, by resolution, authorize and empower the planning board to approve preliminary and final plats of subdivisions”
  • Driveway accessRequired

    New or modified commercial access to a New York State highway, including changes of use or expansions of existing development on a State highway.

    • A highway work permit from NYSDOT is required.
    • The commercial driveway/access permit review generally consists of initial proposal review, design review, and final submission review.
    • Final submission may require insurance documentation, performance security, permit fees, and additional documentation.
    • A simple commercial driveway project may qualify for a single-stage expedited review if it meets the applicable criteria.
    • The page states that the PERM 33-COM application and checklist is used for commercial highway work permit submissions, including minor or major commercial driveways, minor home business driveways, or subdivision streets.
    “If your commercial property development plans involve new or modified access to a state highway, or involve any change of use or expansion of an existing development on a state highway, you will need a highway work permit from the New York State Department of Transportation (NYSDOT).”
    2 more reviewed findings on this topic
    • Required — A residence located on a New York state highway when building or modifying a driveway
      “If your residence is on a State highway, you will need a permit from the NYS Department of Transportation to build or modify a driveway.”
    • Required — Building or modifying a residential driveway where the residence is on a New York State highway.
      “If your residence is on a State highway, you will need a permit from the NYS Department of Transportation to build or modify a driveway.”
  • Building in a floodplainRequired

    Development in FEMA-mapped Special Flood Hazard Areas in New York State, with local administration by the municipality having jurisdiction.

    • Local communities participating in the National Flood Insurance Program regulate development in Special Flood Hazard Areas.
    • Private development is subject to local floodplain development permits.
    • Development funded and undertaken by the State or Federal government is an exception to the local-permit rule and is regulated by the responsible agency, subject to technical assistance by NYSDEC and FEMA.
    • Each participating community has a designated floodplain administrator, usually the building inspector or code enforcement official.
    • The local laws apply to development undertaken by any county, city, town, village, school district, or public improvement district within the community.
    • The source states that any new structure or structure substantially improved or substantially damaged is subject to floodplain development regulations, with substantial improvement or damage exceeding 50% of the structure’s market value.

    substantial improvement or damage threshold: > 50 percent of structure market value

    “Private development is subject to local floodplain development permits.”
  • Campground & park staysLimited

    Temporary camping at New York State Department of Environmental Conservation campgrounds statewide.

    • All campers must register and obtain a camping permit.
    • Check-in is from 2:00 p.m. to 9:00 p.m.; campers must register and occupy the campsite by 9:00 p.m. on the first reservation night or the campsite may be re-rented and fees may be forfeited.
    • Campers must vacate by 11:00 a.m. on the final day.
    • Camping permits are limited to 14 nights but may be renewed depending on site availability.
    • From July 1 through Labor Day, only 14 cumulative nights of camping can be obtained at any campground.
    • Campsite occupancy is limited to 6 persons, two tents or one hard-wheeled equipment and one tent, and two vehicles; occupancy varies for Family campsites.
    • Violation of any campground rule is grounds for eviction; an evicted person is not entitled to a refund or to return for one week.

    maximum permit duration: <= 14 nights (May be renewed depending upon availability of sites.) · seasonal cumulative camping limit: <= 14 nights (From July 1 through Labor Day, at any campground.) · campsite occupancy: <= 6 persons (Occupancy varies for Family campsites.)

    “All campers must obtain a camping permit. Campers may check in from 2:00 p.m. to 9:00 p.m. but must register and occupy their campsite by 9:00 p.m. on the first night of their reservation or the campsite will be subject to re-rental and fees may be forfeited. Campers must vacate their campsite no later than 11:00 a.m. on the final day. Camping permits will not be issued for more than 14 nights but may be renewed depending upon availability of sites. From July 1 through Labor Day only 14 cumulative nights of camping can be obtained at any campground.”
  • county building authorityLimited

    County administration and enforcement of the Uniform Code and Energy Code within a local government, including unincorporated town areas, when the local government has opted out or when the Secretary of State designates the county.

    • Every local government ordinarily administers and enforces the Uniform Code and Energy Code.
    • A local government may opt out by local law enacted before July 1; the opt-out becomes effective January 1 of the following year.
    • After a local-government opt-out, the county administers and enforces the codes within that local government.
    • The county may itself enact a local law opting out; if both local government and county opt out, the Secretary of State administers and enforces the codes.
    • Counties may charge fees to defray administration and enforcement costs.
    • A responsible county must establish a code-enforcement program by local law, ordinance, or other appropriate regulation.

    local-government opt-out deadline: < July 1 · successor enforcement date: January 1 (the January 1 next succeeding the effective date of the local law)

    “The secretary may designate the county in which such local government is located to administer and enforce the uniform code in such local government.”
    One more reviewed finding on this topic
    • Limited — New York counties' administration and enforcement of the Uniform Fire Prevention and Building Code, and county adoption of higher or more restrictive construction standards affecting residential construction.
      “In such event the county in which said local government is situated shall administer and enforce such codes within such local government [...] unless the county shall have enacted a local law providing that it will not enforce such codes within that county.”
  • county zoning authorityNone

    New York counties' authority to adopt Euclidean zoning regulations for unincorporated land.

    • New York State law authorizes zoning power for cities, towns, and villages, not counties.
    • Counties retain other land-use-related powers under separate statutes and municipal home rule provisions, but those powers are not general county zoning authority.
    “No enabling legislation had been adopted that delegates zoning power to counties.”

Set by your town or city, not the county

In New York, zoning is adopted by each town or city, so Genesee County has no county-wide answer on these. Find your town or city in the list of places on this page, or call its clerk or zoning administrator.

  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Genesee County, New York

Is Genesee County a good place to live off-grid or homestead?

Genesee County scores 52/100 on the Bolthole Index, a solid county profile. Its strengths: mixed durability signals and workable self-sufficiency basics: 36.9″/yr rainfall and 41.4% wooded land. Watch-outs: about 220,210 people within a 30-minute drive and a weaker property-autonomy legal backdrop.

How much does land cost in Genesee County, New York?

Land in Genesee County runs about $4,099 per acre, based on the latest county data.

What is the water situation in Genesee County?

Genesee County gets about 36.9" of rain a year, with severe drought in roughly 2.4% of years.

How remote is Genesee County?

A representative private-land location has about 220,210 people within a 30-minute drive and 3,217,371 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Genesee compares in New York