Genesee County, New York
Town of Le Roy is a town in Genesee County, New York. Town of Le Roy adopts its own zoning, so inside its limits Town of Le Roy’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Genesee County page.
Work inside the Town of LeRoy that must conform to the Uniform Code.
shed/playhouse permit exclusion floor area: <= 144 square feet (One-story detached structures associated with specified dwellings and used for tool/storage sheds, playhouses, or similar uses.)
“A building permit shall be required for all work which must conform to the New York State Uniform Fire Prevention and Building Code (Uniform Code). The following categories of work shall be excluded from the requirement for a building permit:”
Permitted construction work inside the Town of LeRoy.
“Permitted work shall be required to remain accessible and exposed until inspected and accepted by the Code Enforcement Officer. Permit holders shall be required to notify the Code Enforcement Officer when construction work is ready for inspection.”
Work subject to a building permit, and structures or portions converted to another use or occupancy classification, inside the Town of LeRoy.
“A certificate of occupancy or a certificate of compliance shall be required for any work which is the subject of a building permit and for all structures, buildings, or portions thereof, which are converted from one use or occupancy classification or subclassification to another.”
Land inside the Town of LeRoy, Genesee County, New York.
“Adopted by the Town Board of the Town of LeRoy 6-9-1981.”
Campsites inside the Town of LeRoy.
“Before a permit for a campsite is issued, the Town Board shall determine that the proposed use is designed and arranged”
Subdivision of land inside the Town of LeRoy.
“Adopted by the Town Board of the Town of LeRoy 8-14-1967.”
Town building, planning, zoning, and code applications.
new residential structure building permit fee: per 0.15 USD per square foot (Rounded up to the nearest dollar; new-build multifamily projects have an additional Town fee of $2,500 beyond regular rates.) · residential alteration/addition fee: per 0.1 USD per square foot (Rounded up to the nearest dollar; area includes all floors and accessory garage.)
“Building Permits – Valid for one year from issuance date – six (6) month extension may be granted for good cause – maximum of two (2) such extensions. At discretion of Town Board, projects requiring costs exceeding permit fees (i.e. attorney, engineering, etc.) would require an additional fee.”
Building-permit applications inside the Town of LeRoy.
“submission of the following information and documentation”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Le Roy or Genesee County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Le Roy publishes no rule on the point, not that none exists. Genesee County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Le Roy means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.