Unincorporated Garfield County, Nebraska requires a zoning permit from the county Zoning Administrator before covered construction, alteration, enlargement, movement or occupancy begins1. County zoning applies outside areas where Nebraska law gives zoning jurisdiction to a municipality, so a city or village sets its own zoning and building rules inside its limits1. Septic permits are not a county matter anywhere in Garfield County: the state runs the onsite wastewater program, and most systems are built under Authorization by Rule without a state construction permit2,3.
Do you need a building or zoning permit in Garfield County, Nebraska?
Yes, a zoning permit.
Yes, a zoning permit. For land under Garfield County zoning jurisdiction, obtain a zoning permit before covered excavation, construction, reconstruction, enlargement, alteration, movement, occupancy or water and sewer connection work begins1. The published residence zoning-permit fee is $100, and an accessory building, structure, addition or sign permit is $256. Qualifying nonresidential agriculture-related construction on parcels of 20 acres or more is fee-exempt, but the fee exemption does not erase other approvals6. Nebraska's state building code applies by default where a county, city or village has not adopted an authorized local code after a state-code update, with an exception for construction on a farm or for farm purposes7. The county's published material shows a zoning permit, not a separate county building permit, and we could not confirm whether Garfield County conducts general building inspections; ask the Zoning Administrator what code review or inspections apply. Inside a city or village, ask that municipality about its own building permits and zoning1,8.
Who issues zoning permits in Garfield County, and how do you reach them?
Garfield County Planning and Zoning is the first stop for a rural building project; its Zoning Administrator is at 250 South 8th, Burwell, NE 68823, phone (308) 346-4367, email zoning@garfieldcountyne.gov.
Garfield County Planning and Zoning is the first stop for a rural building project; its Zoning Administrator is at 250 South 8th, Burwell, NE 68823, phone (308) 346-4367, email zoning@garfieldcountyne.gov8. The county requires a written application on forms furnished by the Zoning Administrator, supported by a site plan showing lot dimensions, structures, uses, occupancy, water and sanitary-sewer facilities as needed1. The lot and proposed building location must be staked before construction, and the Zoning Administrator must issue a written permit or written denial within 15 days after accepting the application1. A permit expires if work does not start within 1 year unless the Zoning Administrator grants a written extension1. There is a $500 fine for construction or activity without a permit6. Septic is separate: contact the Nebraska Department of Water, Energy, and Environment at 402.471.2186, not the county3.
Does Garfield County, Nebraska have zoning?
Yes.
Yes. Garfield County zoning covers the county outside areas where Nebraska law explicitly grants jurisdiction to a municipality1. The resolution publishes agricultural, transitional agricultural, river protection, rural residential, lakeside residential, mobile-home residential, flex, planned-development overlay and airport-hazard districts, so a parcel's mapped district controls what can be built and where1. Subdivision and development in county jurisdiction must also comply with applicable zoning and subdivision provisions1. An accessory dwelling in the Lakeside Residential district may be no larger than 50% of the primary structure and must meet applicable setbacks and separation distances1. A leased mobile home in the Mobile Home Residential district must have at least 900 square feet of livable floor area1. Each mobile-home-court lot in that district must have community water and sewage connections, with water sufficient for domestic use and fire protection1.
Who handles septic permits in Garfield County, and how do they work?
Nebraska, not the county, administers private onsite wastewater systems in Garfield County under Title 124, and that holds inside cities and villages as well as in the country.
Nebraska, not the county, administers private onsite wastewater systems in Garfield County under Title 124, and that holds inside cities and villages as well as in the country2. Most onsite wastewater systems in Nebraska are built under Authorization by Rule, which does not require a state construction permit, but some systems need a permit because of wastewater quantity or quality or site conditions3. A new or altered system must also be registered with the state, and city or county requirements may apply separately9. A dwelling or other facility that generates wastewater must use a Title 124-compliant onsite system or connect to a wastewater works10. Cesspools, dry wells, leaching pits and seepage pits are prohibited2. Only 5.3% of Garfield County soils are rated without severe limits for a conventional septic drain field, so make site and soil evaluation an early purchase contingency11. The state program contact at 402.471.2186 can identify the right route for a proposed design3.
Can you live in an RV or tiny home on land in Garfield County?
Garfield County defines a tiny house as 500 square feet or less and recognizes two categories, site-built tiny houses and RV, park-model or camper tiny houses; both remain subject to county zoning and need a zoning permit before construction, movement, use or occupancy.
Garfield County defines a tiny house as 500 square feet or less and recognizes two categories, site-built tiny houses and RV, park-model or camper tiny houses; both remain subject to county zoning and need a zoning permit before construction, movement, use or occupancy1. A site-built tiny house needs at least one habitable room of 120 square feet, a kitchen and sink, toilet facilities, code-compliant systems, egress and foundation, and it cannot be built in a floodplain1. An RV, park-model or camper unit is limited to 400 square feet, must keep its wheels and axles, cannot have a permanent plumbing connection and is only for temporary living quarters1. Tiny-house villages may be allowed only in identified areas through the Planned Development Overlay process1. Temporary zoning permits for temporary construction-related uses run no more than 6 months1. In a county RV park or campground, a tent may serve as auxiliary shelter for no more than 14 consecutive days1. We could not confirm a broader rule for living full-time in an ordinary RV on a private parcel; ask Planning and Zoning before relying on one during construction8.
Building a home in Garfield County: what are the steps?
Ask Garfield County Planning and Zoning to confirm county jurisdiction, the zoning district and whether the proposed home is allowed.
- Ask Garfield County Planning and Zoning to confirm county jurisdiction, the zoning district and whether the proposed home is allowed1,8.
- Ask which state-building-code review and inspections apply; the state code is the default where no authorized local code has been adopted7.
- Prepare the county application and site plan showing the lot, structures, uses, occupancy, water and sanitary-sewer facilities; stake the lot and building location1.
- Contact the state onsite wastewater program, confirm whether your design qualifies for Authorization by Rule or needs a state permit, and register the system3,9.
- Submit the county zoning permit application and fee; the published residence fee is $1006.
- Obtain floodplain approval when applicable and a state permit for a new, moved or altered state-highway driveway12,13.
- Start work before the zoning permit expires or obtain a written extension1.
What should you check before buying land in Garfield County?
Confirm jurisdiction, zoning district and allowed use with Garfield County Planning and Zoning before treating a listing as buildable.
Confirm jurisdiction, zoning district and allowed use with Garfield County Planning and Zoning before treating a listing as buildable1,8. Check flood mapping and permitting because every development in a Nebraska floodplain requires a permit, including additions and new structures12. Test the proposed septic area early: just 5.3% of county soils are rated without severe limitations for a conventional drain field11. Confirm legal road access, and remember that a new, moved or altered approach onto a state highway requires a state permit13. Ask the appropriate water authority about a private well because we could not confirm the county-specific permit or registration requirement. For budgeting context, the county's median property-tax bill is $2,085 per year and its effective property-tax rate is 1.4%11. Garfield County averages 3.1 people per square mile, which signals a very rural service environment11.
Watch-outs
- A zoning permit can be required even when construction qualifies for the county's agricultural fee exemption1,6.
- An owner-builder exemption from contractor registration or from Nebraska's architect licensure rules (detached one- to four-family homes under 5,000 square feet above grade) does not waive Garfield County's zoning permit1,4,5.
- Septic feasibility deserves early testing because only 5.3% of county soils are rated without severe limits for a conventional drain field11.
- A parcel inside a city or village follows that municipality's zoning and building rules, not the county's, though septic stays with the state program1,3.
Sources
13 official pages, each quoted and re-checked · written October 9, 2026
- Garfield County Zoning Resolution 2022
- Title 124 - Onsite Wastewater Treatment Systems
- Nebraska Department of Water, Energy, and Environment (dee.nebraska.gov)
- Nebraska Revised Statute 48-2104 — Registration required (Nebraska statewide rule)
- Nebraska Revised Statute 81-3449 — Practice of architecture; exempted activities
- Zoning Fees – Garfield County
- Nebraska Revised Statute 71-6403 — State building code; adopted; amendments
- Garfield County Planning and Zoning (garfieldcounty.ne.gov)
- Onsite Wastewater Program (Nebraska statewide rule)
- Onsite Wastewater Treatment Facilities: Just for Homeowners (Nebraska statewide rule)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Floodplain Management Q&A: Permits (Nebraska statewide rule)
- Title 410, Chapter 2 - Driveway and Approach Road Permits (Nebraska statewide rule)
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Garfield County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.