Building permits, zoning and septic rules in Perry County, Mississippi

67Index Score / 100
#53 of 82 in Mississippi

Perry County, Mississippi does not publish a residential building-permit office or process, so confirm the current permit and inspection path with the Board of Supervisors before building in an unincorporated area1,2. Unincorporated Perry County does not have county-level zoning2. Septic permits go through the Mississippi State Department of Health3.

Do you need a building permit in Perry County, Mississippi?

Perry County's residential building-permit requirement and local application process could not be confirmed.

Perry County's residential building-permit requirement and local application process could not be confirmed1. The Mississippi Insurance Department says all counties and municipalities must enact uniform building codes unless they opted out before the 2014 deadline, but that source does not show whether Perry County opted out or what code it enforces7. Do not market rural land as permit-free or code-free. Before ordering plans or starting site work in unincorporated Perry County, ask the Board of Supervisors who accepts residential permit applications, which code applies, what inspections are required, what the fees are and whether a certificate of occupancy is issued2. Incorporated places may administer their own requirements, so contact the relevant city when a parcel is inside municipal limits8.

Who handles Perry County building permits, and how do you reach them?

Perry County does not publish a dedicated building department, application, fee schedule or inspection process, so the local construction path could not be confirmed.

Perry County does not publish a dedicated building department, application, fee schedule or inspection process, so the local construction path could not be confirmed1. Start with the Perry County Board of Supervisors at 101 Main St. in New Augusta, by phone at 601.964.8370 or email at contact@perrycountyms.gov2. Ask the Board office to identify the current building and floodplain officials, then get parcel-specific requirements in writing. For an entrance on a county road, the Perry County Engineer is the public-infrastructure contact and handles questions involving county roads, bridges and drainage9. A driveway connecting to a state highway requires an MDOT permit10.

Does Perry County have zoning?

Unincorporated Perry County does not have county-level zoning.

Unincorporated Perry County does not have county-level zoning2. That does not settle every parcel question: county standards for setbacks, minimum lot size, minimum dwelling size, building height and lot coverage could not be confirmed. Ask the Board of Supervisors for a parcel-specific written answer before relying on a seller's description2. If the land lies inside an incorporated municipality, contact that city because Mississippi permit and zoning requirements vary by local government8. The county's floodplain-development permit requirement and current administrator also could not be confirmed, so ask the Board office before placing improvements in a mapped flood area2.

How do septic permits work in Perry County?

The Mississippi State Department of Health administers individual on-site wastewater systems in Perry County.

The Mississippi State Department of Health administers individual on-site wastewater systems in Perry County3. A permanent sewer or septic solution is required before a permanent water meter can be connected, and an MSDH permit is required for an onsite system4. MSDH reviews the application before invoicing, emails the invoice within one business day and requires payment before visiting the property4. Current online fees are $197.50 for Notice of Intent plus Final Approval or $100 for Notice of Intent plus Exemption; processing fees may apply and charges can change4. The exemption route does not include an MSDH approval visit after installation4. Start with the Perry County Health Department at 601-964-328811. Only about 33.3% of county soils lack severe limitations for a conventional drain field, so evaluate the site before fixing the house location or wastewater budget6.

Can you live in an RV or tiny home on your land in Perry County?

Perry County does not have county-level zoning in unincorporated areas, but long-term RV occupancy, temporary camping and tiny-home occupancy still could not be confirmed.

Perry County does not have county-level zoning in unincorporated areas, but long-term RV occupancy, temporary camping and tiny-home occupancy still could not be confirmed2. Ask the Board of Supervisors about residential occupancy, construction, address assignment and floodplain review before moving onto the parcel2. For wastewater purposes, MSDH treats a hunting camp as a residential application; a hunting-camp property with three or more trailers, cabins or RVs requires a commercial-development application4. Mississippi does not recognize gray water as a separate waste stream: all wastewater must discharge to sewer or septic, not onto the ground, into a ditch or into water4. The owner-builder exemption removes a state residential-builder licensing requirement for work on your own residence, but it does not waive permits or other rules5.

Building a home in Perry County: the steps, in order

Ask the Perry County Board of Supervisors to identify the current building, inspection and floodplain authorities for the parcel.

  1. Ask the Perry County Board of Supervisors to identify the current building, inspection and floodplain authorities for the parcel2.
  1. If the parcel is inside a municipality, confirm that city's separate requirements before design work8.
  1. Apply to MSDH for the onsite-wastewater permit; payment is due before the property visit4.
  1. Confirm entrance approval with the County Engineer for a county road or obtain an MDOT permit for a state-highway connection9,10.
  1. Submit the residential permit documents the county identifies and schedule required inspections; Perry County's exact process remains unconfirmed1.
  1. If acting as your own general contractor on your own residence, document the state licensing exemption while following every applicable permit rule5.

What should you check before buying land in Perry County?

Start with wastewater: only about 33.3% of Perry County soils lack severe limitations for a conventional drain field, so obtain the state site evaluation before assuming a standard system will fit.

Start with wastewater: only about 33.3% of Perry County soils lack severe limitations for a conventional drain field, so obtain the state site evaluation before assuming a standard system will fit4,6. If land will be divided, MSDH reviews onsite-wastewater designs for subdivisions, but that does not establish whether Perry County separately regulates plats or subdivision layout3. Check access next: the County Engineer handles county-road infrastructure questions, while a new driveway onto a state highway requires an MDOT permit9,10. Confirm setbacks, dwelling type, RV use and floodplain review with the Board of Supervisors even though unincorporated Perry County lacks county zoning2. Perry County is about 88.1% wooded and about 41.8% federally owned, so verify surveyed boundaries and legal access6.

Watch-outs

  • Perry County's building-permit and inspection process could not be confirmed; ask the Board of Supervisors to identify the current authority before construction begins1,2.
  • Unincorporated Perry County lacks county zoning, but RV and tiny-home occupancy rules remain unconfirmed; obtain a parcel-specific written answer before moving onto the land2.
  • Only about 33.3% of Perry County soils lack severe limitations for a conventional septic drain field; complete the state site evaluation before fixing a house location or wastewater budget4,6.

Sources

11 official pages, each quoted and re-checked · written October 10, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 3 of the 4 neighbors with published rules, Perry County requires a building permit for a home.

RulePerry CountyForrest CountyGreene CountyStone CountyJones CountyLamar CountyGeorge County
Building permitRequiredNot requiredNot publishedRequiredRequiredRequiredNot published
County zoningNoNot publishedNoNoNot publishedYesNo
Septic permitsMS State Dept. of HealthMSDHMS State Dept. of HealthMS State Dept. of HealthCounty Health Dept.MSDHMS State Dept. of Health

County locator

Perry County in Mississippi

67
County map
Perry County highlighted among the Mississippi counties · colored by Index score

How Perry County scores

67 / 100 · #53 of 82 in Mississippi · six factors, land price, tax, rain and climate

Seclusion44100% ev.
Self-Sufficiency72100% ev.
Admin Boringness7268% ev.
Durability54100% ev.
Property Autonomy39100% ev.
Carry Cost86100% ev.

Evidence strength: 95%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$168kTypical home
0.8%Property tax
$3,656Land / acre
63"Annual rain
6.2% of yrsSevere drought
16.7 / yr (+14.7)Mid-century 100°F days
16.9 daysMid-century dry spell
3.12" (+6.6%)Mid-century 1-day rain
1.37×Wildfire change factor
100%Forward climate coverage
$2,049Home insurance / yr
-0.7% / yrInsurance growth
1.43%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
78,825People within 30 min
2,168,360People within 2 hr
25,765Radius comparison (15 mi)
17.5People / sq mi
41.8%Federal land
96.5%Land at 15% slope or less
33.3%Soils rated "not limited" for septic (strict USDA rating)
136,531 acWorkable land screen
88.1%Wooded land
45.2 tonsBiomass / forest ac
66.1°FAvg temp

Scout Perry County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Perry County. Listing sites control their own results and filters.

Sell land in Perry County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Perry County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Answers from the rulebook for Perry County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Perry County rules

  • County-wide zoningAbsent

    Perry County's official website lists no planning/zoning department and directs property owners to the zoning officials of the relevant city, indicating no county-level zoning in unincorporated areas.

    Perry County, MS - Official Website ↗From the county’s own site, awaiting a second reviewer

Mississippi rules that apply here

  • Building permitRequired

    Commercial places of Public Assembly subject to the Mississippi Fire Prevention Code.

    • Permit/compliance inspections are required for buildings defined in Miss. Code § 45-11-101(a-f), pursuant to Miss. Code § 45-11-105(2).
    • The code applies to buildings used for public assembly except where a county or municipality has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code; the local provisions and enforcement mechanism apply instead.
    • Permit fees are not less than $400 and include, but are not limited to, each on-site inspection, attorney fees, architect or engineer plan-review fees, and other fees and reasonable and necessary travel expenses.
    • The regulation supersedes prior versions of Mississippi Administrative Code Title 19, Part 7, Chapter 7, and became effective January 1, 2025.

    permit fee: >= 400 USD (Includes but is not limited to each on-site inspection, attorney fees, architect or engineer plan-review fees, other fees, and reasonable and necessary travel expenses.)

    “Permits are required for commercial places of Public Assembly as follows: A. Permit/Compliance inspections are required for all buildings defined in Miss. Code § 45-11-101(a-f) pursuant to Miss. Code § 45-11-105(2).”
    One more reviewed finding on this topic
    • Required — Construction in unincorporated Perry County under the statewide county-permitting requirement.
      “each and every county in this state shall require permitting as a condition to construction within the unincorporated areas of the county”
  • Owner-builder exemptionAvailable (with conditions)

    A person undertaking construction or improvement on the person's own residence, or acting as the person's own general contractor, in Perry County.

    • The exemption is for the person's own residence.
    • The cited statutory text also lists agricultural buildings, buildings used for agricultural purposes, community-effort buildings, and tenant houses.
    • The exemption concerns residential builder licensing and does not establish exemption from building permits or other rules.
    “This chapter shall not apply to: [...] Any person who undertakes construction or improvement on his own residence, or who acts as his own general contractor in the performance of construction or improvement on his own residence;”
    One more reviewed finding on this topic
    • Available (with conditions) — A person undertaking construction or improvement on the person's own residence or acting as the person's own general contractor for construction or improvement on that residence, for purposes of Mississippi residential builder and remodeler licensing requirements.
      “(1) This chapter shall not apply to: [...] (b) Any person who undertakes construction or improvement on his own residence, or who acts as his own general contractor in the performance of construction or improvement on his own residence;”
  • Building code adoptedPartial

    The Mississippi Fire Prevention Code and State Fire Marshal enforcement for state-owned or state-agency buildings, public-assembly buildings, and buildings at least 75 feet high, subject to local fire-prevention-code exceptions stated in the statute.

    • The State Fire Marshal's Office adopted the 2024 editions of the International Fire Code and International Building Code effective July 1, 2024.
    • The Mississippi Fire Prevention Code applies to all buildings owned by the State or State Agencies.
    • It applies to all buildings utilized for public assembly except in a county or municipality that has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code.
    • It applies to buildings whose construction permits were issued after the statutory effective date and that are not less than 75 feet in height, unless the county or municipality has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code.

    International Fire Code edition: 2024 edition · International Building Code edition: 2024 edition · effective date: 2024-07-01 · height threshold: >= 75 feet (Local fire-prevention code exception applies where stated.)

    “AS OF JULY 1, 2024, THE STATE OF MISSISSIPPI – OFFICE OF THE STATE FIRE MARSHAL HAS ADOPTED THE 2024 ADDITION”
    3 more reviewed findings on this topic
    • Adopted (with conditions) — Mississippi counties and municipalities, including Perry County, subject to any applicable statutory opt-out.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”
    • Partial — Mississippi counties and municipalities subject to the statewide uniform-building-code framework.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014. Please complete the following information regarding your county or municipality’s building code policies.”
    • Partial — Mississippi counties and municipalities, including residential building-code adoption subject to the statewide uniform-building-code framework.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”
  • InspectionsLimited

    Pediatric skilled nursing facilities regulated by the Mississippi State Department of Health.

    • Upon completion of construction, the Licensing Agency must inspect and approve the facility before occupancy.
    • The state and county health departments may access the job site during regular business hours and conduct construction progress inspections as deemed necessary by the agency.
    “Upon completion of construction, an inspection shall be made by the Licensing Agency and approval given prior to occupying the building or any part thereof. The state and county health departments shall have access to the job site during regular business hours and shall conduct construction progress inspections as deemed necessary by the agency.”
  • Certificate of occupancyLimited

    Pediatric skilled nursing facilities regulated by the Mississippi State Department of Health at final inspection and close-out.

    • At final inspection, the State Agency must receive a Certificate of Occupancy or statement of approval from the local building official permitting occupancy for the facility's intended use.
    • If there is no local building authority, approval from the local fire authority having jurisdiction must be provided.
    • If the facility is state-owned and subject to the State Bureau of Buildings, Grounds and Real Estate Management, approval of occupancy must be coordinated between the state agencies involved.
    “A copy of the Certificate of Occupancy or statement of approval from the local building official permitting occupancy of the facility for its intended use. In the absence of a local building authority, approval of a local fire authority having jurisdiction shall be provided. If the facility is owned by the State of Mississippi and subject to the State Bureau of Buildings Grounds and Real Estate Management, approval of occupancy shall be coordinated between the state agencies involved;”
  • SetbacksSpecified

    Individual on-site wastewater disposal systems using aggregate disposal systems in Mississippi.

    • The 50-foot measurement is the minimum distance from the water edge for all listed non-gravel soil textural classes and for slopes both less than and more than 8 percent.
    • Gravel is marked "NOT APPLICABLE."
    • The regulation states that these setbacks apply to all individual on-site wastewater disposal systems except spray-irrigation disposal and overland discharge.
    • This is an on-site-wastewater setback, not a statewide zoning setback for the dwelling or other structures.

    minimum distance from water edge: 50 feet (Aggregate systems in coarse sand, medium sand, fine sand, loamy sand, sandy loam, light loam, heavy loam, silt loam, sandy clay loam, light clay loam, heavy clay loam, light silty clay loam, heavy silty clay loam, sandy clay, silty clay, and clay; both slope categories shown in Table 1.)

    “TABLE 1 - SETBACK REQUIREMENTS FROM SENSITIVE WATER (Aggregate Systems) Minimum Distance from the Water Edge [...] Coarse Sand 50 feet 50 feet”
  • Living in an RVLimited

    RVs at a hunting camp where the camp uses the Mississippi Department of Health on-site wastewater application process.

    • The camp is treated by MSDH as a residential application.
    • Three or more trailers, cabins, or RVs on the property must be applied for as a commercial development.
    • For a permanent water meter, state law requires a permanent sewage-disposal solution; it may be a sewer line or septic system. If public sewer is unavailable, the applicant must apply to MSDH for the required paperwork.
    • Local jurisdictions have separate land ordinances; this claim does not establish a statewide land-use permission for RV occupancy.

    trailers/cabins/RVs triggering commercial-development application: >= 3 units (On the hunting-camp property.)

    “Yes. This is considered a residential application with us. If there will be three (3) or more trailers/cabins/RVs on the property, this will need to be applied for as a commercial development.”
    One more reviewed finding on this topic
    • Limited — RV occupancy at a hunting camp where onsite-wastewater service is needed in Mississippi, including Perry County.
      “Yes. This is considered a residential application with us. If there will be three (3) or more trailers/cabins/RVs on the property, this will need to be applied for as a commercial development.”
  • Tiny homesLimited

    A tiny house or home intended for use as a residential dwelling that is within the State Fire Marshal's factory-built-home regulation.

    • The defined tiny house or home ranges from 80 to less than 400 square feet and may or may not be constructed on a chassis with or without axles or wheels.
    • If intended as a residential dwelling, it is treated as a modular home for design and construction requirements and must comply with the most current residential building code adopted by the Mississippi Building Codes Council.
    • When designed for permanent installation at its final destination, it must be installed on an approved foundation complying with the manufacturer's installation guidelines concerning manufacturing-facility and retail-entity licensure and occupant-safety installation standards.
    • The amended regulation superseded prior versions and became effective July 1, 2026.
    • Counties and municipalities may regulate zoning, utility connections, foundations, and permits for modular homes; local land-use controls may therefore add requirements.

    tiny-home floor area: 80 to less than 400 square feet (Definition in Rule 3.01.3(42).)

    ““Tiny House or Home”: Any closed structure, building assembly or systems of assemblies designed for use as a residential dwelling and ranging from 80 to less than 400 square feet in size, which may or may not be constructed on a chassis (with or without axels or wheels).”
  • Manufactured homesLimited

    Occupation of Factory-Built homes, including manufactured homes, sited anywhere in Mississippi and installed on or after July 1, 2009.

    • The home must undergo inspection under the Mississippi Inspection Program before occupation.
    • The inspection is conducted by an inspector assigned by the State Fire Marshal’s Office to verify compliance with the manufacturer’s published installation instructions and Mississippi Installation Standards.
    • The retailer/developer and/or installer/transporter must submit a Property Locator/Certificate of Installation Form certifying compliant installation.
    • For new or used residential homes involving a retailer, the form and required photographs must be submitted within three business days after installation and before porches, decks, or skirting are installed.
    • For secondary sitings without a retailer, the installer/transporter must submit the form and required photographs within three business days after installation and before porches, decks, or skirting are installed.
    • All necessary state-law or local-authority-having-jurisdiction permits must be obtained before installation.
    • Inspection fees are paid by the installer/transporter, developer, or retailer, not the purchaser; failure to pay an invoice within 45 days is a regulatory violation.
    • Factory-Built homes designated and properly certified not to be used for human habitation, such as hunting/fishing camps or storage, are excepted from the human-habitation installation requirements.

    installation inspection applicability date: 2009-07-01 · current regulation effective date: 2026-07-01 · certificate submission deadline: <= 3 business days after installation (Must also be before installation of porches, decks, or skirting; secondary sitings without a retailer follow the installer/transporter rule.) · inspection scheduling window: 7 to 10 business days after receipt of Property Locator/Certificate of Installation (May be adjusted for Division resource and manpower shortages.) · inspection invoice payment deadline: <= 45 days from invoice date (Nonpayment is a violation and numerous unpaid invoices may delay or deny license issuance.)

    “Beginning July 1, 2009, every Factory-Built home that is sited within the State of Mississippi shall be subject to inspection under the MS Inspection Program prior to occupation.”
  • Who permits septicMixed

    Statewide individual onsite wastewater disposal systems; the Mississippi State Department of Health establishes the rules and the appropriate county Department of Health performs local inspections.

    • The governing regulation is promulgated under the Mississippi Individual On-site Wastewater Disposal Law.
    • Inspection scheduling and inspections are handled with the appropriate county Department of Health.
    “Notify the Department at least 48 hours before beginning construction if acting as the Certified Installer of an Individual On-site Wastewater Disposal System and, at that time, schedule a time for inspection of the system with the appropriate county Department of Health.”
    One more reviewed finding on this topic
    • State (with conditions) — Individual on-site wastewater disposal systems in Mississippi, including Perry County.
      “The On-site Wastewater program develops policy and regulations”
  • Septic permitRequired

    Design, construction, or installation of an individual on-site wastewater disposal system in Mississippi.

    • MSDH approval is required except for the statutory exemption in Mississippi Code Section 41-67-6(7).
    • For a two-acre-or-larger lot or tract, approval requirements are exempt only if all wastewater is contained on the lot or tract, no Mississippi or United States watercourse is impacted, and the installer submits a signed affidavit attesting to those conditions.
    • An individual on-site wastewater disposal system is acceptable only where centralized treatment is unavailable or infeasible, existing area disposal systems function satisfactorily, site conditions are satisfactory for underground absorption, private-water-supply separation/protection requirements are met, and applicable water-quality requirements are met.
    • Construction or installation designed by a certified professional evaluator or licensed professional engineer may not begin before Department authorization.

    statutory approval-exemption lot size: >= 2 acres (All wastewater must be contained on the tract, no covered watercourse may be impacted, and an installer affidavit is required.) · private water supply separation from IOWDS: >= 50 feet (Private supply must be at a higher elevation or properly protected.) · private water supply separation from disposal field: >= 100 feet

    “Approval of the design, construction or installation of an individual on-site wastewater disposal system by the department is required, except as otherwise provided in Section 41-67-6(7).”
    One more reviewed finding on this topic
    • Required — Installation of an on-site wastewater disposal system and obtaining a water meter in Mississippi, including Perry County.
      “The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
  • Septic inspectionLimited

    Installation of an individual on-site wastewater disposal system in Mississippi.

    • For the ordinary Notice-of-Intent and Final-Approval process, the certified installer must contact MSDH 24 hours before construction to schedule an inspection.
    • A two-acre exemption applicant receives a site evaluation and disposal-system recommendation, but MSDH does not inspect during installation.
    • For the two-acre exemption, the Department reserves the right to inspect an installed system after it has been in use for more than 30 days.
    • Final approval requires the installer affidavit; advanced treatment systems also require the property owner's maintenance affidavit.

    advance notice before construction: >= 24 hours (Certified installer must contact the Department to schedule inspection.) · two-acre-exemption post-use inspection threshold: > 30 days (MSDH reserves the right to inspect systems on properties that filed a two-acre exemption.)

    “The Department reserves the right to inspect installed systems after they have been in use for more than thirty (30) days on properties that have filed a two-acre exemption.”
    One more reviewed finding on this topic
    • Limited — Inspection of individual on-site wastewater systems in Mississippi, including Perry County.
      “The second difference means we do not go out to approve the installation, which is why the application costs less. This approval ensures that the Certified Installer installed everything legally and properly and will not be available if the system is already in the ground.”
  • Off-grid sanitationLimited

    Off-grid wastewater disposal in Mississippi, including Perry County.

    • All wastewater must be piped to a central sewer system or septic system for proper disposal.
    • No gray water may be discharged on ground, ditches, or bodies of water.
    “Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
  • Well permitLimited

    Groundwater withdrawal permits for water wells in Mississippi.

    • A groundwater withdrawal permit is required for water wells with surface casing diameters of 6 inches or greater.
    • Some exclusions apply.
    • A separate contractor licensing requirement generally applies, but a landowner may drill without a Water Well Contractor license for a single-family permanent residence or farm livestock use if applicable construction standards are followed.
    • Wells with surface casing diameters below 6 inches may still be regulated by the Mississippi State Department of Health when part of a public water system.

    surface casing diameter threshold: >= 6 inches (Some exclusions apply.)

    “State law requires that you obtain a groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter. Some exclusions apply to this requirement.”
  • Mandatory utility hookupConditional

    Public water connections and connection to centralized wastewater treatment systems for residences, buildings, and facilities in Mississippi.

    • A public water utility may not connect water service without prior written Department approval certifying that the sewage treatment and disposal plan complies with state law.
    • Water utility connections may be made during construction only if the Department approved the sewage plan and the owner agreed to inspection and approval before use or occupancy.
    • Where centralized wastewater treatment is constructed and becomes available, onsite systems must be abandoned and residences, buildings, or facilities connected to the centralized system.
    • Temporary onsite systems may be used only under the stated 36-month centralized-treatment conditions.

    centralized wastewater availability deadline: 36 months (The developer must sign a written agreement to connect when available and install internal sewage collection to the connection point.)

    “Where a Centralized Wastewater Treatment System is available, all places shall have a properly constructed connection to the centralized wastewater treatment system which all human excreta and other liquid waste shall be disposed”
    One more reviewed finding on this topic
    • Conditional — Permanent water-meter connection where permanent sewage disposal is required in Mississippi, including Perry County.
      “State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system.”
  • Agricultural exemptionAvailable

    Applicability of Mississippi Code Title 73, Chapter 59 residential-builder and remodeler licensing requirements.

    • The cited exemption applies to the Residential Builders and Remodelers chapter.
    • It covers agricultural buildings, buildings used for agricultural purposes, buildings constructed as a community effort, and tenant houses.
    • The source does not establish an exemption from independently applicable local permits, zoning, floodplain rules, or wastewater requirements.
    “This chapter shall not apply to: (a) Agricultural buildings, buildings used for agricultural purposes, buildings constructed as a community effort, or tenant houses;”
  • Subdividing landRegulated (with conditions)

    Mississippi State Department of Health review of subdivision land divisions for onsite-wastewater suitability; this does not establish that MSDH approves the general land-use plat or replaces county or municipal plat review.

    • A subdivision is defined for this review as land divided into ten (10) or more lots, tracts, sites, or parcels for residential development.
    • Local or county ordinances may reduce the ten-lot threshold.
    • If public water will be used, the Bureau of Public Water Supply may require subdivision review regardless of lot count.
    • Developments of 35 or more lots and additional phases by the same owner require a feasibility study; developments under 35 lots may be required to obtain one case-by-case.
    • No lots may be sold or construction started before evaluation.
    • The subdivision plan-review fee is $325 plus $6.50 per lot; online payment is subject to a processing fee and fees may change.
    • The plan review is voided if the developer alters the plat without notifying MSDH; MSDH determines whether a new review is required.
    • MSDH reviews lots for general suitability of onsite wastewater treatment and disposal for one residence per lot; septic, soil, wetland, water-supply, and other health requirements remain applicable.

    residential subdivision threshold: >= 10 lots (Local ordinances may reduce the minimum below ten lots.) · feasibility-study threshold: >= 35 lots (Additional phases by the same owner also require a feasibility study; smaller developments may be required case-by-case.) · subdivision plan-review fee: 325 USD (Plus $6.50 per lot; online payment processing fee and possible additional costs may apply.)

    “All lots are reviewed for general suitability of on-site wastewater treatment and disposal for a single residence per lot.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Commercial developments that are subdivisions and require individual onsite-wastewater-system authorization in Mississippi, including Perry County.
      “Commercial Developments (Subdivisions, Manufactured, Multi-family, RV Campgrounds/Lodging Parks)”
  • Driveway accessRequired

    Driveways and specified changes of use connecting to Mississippi state highways.

    • A permit is required for new driveways.
    • A permit is required for alterations to existing drives.
    • A permit is required for a change of use causing a daily-trip increase of 10% or 100 daily trips, whichever is greater.
    • A permit is required for property-use changes from non-commercial to commercial.
    • If access is expected to exceed 100 peak-hour trips, a traffic-impact study must be submitted.
    • If the permitted land use changes, the original permit is revoked and a new permit must be applied for.
    • A denied permit may be appealed within 10 days after receipt of the denial notification.

    daily trip increase threshold: 10 percent (or 100 daily trips, whichever is greater) · traffic impact study threshold: > 100 peak-hour trips · appeal deadline: 10 days (after receipt of denial notification)

    “For State Highways a permit is required for: 1. New driveways; 2. Alterations to existing drives;”
  • Building in a floodplainRequired

    Development or improvement activity on state-owned Mississippi property or buildings located in FEMA Special Flood Hazard Area zones A, AE, V, or VE.

    • The requirement applies to state-owned property or buildings.
    • For existing structures determined to involve less than a Substantial Improvement, no additional forms or approval are required after Step One.
    • For new development or a Substantial Improvement, the applicant must complete the Step Two form, obtain a Control Code, provide all required attachments, and submit final elevation certification and complete drawings and specifications.
    • Approval produces an initial approval letter and, after final requirements are approved, a final approval letter.
    • If Step Two is not approved and the project cannot be brought into compliance, a denial letter is issued.

    covered FEMA zones: A, AE, V, VE · substantial improvement threshold: less than a Substantial Improvement (no additional forms or approval required for the development project)

    “A development or improvement activity to state-owned property or building, [...] must complete a Floodplain Management Permit Application.”
  • Permit feesPublished (with conditions)

    Mississippi Department of Transportation over-dimensional and related permits statewide.

    • The published schedule applies to MDOT permit types, not a general statewide building-permit fee schedule.
    • Blanket permits are not prorated and are issued for one year unless otherwise specified.
    • Blanket permits must have valid insurance or a valid U.S. DOT number; if insurance expires or cancels, the blanket permit becomes invalid.
    • Overweight charges apply to weight exceeding 80,000 pounds or specified axle limits.

    oversize permit fee: 10 USD · oversize blanket fee: 100 USD · 72-hour legal trip permit fee: 25 USD · harvest permit fee: 25 USD · port permit fee: 170 USD per year · pole blanket fee: 200 USD

    “Oversize permit $10.00 Oversize Blanket $100.00”
    One more reviewed finding on this topic
    • Published (with conditions) — MSDH onsite-wastewater applications in Mississippi, including Perry County.
      “Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 Private Water Well Sample is currently $10 Non-residential Water Meter is currently $0 Commercial Establishment + Final Approval is currently $412.50 Existing Commercial Establishment is currently $315 Commercial Development is currently $412.50 + $2.60/unit. A unit can be an apartment, house, trailer, RV or any other independent quarters for a single family. Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used. See other FAQ questions for details about application types.”
  • Permit processPublished (with conditions)

    MSDH onsite-wastewater application process in Mississippi, including Perry County.

    • MSDH personally reviews applications before invoicing.
    • The invoice is emailed within one business day of receiving the application.
    • Payment must be received before MSDH visits the property.

    invoice delivery after application receipt: <= 1 business day

    “We personally review all applications before invoicing. This prevents many mistakes, such as duplicate applications or applying for the wrong service to occur. The invoice is emailed to you from support@msegov.com within one (1) business day of receiving the application. Check your Spam folder if you do not see anything in your Inbox. We must receive your payment prior to visiting the property.”
    One more reviewed finding on this topic
    • Partial — Mississippi local permitting for businesses and business-related construction or land development.
      “You may be required to apply for permits and licenses from your local government (e.g., city or county). Different locations have different requirements.”
  • Campground & park staysLimited

    Recreational-vehicle occupancy at campgrounds under the jurisdiction of the Pearl River Valley Water Supply District, including Coal Bluff, Goshen Springs, Leake County Water Park, Low Head Dam, and Timberlake.

    • The rules apply within all campgrounds under the District’s jurisdiction.
    • Campgrounds are not intended to be permanent domiciles for campground guests.
    • A recreational vehicle must be in operable road-worthy condition, properly registered and insured in its domicile state or province, with a current license plate affixed.
    • Campers may not stay on any pad longer than 12 consecutive months; Standard Plus campers may move to another available pad after 12 months, but the District is not responsible for making a pad available.
    • Campsites are typically designed for trailers or recreational vehicles no longer than 32 feet or wider than 8 feet, subject to the stated RVIA-seal, holding-tank, facility-capacity, and prohibited-unit conditions.
    • Primitive camping areas without water, electricity, or sewer are not intended for recreational vehicles.
    • No permanent structures may be erected on a campsite; temporary accessibility stairs, stoops, steps, or ramps require the stated approvals and size limits.
    • Camping is confined to designated campground or overflow areas, and no more than one camping unit is allowed per pad without Campground Manager approval.

    maximum stay on one pad: <= 12 consecutive months (Campers may move to a different available pad after 12 months.) · typical campsite RV length: <= 32 feet (Larger units may be accepted if they satisfy the stated RVIA seal, holding-tank, and facility-capacity conditions.) · typical campsite RV width: <= 8 feet (Larger units may be accepted if they satisfy the stated RVIA seal, holding-tank, and facility-capacity conditions.)

    “Campers shall not stay on any pad longer than 12 consecutive months”
    One more reviewed finding on this topic
  • county building authorityGeneral

    Mississippi county boards of supervisors' authority and obligation to adopt uniform building codes, including in unincorporated county territory, subject to the statutory opt-out framework.

    • All counties and municipalities must enact uniform building codes unless they opted out before November 30, 2014.
    • A county board of supervisors adopting building codes after July 1, 2008 must adopt as minimum codes codes established and promulgated by the Mississippi Building Codes Council.
    • The statewide source does not identify current county-by-county residential permit enforcement or opt-out status.

    opt-out deadline: 2014-11-30 · minimum-code requirement for codes adopted after: >= 2008-07-01

    “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Local zoning — Local zoning within Perry County, including incorporated municipalities and unincorporated areas.
  • Zoning districts — County zoning districts in Perry County.
  • Minimum dwelling size — Minimum dwelling size in unincorporated Perry County.
  • Minimum lot size — Minimum lot size in unincorporated Perry County.
  • Lot coverage — Lot coverage in Perry County.
4 more unanswered
  • Building height
  • Camping on your land
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Perry County, Mississippi

Is Perry County a good place to live off-grid or homestead?

Perry County scores 67/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and low administrative friction for a quiet rural property. Watch-outs: a weaker property-autonomy legal backdrop.

How much does land cost in Perry County, Mississippi?

Land in Perry County runs about $3,656 per acre, based on the latest county data.

What is the water situation in Perry County?

Perry County gets about 63" of rain a year, with severe drought in roughly 6.2% of years.

How remote is Perry County?

A representative private-land location has about 78,825 people within a 30-minute drive and 2,168,360 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Perry compares in Mississippi