Perry County, Mississippi
Town of New Augusta is a town in Perry County, Mississippi. Septic permits inside Town of New Augusta come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Perry County page.
Town of New Augusta does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater systems inside New Augusta town limits when public sewer is unavailable.
“You will not have a sewer line available. If you have a sewer bill, you do not come to us.”
Installation of an on-site wastewater disposal system inside New Augusta town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
A real-estate transaction involving a home with a septic system inside New Augusta town limits.
“The State does not require the septic be inspected as part of a real estate transaction. However, MSDH recommends this inspection.”
Wastewater disposal inside New Augusta town limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Water wells inside New Augusta town limits.
surface casing diameter: >= 6 inches (Some exclusions apply.)
“State law requires that you obtain a groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter. Some exclusions apply”
A property inside New Augusta town limits seeking a permanent water-meter connection.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property.”
MSDH on-site wastewater applications relevant to properties inside New Augusta town limits without public sewer service.
“We personally review all applications before invoicing. This prevents many mistakes, such as duplicate applications or applying for the wrong service to occur. The invoice is emailed to you from support@msegov.com within one (1) business day of receiving the application. Check your Spam folder if you do not see anything in your Inbox. We must receive your payment prior to visiting the property.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of New Augusta or Perry County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of New Augusta publishes no rule on the point, not that none exists. Perry County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of New Augusta means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.