Perry County, Mississippi
Town of Richton is a town in Perry County, Mississippi. Septic permits inside Town of Richton come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Perry County page.
Town of Richton does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Buildings inside Richton town limits that are state-owned or state-agency-owned, used for public assembly, or at least 75 feet high and covered by the Mississippi Fire Prevention Code.
“not less than seventy-five (75) feet in height”
Individual on-site wastewater systems inside Richton town limits.
“The terms in this Chapter apply as stated unless otherwise specified for an Individual On-site Wastewater Disposal System (IOWDS) [...] Division – the Mississippi State Department of Health, Division of On-site Wastewater.”
Installation of an on-site wastewater disposal system or obtaining a water meter for a residence inside Richton town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Wastewater disposal from a residence inside Richton town limits.
“Mississippi does not recognize gray water.”
A permanent water-meter connection serving property inside Richton town limits.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property. If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
On-site wastewater components of subdivisions inside Richton town limits.
“Commercial Developments (Subdivisions, Manufactured, Multi-family, RV Campgrounds/Lodging Parks)”
MSDH on-site-wastewater applications for property inside Richton town limits.
Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Existing Residential Inspection: 100 USD · Subdivision application: 325 USD (plus $6.50 per lot)
“Subdivision is currently $325 + $6.50/lot”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Richton or Perry County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Richton publishes no rule on the point, not that none exists. Perry County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Richton means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.