Bolthole Index

Wexford County, Michigan

Building permits, zoning and land rules in Wexford County, Michigan

75Index Score / 100
#40 of 83 in Michigan

Wexford County, Michigan requires permits before covered construction begins in areas served by the county Building Department.1 Cedar Creek Township and the cities of Manton and Cadillac handle some or all construction permits locally, while zoning authority depends on the township, city or village.12 District Health Department #10 issues well and septic permits.3

At a glance

Building permit
Required before covered construction in county-served areas1
Building office
County department serves most areas; local exceptions apply1
Zoning
Varies by township, city or village2
Septic
Permit through District Health Department #103
Private well
Permit required through District Health Department #104
RV living
Not confirmed countywide; ask the parcel's zoning authority2
Owner-builder
No permit exemption confirmed; county lists a homeowner affidavit5
Agricultural building
Conditional exemption application; zoning approval comes first6

Who to call

Building permits

Wexford County Building Department

Building, electrical, mechanical and plumbing permits and inspections for most of Wexford County; county zoning contact information and applications

(231) 779-9465

401 North Lake St., Cadillac, MI 49601

Septic permits

District Health Department #10, Wexford County Environmental Health

Well and septic permit applications and environmental health review for Wexford County

Online permits →

Roads & driveways

Wexford County Road Commission

Driveway and right-of-way permits for county roads

[email protected]

85 W M115 Boon, MI 49618

Floodplain permits

Michigan EGLE Cadillac District Office

State environmental and floodplain permit questions for Wexford County

231-775-3960

120 West Chapin Street, Cadillac, MI 49601-2158

Online permits →

Contact details are copied from each office’s official page and were checked against it on September 27, 2026.

Do you need a building permit in Wexford County, Michigan?

Yes, covered work in areas served by the Wexford County Building Department requires a permit before construction starts.1 A one-story detached accessory structure under 200 square feet and less than 10 feet high is exempt from the building permit, but zoning approval may still be required.1

The county department does not issue building permits for Cedar Creek Township, the City of Manton or the City of Cadillac, so projects there go to the applicable local agency.1 Buildings used exclusively for agricultural purposes may use the county's conditional agricultural-exemption process, but zoning approval is required before the exemption application is submitted.6

Who issues building permits in Wexford County, and how do you reach them?

The Wexford County Building Department issues building, electrical, mechanical and plumbing permits for most of Wexford County.5 The office is at 401 North Lake St. in Cadillac and can be reached at (231) 779-9465.5

Cedar Creek Township and the City of Manton issue their own building permits, while the City of Cadillac issues its own building, mechanical, plumbing, electrical and soil-erosion permits.5 County-administered projects receive compliance inspections, and the county requires at least 24 hours' notice to schedule one.7 A homeowner acting as general contractor must submit the county's Homeowners Affidavit; that form is not a blanket exemption from permits.5

Does Wexford County have zoning?

Zoning in Wexford County varies by township, city and village rather than following one countywide answer.2 The Wexford Joint Planning Commission covers Antioch, Boon, Cherry Grove, Hanover, Liberty, Selma, Slagle, Springville, South Branch and Wexford townships.2 Colfax, Greenwood, Henderson and Harrietta are identified as having no zoning, while Cadillac, Manton, Mesick and Buckley have separate local contacts.2

A parcel's actual zoning authority should confirm permitted uses, setbacks, minimum lot size, building height and minimum dwelling size before plans are finalized because no single countywide numeric rule for those topics was confirmed.2 Michigan's framework allows counties, townships, cities and villages to establish zoning districts, so the applicable local ordinance controls.8

How do septic and well permits work in Wexford County?

District Health Department #10 issues well and septic permits for Wexford County.3 The district's Well & Septic program is the place to begin the environmental-health review.9 Michigan local health departments permit and inspect onsite sanitary wastewater systems under the statewide EGLE-coordinated program.10

Start the health review early: the county's published building sequence puts the well and septic permit before driveway and zoning approvals.11 The soil dataset rates 0% of county soils as free of severe limitations for a conventional septic drain field, so a parcel-specific evaluation matters and a standard layout should not be assumed.12 Private wells also require a health-department permit.4

Can you live in an RV or tiny home on your land in Wexford County?

We could not confirm a countywide rule allowing long-term RV occupancy, temporary private-land camping or tiny-home occupancy in Wexford County. Ask the township, city or village zoning authority for the parcel before buying land or moving a unit onsite because zoning administration varies across the county.2

A tiny house should not be treated as automatically exempt merely because it is on wheels: Michigan guidance for tiny houses used as resort cabins calls for applicable local well, septic, zoning, building, electrical and plumbing approvals.13 Sanitary sewage from toilets, sinks, showers, washing machines and dishwashers must go to a municipal sanitary sewer or an onsite septic system.14 District Health Department #10 can answer the onsite wastewater side of the proposal.3

Building a home in Wexford County: what are the steps?

The county's published order is a useful checklist for land in the county department's service area.11

  1. Obtain well and septic approval from District Health Department #10.11
  2. If a new driveway enters a county road, obtain the driveway permit from the Wexford County Road Commission; access onto a state highway goes through MDOT.15
  3. Take the health permit, property description, driveway permit, house plans and site plan to the appropriate zoning administrator.11
  4. Apply to the correct construction-code agency, which may be the county or a local exception in Cedar Creek Township, Manton or Cadillac.1
  5. Schedule required inspections with at least 24 hours' notice when the county administers the project.7
  6. Do not occupy a new or altered code-covered building until the code official issues the required Certificate of Occupancy.16

What should you check before buying land in Wexford County?

Confirm the parcel's zoning authority and proposed use first because Wexford County's township and municipal zoning arrangements vary.2 Confirm septic and well feasibility with District Health Department #10 before assuming a homesite will work; the county soil dataset rates 0% of soils as free of severe conventional drain-field limits.312

Check legal road access and obtain a Road Commission permit for a new county-road driveway.15 For floodplain land, construction, fill or alteration along a river, stream or drain with a drainage area of at least 2 square miles requires a state permit, and new residential construction is prohibited in the floodway.17 Wexford County's effective property-tax rate is about 1.2%, with a median annual bill of about $1,868.1819

Watch-outs

  • A small detached accessory building may avoid a building permit yet still need zoning approval.1
  • Published county application and inspection fees increased after May 21, 2025, so confirm the current amount directly with the Building Department.20
  • The countywide rules for permanent RV living, temporary camping and minimum dwelling size remain unconfirmed; ask the zoning authority for the specific parcel.2

Sources

  1. Building Department | Wexford County Michigan, quoted and re-checked
  2. Building Department | Wexford County Michigan, quoted and re-checked
  3. Well & Septic | District Health Department #10, quoted and re-checked
  4. Well & Septic | District Health Department #10, quoted and re-checked
  5. Wexford County Building Department (wexfordcounty.org)
  6. Building Department | Wexford County Michigan, quoted and re-checked
  7. Building Department | Wexford County Michigan, quoted and re-checked
  8. Michigan Zoning Enabling Act (Michigan statewide rule), quoted and re-checked
  9. District Health Department #10, Wexford County Environmental Health (dhd10.org)
  10. Michigan Guide to Environmental Regulations, Chapter 3: Wastewater (Michigan statewide rule), quoted and re-checked
  11. Wexford County Building Department Permit Information Packet, quoted and re-checked
  12. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  13. 2022 ARVC - General (Michigan statewide rule), quoted and re-checked
  14. Disposal of residential wastewater such as swimming pool water (Michigan statewide rule), quoted and re-checked
  15. Wexford County Building Department Permit Information Packet, quoted and re-checked
  16. Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
  17. FAQ: Floods and Floodplain Management, quoted and re-checked
  18. Effective property tax rate: Bolthole Index county data
  19. Median property tax bill: Bolthole Index county data
  20. Building Department | Wexford County Michigan, quoted and re-checked

Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Wexford County in Michigan

75
County map
Wexford County highlighted among the Michigan counties · colored by Index score

How Wexford County scores

Seclusion56100% ev.
Self-Sufficiency66100% ev.
Admin Boringness4190% ev.
Durability81100% ev.
Property Autonomy77100% ev.
Carry Cost80100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$242kTypical home
1.2%Property tax
$3,918Land / acre
35.5"Annual rain
1.4% of yrsSevere drought
0.7 / yr (+0.7)Mid-century 100°F days
10.3 daysMid-century dry spell
1.49" (+8.3%)Mid-century 1-day rain
1.58×Wildfire change factor
100%Forward climate coverage
$1,060Home insurance / yr
0.3% / yrInsurance growth
0.47%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
27,413People within 30 min
1,740,202People within 2 hr
39,570Radius comparison (15 mi)
60.4People / sq mi
26.8%Federal land
92%Land at 15% slope or less
0%Septic soil without severe limits
0 acWorkable land screen
77%Wooded land
50.1 tonsBiomass / forest ac
44.5°FAvg temp

Scout Wexford County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Wexford County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Wexford County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Wexford County rules

  • Building permitRequired

    Building, electrical, mechanical, and plumbing construction in areas served by the Wexford County Building Department.

    • The county department does not issue building permits for Cedar Creek Township, the City of Manton, or the City of Cadillac.
    • A one-story detached accessory structure under 200 square feet and less than 10 feet high does not need a permit.
    • Construction must not begin before the written permit application is filed.

    accessory structure area exemption: < 200 square feet (one-story detached accessory structure less than 10 feet high) · accessory structure height exemption: < 10 feet (one-story detached accessory structure under 200 square feet)

    “The State Construction Code requires a permit before any construction is started.”
  • Building code adoptedPartial

    Construction code enforcement by the Wexford County Building Department.

    • The county page identifies the 2015 Michigan Residential Code for residential construction and the 2021 Michigan Building Code for commercial construction.
    • The county page states that 2023 NEC and 2023 MEC take effect for electrical code as of March 12, 2024.
    • Cadillac, Manton, and Cedar Creek Township issue some or all of their own permits.
    “2015 Michigan Residential Code (in effect February 8, 2016) for residential construction, 2021 Michigan Building Code for commercial construction”
  • InspectionsRequired

    Construction inspected by the Wexford County Building Department.

    • Inspections are for compliance.
    • A minimum 24-hour notice is required for all inspections.
    • Local agencies may inspect in Cadillac, Manton, and Cedar Creek Township.

    inspection notice: >= 24 hours (all inspections administered by the county department)

    “Conduct inspections for compliance [...] A MINIMUM 24 HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. PLEASE CALL OUR OFFICE TO SCHEDULE AN INSPECTION: 231-779-9465”
  • Local zoningVaries (with conditions)

    Aggregate local zoning across Wexford County townships, cities, and villages.

    • The county page identifies Colfax, Greenwood, Henderson, and Harrietta as having no zoning.
    • The Wexford Joint Planning Commission includes Antioch, Boon, Cherry Grove, Hanover, Liberty, Selma, Slagle, Springville, South Branch, and Wexford Townships.
    • Cadillac, Manton, Mesick, and Buckley have separately identified local zoning contacts.
    • This is an aggregate conclusion and does not mean Wexford County administers every local ordinance.
    “Colfax, Greenwood, and Henderson Township- No Zoning [...] Wexford Joint Planning Commission: (Which includes Antioch, Boon, Cherry Grove, Hanover, Liberty, Selma, Slagle, Springville, South Branch, and Wexford Townships):”
  • Who permits septicLocal

    Wexford County service area of District Health Department #10.

    • District Health Department #10 is a multi-county health district serving Wexford County.
    • The district administers the well and septic permitting program.
    “District Health Department #10 issues well and septic permits to help protect public health and the environment.”
  • Well permitRequired

    Private and other regulated wells in Wexford County.

    • DHD#10 issues well permits and lists private, Type II, and Type III well permit categories.
    • Permit type and fees vary by well classification.

    private well permit fee: 180 USD (DHD#10 fee schedule also lists Type II and Type III categories)

    “District Health Department #10 issues well and septic permits to help protect public health and the environment.”
  • Agricultural exemptionConditional

    Buildings used exclusively for agricultural purposes in Wexford County areas served by the county building department.

    • The county page identifies an Agricultural Exemption Application.
    • The building must be used exclusively for agricultural purposes.
    • Zoning permit approval is required before submitting the agricultural exemption application.
    • Municipal or township rules may apply where those jurisdictions administer their own permits.
    “Agricultural Exemption Application -For any building used exclusively for agricultural purposes. (Zoning permit approval is required prior to submitting)”
  • Driveway accessRequired

    New construction requiring driveway access on a county road or state highway.

    • A driveway permit is obtained from the Wexford County Road Commission when access is on a county road.
    • A driveway permit is obtained from MDOT when access is on a state highway.
    “Driveway Permit: obtained from the Wexford County Road Commission [...] [Necessary ONLY IF a driveway needs to be put in]”
  • Permit feesPublished (with conditions)

    Wexford County Building Department permit fees in the reviewed published fee schedule.

    • The county page warns that application inspection fees increased as of May 21, 2025.
    • The packet lists an application fee of $60, a temporary certificate of occupancy fee of $100, and other project-specific fees.
    • The packet is an older published document; current fees should be confirmed with the department.

    application fee: 60 USD (published packet fee) · temporary certificate of occupancy: 100 USD (published packet fee) · foundation and safety inspection: 40 USD (published packet fee) · re-inspection: 40 USD (published packet fee)

    “Application Fee...............................................................$60.00 [...] Temporary Certificate of Occupancy......................... $100.00 [...] Re-inspections............................................................... $40.00”
  • Permit processPublished (with conditions)

    Building-permit process in areas served by Wexford County.

    • Step 1 is obtaining a well and septic permit from District #10 Health Department.
    • Step 2 is obtaining a driveway permit from the Wexford County Road Commission for a county road or from MDOT for a state highway.
    • Step 3 is taking health, property, driveway, house, and site plans to the appropriate zoning administrator.
    • Step 4 directs the applicant to the appropriate local agency for a zoning permit.
    • Municipal and township permitting authorities may differ.
    “Step 1: Contact the District #10 Health Department for a well and septic permit. [...] Step 2: Stop at the Wexford County Road Commission office (if on a county road) with a property description and site plan to obtain a driveway permit. [...] Step 3: Take the Health Department Permit, property description, driveway permit, house and site plans to the appropriate Zoning administrator for a Zoning Permit.”
  • County-wide zoningPresent

    The county has zoning administered largely through the Wexford Joint Planning Commission for ten townships (some townships have no zoning ordinance); the county Zoning office processes zoning, land-division, fence and sign permits.

    Wexford County MI Building Department / Zoning ↗Scouted from the county site, not yet independently re-checked

Michigan rules that apply here

  • Certificate of occupancyRequired

    A new building or altered building subject to the Michigan construction code.

    • The building or altered building may not be used or occupied until the code official issues a Certificate of Occupancy.
    • The permit holder or authorized agent must submit a written request after project completion.
    • The request must include applicable building, electrical, mechanical, plumbing, boiler, elevator, plan-review, and school fire-services project numbers.
    • The certificate cannot be issued until all fees are paid, permits are finaled, and permitted work is completed in accordance with the permit, code, and applicable laws and ordinances.
    • If an electrical, mechanical, plumbing, boiler, elevator, plan-review, or Fire Services project is not required, the request must state “not applicable.”
    “A new building or a building that is altered shall not be used or occupied until a Certificate of Occupancy is issued by the code official.”
  • Zoning districtsPartial

    Michigan's statutory zoning framework for counties, townships, cities, and villages; this does not identify the actual zoning districts adopted by each local government.

    • Actual zoning districts and district regulations are local and must be checked in the applicable county, township, city, or village ordinance.
    • The cited act's stated effective date is July 1, 2006.
    “to provide for the establishment in counties, townships, cities, and villages of zoning districts;”
  • Off-grid sanitationLimited

    Residential sanitary sewage disposal in Michigan without connection to a municipal sanitary sewer.

    • Sanitary sewage from toilets, sinks, showers, washing machines, and dishwashers must be directed to a municipal sanitary sewer or an onsite septic system.
    • An onsite septic system is subject to the EGLE-coordinated permitting and local-health-department permitting and inspection framework.
    • The source does not establish a statewide authorization for untreated discharge or arbitrary off-grid sanitation methods.
    “All sanitary sewage [...] must be directed to municipal sanitary sewer or to an onsite septic system.”
  • Mandatory utility hookupConditional

    Buildings and premises in Michigan that have plumbing fixtures or drainage piping.

    • Connection must be to a public sewer where available, or otherwise to an approved private sewage disposal system.
    • Plumbing work cannot begin until the appropriate enforcing agency issues a permit.
    • Local requirements may apply to water service and building sewer installation.
    “Every building in which plumbing fixtures are installed [...] shall be connected to a public sewer, where available, or an approved private sewage disposal system.”
  • Subdividing landRegulated (with conditions)

    Subdivision plats and the orderly development of subdivisions in Michigan.

    • The Michigan Office of Land Survey and Remonumentation administers applicable provisions of the Land Division Act, 1967 PA 288.
    • Staff conducts final reviews of plat maps for compliance with the Act.
    • Final plats are authorized for submission to the Register of Deeds for proper recordation.
    “Staff conducts final reviews of plat maps to ensure compliance with the Act and authorizes final plats to be submitted to the Register of Deeds for proper recordation.”
  • Building in a floodplainRequired

    Construction, fill, or alteration in a Michigan floodplain of a river, stream, or drain with a drainage area of at least 2 square miles, including applicable Wexford County sites.

    • A state floodplain permit is required for construction, fill, or alteration in the specified floodplain.
    • Construction may be permitted in non-floodway portions if local ordinances and building standards are met and compensating excavation is provided for fill.
    • New residential construction is prohibited in the floodway.
    • New construction or substantial improvement in the 100-year floodplain must have the lowest floor at least one foot above the flood elevation.

    drainage area threshold: >= 2 square miles (river, stream, or drain floodplain under Part 31) · lowest floor elevation: >= 1 foot above 100-year flood elevation (new construction or substantially improved buildings in the 100-year floodplain)

    “Any construction, fill or alteration of a floodplain of a river, stream, or drain which has a drainage area greater than or equal to 2 square miles will require a state floodplain permit under Part 31 of the Natural Resources and Environmental Protection Act.”
  • Campground & park staysLimited

    Tiny houses, including tiny houses built on wheels, proposed as resort cabins or similar occupancy in Michigan.

    • The source distinguishes tiny houses from recreational units and states they cannot be treated as recreational units even if built on wheels.
    • The tiny house must be built as a resort rather than a campground.
    • Local health department permitting for wells, septic tanks, and drainfields is required as applicable.
    • Local zoning, building, electrical, and plumbing permits and final approvals are required under local authorities.
    • The source does not establish statewide zoning permission or a statewide right to occupy a tiny house.
    “Local zoning, building, electrical, plumbing permits and final approvals under local authorities.”
  • county building authorityGeneral

    Michigan counties serving as building-code enforcing agencies for residential construction in unincorporated areas, subject to the Statewide Jurisdiction List and local/state jurisdiction assignments.

    • Before construction, a written building-permit application must be submitted to the appropriate enforcing agency.
    • A permit is also required when use or occupancy changes.
    • Ordinary repairs do not require a permit, but the stated structural, egress, plumbing, electrical, mechanical, and public-health/safety limitations apply.
    • The Michigan Building Code and Michigan Residential Code govern construction; county enforcement applies only where the Statewide Jurisdiction List designates county jurisdiction.
    “If COUNTY is indicated, that unit of government receives code enforcement services from a county enforcing agency.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-builder exemptions from permitting or licensing requirements.
  • Minimum dwelling size — Minimum dwelling size requirements in Wexford County.
  • Minimum lot size — Minimum lot size requirements in Wexford County.
  • Setbacks — Setback requirements in Wexford County.
  • Lot coverage — Lot-coverage requirements in Wexford County.
7 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Wexford County, Michigan

Is Wexford County a good place to live off-grid or homestead?

Wexford County scores 75/100 on the Bolthole Index, a strong county profile. Its strengths: mixed durability signals and manageable long-term carry cost. Watch-outs: more administrative friction around building and land use.

Do you need a building permit in Wexford County, Michigan?

Wexford County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by District Health Department No. 10 (Wexford County office) under Michigan EGLE. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Wexford County, Michigan?

Land in Wexford County runs about $3,918 per acre, based on the latest county data.

What is the water situation in Wexford County?

Wexford County gets about 35.5" of rain a year, with severe drought in roughly 1.4% of years.

How remote is Wexford County?

A representative private-land location has about 27,413 people within a 30-minute drive and 1,740,202 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Wexford County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Wexford compares in Michigan

Compare side-by-side →See all 83 Michigan counties ranked →