Wexford County, Michigan
Slagle Township is a township in Wexford County, Michigan. Slagle Township adopts its own zoning, so inside its limits Slagle Township’s rules apply, not the county’s. Septic permits inside Slagle Township come from Slagle Township. 12 rules below are quoted from official sources and independently re-checked, most recently on October 31, 2026. Rules for unincorporated land are on the Wexford County page.
Land inside Slagle township limits. Slagle township is a participating member of the Wexford Joint Planning Commission, which provides zoning for it under the joint zoning ordinance.
“wexford joint planning commission: (wexford, hanover, liberty, springville, antioch, slagle, boon, selma, south branch, cherry grove townships): robert hall/ben townsend 231-775-1138 ext 6”
Land inside Slagle township limits, under the Wexford Joint Planning Commission zoning map
“zoning map detail for slagle township zoning map detail for south branch township”
Slagle Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction inside Slagle township under the state construction code
“the state construction code requires a permit before any construction is started.”
“if a residential one-story detached accessory structure is under 200 square feet and less than 10 feet high, no building permit is required. zoning approved is still required.”
Permitted construction inside Slagle township, inspected by the Wexford County building department
“certificate of occupancy final inspections are conducted when notification from the permit holder is received that the construction is completed under the permit.”
Buildings constructed under a building permit inside Slagle township, issued by the Wexford County building department
temporary certificate of occupancy fee: 100 USD
“when all construction permits have received a final approval and the construction is entitled to a certificate of occupancy as provided by the state construction code act, a certificate of occupancy shall be issued by the enforcing agency.”
Septic systems on land inside Slagle township, through Wexford/Missaukee County District #10 Health Department
“step 2: well/septic permit. contact the wexford/missaukee county district #10 health department for a well and septic permit or waiver if already existing.”
New septic systems on land inside Slagle township
“step 2: well/septic permit. contact the wexford/missaukee county district #10 health department for a well and septic permit or waiver if already existing.”
New wells on land inside Slagle township
“step 2: well/septic permit. contact the wexford/missaukee county district #10 health department for a well and septic permit or waiver if already existing.”
New driveway access for a home in Slagle township: Wexford County Road Commission if on a county road, MDOT if on a state highway
“step 3: driveway permit. contact the wexford county road commission (if on a county road) or mdot (if on a state highway) to obtain a driveway permit or waiver if already existing.”
Building permit fees for construction in Slagle township, Wexford County building department schedule
temporary certificate of occupancy fee: 100 USD
“there is a $100.00 fee for a temporary certificate of occupancy. they do expire after 3 months of issuance.”
Building permit process for construction in Slagle township
“steps to obtaining a building permit in wexford county: step 1: zoning permit. contact the appropriate local agency to obtain a zoning permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Slagle Township or Wexford County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Slagle Township publishes no rule on the point, not that none exists. Wexford County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Slagle Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.