Menominee County, Michigan requires building permits, with the county Building Code Department enforcing the building code outside the cities of Menominee and Stephenson1,2. Township or village zoning approval comes first where required, and local standards vary3. Public Health, Delta & Menominee Counties issues septic permits4.
Do you need a building permit in Menominee County, Michigan?
Yes.
Yes. Menominee County requires building permits, and its Building Code Department reviews plans and issues permits in the jurisdictions assigned to the county1,10. The cities of Menominee and Stephenson operate local building-code programs; the county program covers the villages of Carney, Daggett and Powers and the listed townships2. The current statewide framework is the Michigan Building Code, with residential requirements in the Michigan Residential Code5. The county department reviews drawings before issuing a building permit, and the county publishes a fee schedule rather than one flat price9,10. A new or altered building cannot be occupied until the code official issues a certificate of occupancy11.
Who issues Menominee County building permits, and how do you reach them?
For projects under county jurisdiction, the Menominee County Building Code Department is at S904 US HWY 41, Stephenson, MI 49887, and its listed phone number is (906) 863-7779.
For projects under county jurisdiction, the Menominee County Building Code Department is at S904 US HWY 41, Stephenson, MI 49887, and its listed phone number is (906) 863-777910. A parcel inside the city of Menominee or Stephenson instead goes through that city's local building-code program2. Before submitting a county building-permit package, identify the township, obtain township zoning approval where required, and secure any needed well or septic approval12. A Soil Erosion Sedimentation Control application is also required when work is within 500 feet of water or changes more than 1 acre of earth12. For driveway or right-of-way work under Road Commission jurisdiction, use Oxcart after checking which municipality controls the road segment13.
Does Menominee County have zoning?
Zoning depends on the parcel's township or village, and a zoned township's approval is required before the county building-permit application.
Zoning depends on the parcel's township or village, and a zoned township's approval is required before the county building-permit application3. Cedarville's minimum lot size is 1 acre in its A/F/R districts and 0.5 acre in LS/R, while its schedule lists no minimum for TD/C6. Cedarville's setback schedule contains an internal unit problem—it labels the columns in feet but gives the entries as 10%—so obtain a written interpretation from the township before laying out a structure6. Ingallston requires at least 720 square feet for a single-family dwelling, including a mobile home, and sets district-specific minimum lots, setbacks and a 30-foot height limit7. These standards are local, not countywide3.
How do septic and well permits work in Menominee County?
Public Health, Delta & Menominee Counties' Environmental Health Division issues Menominee County septic permits.
Public Health, Delta & Menominee Counties' Environmental Health Division issues Menominee County septic permits4. Its Menominee office is at 909 Tenth Avenue, Menominee, MI 49858, and the phone number is 906-863-44514. For vacant land, begin with a raw-land evaluation; if the site is not physically altered, that evaluation remains valid for 5 years, and the resulting new-system permit is valid for 2 years4. Only 30.5% of county soils are rated without severe limits for a conventional drain field, and the evaluation determines whether a conventional gravity system or pressurized mound system is needed4,14. Existing systems also receive specific review for property transfers, added sewage flow or connection to a replacement dwelling4. New and replacement private-well permits are valid for 2 years15.
Can you live in an RV or tiny home on your land in Menominee County?
A countywide RV-occupancy rule could not be confirmed, so ask the parcel's township or village.
A countywide RV-occupancy rule could not be confirmed, so ask the parcel's township or village. Cedarville Township allows a state-licensed or registered RV as the principal structure where no other principal structure exists, subject to an annual township permit and county and state building, health and safety rules6. Ingallston Township allows a licensed or registered RV as a principal structure for no more than 6 months; parking or storage must meet accessory-building setbacks and preserve motorists' sight lines7. A tiny house does not gain automatic approval merely by being built on wheels; local zoning and construction approvals still apply16. Off-grid sanitation also needs approval: an earthen-pit privy requires acceptable soil information, while a watertight vaulted privy avoids the soil evaluation, and either type requires a privy permit valid for 2 years4.
Building a home in Menominee County: the steps, in order
Identify the parcel's township, village or city, and obtain local zoning approval where required.
- Identify the parcel's township, village or city, and obtain local zoning approval where required3,12.
- For a vacant septic site, request a raw-land evaluation from Public Health, Delta & Menominee Counties, then obtain the required septic permit; apply there for any needed well permit too4,15.
- File a Soil Erosion Sedimentation Control application if work is within 500 feet of water or changes more than 1 acre of earth12.
- Apply to the county Building Code Department unless the parcel is inside the city of Menominee or Stephenson, which has a local program2.
- Determine road jurisdiction and use Oxcart for Road Commission driveway or right-of-way work13.
- Complete inspections and obtain the certificate of occupancy before using the building11.
What should you check before buying land in Menominee County?
Start with the parcel's township or village because local zoning controls lot size, setbacks, dwelling size and RV use where an ordinance applies.
Start with the parcel's township or village because local zoning controls lot size, setbacks, dwelling size and RV use where an ordinance applies3. Confirm septic feasibility early: only 30.5% of county soils are rated without severe limits for a conventional drain field, and vacant land normally begins with a raw-land evaluation4,14. For a property with an existing septic system, ask whether the proposed transfer, added bedroom, increased flow or replacement dwelling triggers an evaluation4. Menominee County is 76.2% wooded, and 98.5% of its land has a slope of 15% or less, but parcel-level clearing, drainage and access still need inspection14. Confirm road jurisdiction before applying for driveway work13.
Watch-outs
- The county says seven townships have zoning ordinances but its published list contains six townships and the Village of Powers; confirm the parcel's current zoning authority directly3.
- Do not treat Ingallston's campground rule as permission to occupy a single RV indefinitely; the township separately limits an RV used as a principal structure to 6 months7.
- Cedarville's setback table labels its columns in feet but gives the entries as percentages; obtain a written township interpretation before siting a building6.
Sources
16 official pages, each quoted and re-checked · written October 10, 2026
- Menominee County - Building Code Department (2026 county census)
- Statewide Jurisdiction List
- menomineecountymi.gov
- On-Site Sewage Treatment/Disposal
- Code Books
- Cedarville Township Zoning Ordinance
- Ingallston Township Zoning Ordinance
- Frequently Asked Questions – Residential Builder (RB)
- Costs & Fees
- Menominee County Building Code Department (menomineecountymi.gov)
- Certificate of Occupancy Request (Michigan statewide rule)
- How to apply for a Building Permit
- Road Commission Permits
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Water Well Program
- michigan.gov (Michigan statewide rule)
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Menominee County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.