Unincorporated Wicomico County, Maryland requires building permits for homes and structural work; ordinary non-structural repairs are exempt1. County zoning applies outside incorporated municipalities; Salisbury and Delmar administer their own building permits and zoning2,3,4,5,6. Septic and well permits stay with Wicomico County Health Department; Delmar subdivision sewer alternatives also need Town and state health approval7,8.
Do you need a building permit in Wicomico County, Maryland?
Unincorporated Wicomico County, Maryland requires building permits for homes, additions, structural alterations and detached accessory buildings, including sheds of any size; ordinary non-structural repairs and replacements are exempt.
Unincorporated Wicomico County, Maryland requires building permits for homes, additions, structural alterations and detached accessory buildings, including sheds of any size; ordinary non-structural repairs and replacements are exempt1. Decks more than 30 inches above grade, swimming pools and hot tubs also need building permits1. Wicomico County adopted an International Building Code amendment effective July 7, 2025; ask Permits and Inspections which edition and local amendments apply to your plans12,13. A homeowner may obtain the required building permits and personally perform residential construction, accepting liability and responsibility for code compliance1. Starting before building-permit issuance can trigger a fee of 4 times the regular rate at the Chief Building Inspector’s discretion1. Qualifying farm buildings still need a building permit and every inspection; the exemption waives only the county permit fees, and only for buildings necessary to a farm operation, used for agriculture and classifiable as Group U11. In mapped floodplain areas, development also needs a floodplain permit alongside the building permit14.
Who is the Wicomico County building department, and how do you reach them?
Wicomico County's Permits, Inspections, Licenses and Fire Protection office handles building permits for unincorporated Wicomico County, Maryland.
Wicomico County's Permits, Inspections, Licenses and Fire Protection office handles building permits for unincorporated Wicomico County, Maryland13. Reach the office at 410-548-4810, or by email at permits@wicomicocounty.org13. In person, the office is in Room 201 of the Government Office Building at 125 N. Division Street in Salisbury13. Applications can be submitted by email, and residential applicants should use the county's Residential Permit Application and Minimum Plan Submittal Requirements13. Salisbury issues its own building permits; Delmar also administers building permits, with a Town public-facilities agreement required for covered development or subdivisions3,5. Septic permits remain with Wicomico County Health Department throughout the county; Delmar subdivision sewer alternatives also require Town discretion and state and county health approval7,8. Depending on the project, you may also need zoning, sediment-control, forest-conservation, critical-area, or floodplain approval alongside the building permit, and some of those carry their own fees1.
Does Wicomico County have zoning?
Wicomico County zoning applies to unincorporated land; use the official county zoning map to identify a parcel’s district and overlays.
Wicomico County zoning applies to unincorporated land; use the official county zoning map to identify a parcel’s district and overlays2,15. The official zoning map is the final authority on a parcel’s zoning status, and zoning applications carry county fees that must be paid before the county acts2. Chapter 225, the zoning chapter, was amended effective May 5, 2026, so use the current text rather than older copies2. Salisbury and the Maryland portion of Delmar have their own zoning; Delmar’s regulations were adopted jointly with Delmar, Delaware4,6,16. Wicomico County Health Department still handles on-site septic permits within the county, including municipal addresses7. Minimum lot size, setbacks, height and lot coverage depend on district and use2. Setbacks run from the property line or street right-of-way line as specified by the code; ask Planning which line controls before locating a building2,10. A-1 single-family detached homes have a 35% maximum lot coverage2. A one-bedroom house must have at least 446 interior square feet and 528 exterior square feet11. Dividing unincorporated Wicomico County land into 2 or more lots or sites for sale or building development falls under Chapter 200 subdivision review, which may involve Planning Commission and Health Department review17. Call Planning at 410-548-4860 for parcel-specific requirements10.
How do septic permits work in Wicomico County?
The Wicomico County Health Department administers septic systems throughout the county and permits and inspects every on-site sewage disposal system.
The Wicomico County Health Department administers septic systems throughout the county and permits and inspects every on-site sewage disposal system7. A new sewage permit costs $500 and a replacement permit costs $300, separate from the $150 site-plan review fee18. Maryland requires the permit before construction begins, and renewal may be needed after 2 years19. Soils make this an early planning question: 0% of Wicomico County soils rate free of severe limits for a conventional drain field, so arrange a site evaluation before fixing the house location or budget9. Where community water and sewer are impractical in a subdivision, the proposed individual system needs Health Officer review or a completed soils evaluation20. The same Health Department permits and inspects wells, and the county building-permit application lists a $160 well-permit fee7. Reach Environmental Health at 410-546-44467.
Can you live in an RV or tiny home on your land in Wicomico County?
Wicomico County defines a recreational vehicle park for temporary occupancy of no more than 30 days, while its residential parking and storage rule does not authorize living in an RV.
Wicomico County defines a recreational vehicle park for temporary occupancy of no more than 30 days, while its residential parking and storage rule does not authorize living in an RV2. Campgrounds and RV parks require a Board of Appeals special exception in the A-1 and V-C districts, so that rule does not answer informal camping on a private lot21. We could not confirm a general private-lot RV occupancy rule in Wicomico County; ask Planning, Zoning and Community Development10. Maryland’s protection for placing a new home in a zone allowing single-family residential use covers qualifying statutory modular dwellings and manufactured homes; other applicable local and state approvals still apply22. Under the county amendment adopted in 2026, a qualifying modular home is permitted by right in the A-1, V-C, R-8, R-15, R-20, R-30 and TT districts and by special exception in REC, and the home goes through the ordinary building-permit process; a self-propelled RV does not qualify, and homeowners-association covenants can still prohibit the structure23. A double-wide manufactured home in R-8 needs a Board of Appeals special exception and must be at least 40 feet long and 24 feet wide24. A manufactured-home park in A-1 or V-C requires a Planning Commission special exception, a development plan and a county license before occupancy25.
How do you build a home in Wicomico County, Maryland?
Confirm whether county or municipal zoning applies, then verify the parcel's district, setbacks, height, lot coverage and allowed home type with Planning.
- Confirm whether county or municipal zoning applies, then verify the parcel's district, setbacks, height, lot coverage and allowed home type with Planning2,10,26.
- If you are dividing land, ask about review under the county subdivision chapter17.
- For a septic system or well, contact Environmental Health before the building application; Wicomico County cannot issue a building permit without a valid health permit when plumbing, well or septic work is involved1,7.
- Submit the residential building permit application and minimum plan materials in person or by email to Permits and Inspections13.
- Ask the permit office for the actual fee; the published square-foot figures estimate construction cost used in the calculation, not the permit fee itself27.
- For all development within mapped floodplain areas, obtain a floodplain development permit alongside applicable building or grading permits; wait for building-permit issuance and arrange project-specific inspections1,14.
What should you check before buying land in Wicomico County, Maryland?
Confirm whether county or municipal zoning applies before making an offer, then ask Planning for the parcel's district, uses, setbacks, height and lot-coverage limits.
Confirm whether county or municipal zoning applies before making an offer, then ask Planning for the parcel's district, uses, setbacks, height and lot-coverage limits2,10,26. Arrange a site evaluation before counting on a conventional septic system: 0% of Wicomico County's soils rate free of severe limits for a conventional drain field9. All development within mapped Wicomico County floodplain areas requires a floodplain permit alongside applicable building or grading permits, and federally backed mortgage holders in a Flood Hazard Area must carry flood insurance14. Properties outside Salisbury seeking Salisbury utility service under the county-hosted extension policy need an Out of Town Service Agreement and must connect to both public water and sewer when available28. A new or upgraded entrance onto a county-maintained road needs an entrance permit from the Wicomico County Roads Division, which must be contacted before installation so roadside drainage is not affected20. The pipe-installation application, last updated in 2015, lists a $150 inspection and stakeout fee, and a nonstandard design adds a $350 County Engineer review29. A driveway built or modified within a state right-of-way requires coordination and a permit from the applicable MDOT State Highway Administration district office30. The effective property tax rate is about 0.9%, with a median annual bill near $2,1209.
Watch-outs
- Wicomico County's soils rate 0% free of severe limits for a conventional septic drain field, so make the site evaluation an early purchase contingency9.
- Wicomico County’s accessory-dwelling-unit amendment (Legislative Bill 2026-08) states an effective date of October 19, 2026, so confirm the accessory-apartment rules now in force with Planning, Zoning and Community Development before you plan one2.
- We could not confirm Wicomico County's rule for private-lot RV occupancy; ask Planning, Zoning and Community Development directly10.
- A driveway entrance onto a county road needs a permit from the Wicomico County Roads Division before construction starts20.
- Farm buildings are exempt only from county permit fees, not from the building permit or inspections11.
Sources
30 official pages, each quoted and re-checked · written October 26, 2026
- Residential Permits Frequently Asked Questions
- Wicomico County Zoning Code
- Salisbury: Building Permit Guidelines and Procedures (Wicomico County)
- Salisbury: Salisbury Municipal Code § 17.160.060 — Development standards (Wicomico County)
- Town of Delmar: Chapter 461: Public Improvements - Town of Delmar, MD (Wicomico County)
- Town of Delmar: Chapter 10: Planning and Zoning Regulations - Town of Delmar, MD (Wicomico County)
- Environmental Health
- Town of Delmar: Article XXV: Subdivisions - Town of Delmar, MD (Wicomico County)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Wicomico County Planning, Zoning and Community Development (wicomicocounty.org)
- Bill 2015-09, Chapter 117 Building Code
- Legislative Bill 2025-05 Enrolled
- Wicomico County Permits, Inspections, Licenses and Fire Protection (wicomicocounty.org)
- Floodplain
- Zoning
- Town of Delmar Planning & Zoning Regulations
- Subdivision of Land | Wicomico County, MD
- Application for Building Permit
- COMAR 26.04.02.03 On-Site Sewage Disposal Permits (Maryland statewide rule)
- Preliminary Subdivision Plat Checklist
- Wicomico County Table of Permitted Uses, Part I
- Maryland Land Use Article § 4-104
- wicomicocounty.org
- Wicomico County Table of Permitted Uses, Part I
- Wicomico County Table of Permitted Uses, Part I
- Wicomico County Zoning Code
- Building Permit Fees
- Salisbury Water and Sewer Extension Policy
- Residential/Agricultural Pipe Installation Application
- Access Management/Permits - MDOT SHA (Maryland statewide rule)
Written October 26, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Wicomico County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.