Bolthole Index

Wicomico County, Maryland

Building permits, zoning and septic rules in Wicomico County, Maryland

68Index Score / 100
#4 of 24 in Maryland

Wicomico County, Maryland requires a building permit for new construction, additions and most structural work, though ordinary non-structural repairs don't need one1. The county's zoning code sets district-by-district rules for lot size, use and setbacks in unincorporated areas2. Septic systems and wells are permitted and inspected by the Wicomico County Health Department's Environmental Health division3. A homeowner can pull the permits and do the work personally, but takes on full liability and code-compliance responsibility for doing so4.

At a glance

Building permit
Required for most new construction, additions and structural work; not required for ordinary non-structural repairs1
Zoning
Yes — district-specific lot size, use and setback rules apply2
Septic
County Health Department's Environmental Health division permits and inspects3
Wells
Also permitted and inspected by the Health Department; the fee is $1605
Owner-builder
Allowed if the homeowner pulls the permit and accepts full liability for the work4
Septic soils
0% of soils rate free of severe limits for a conventional drain field; get a site evaluation early6
RV occupancy
Private-lot occupancy is unconfirmed; campgrounds and RV parks are defined for stays of no more than 30 days7
Nearest city of 100,000+
About 83 miles away, straight-line8

Who to call

Building permits

Wicomico County Permits, Inspections, Licenses and Fire Protection

Building permits, plan review, inspections, licensing and fire-code review for unincorporated Wicomico County

410-548-4810

[email protected]

Room 201, Government Office Building, 125 N. Division Street, Salisbury, MD 21801

Planning & zoning

Wicomico County Planning, Zoning and Community Development

Zoning district questions, rezoning, subdivision and site-plan review for unincorporated Wicomico County

410-548-4860

[email protected]

Health department

Wicomico County Health Department, Environmental Health

Septic and well construction permits, inspections, perc tests and subdivision water/sewage review for Wicomico County

410-546-4446

[email protected]

108 East Main Street, Salisbury, MD 21801

Contact details are copied from each office’s official page and were checked against it on September 29, 2026.

Do you need a building permit in Wicomico County, Maryland?

Wicomico County, Maryland requires a building permit for all single- and multi-family dwellings and for interior or exterior structural alterations or repairs1. A permit is not required for ordinary repairs and replacements that are non-structural1. Permits are required for new additions, detached accessory buildings including sheds of any size, structural alterations, swimming pools, decks more than 30 inches above grade, bay windows, dormers, screen porches, sunrooms, stoops, and hot tubs1. Starting work before Wicomico County issues the permit can trigger a fee of four times the regular rate at the Chief Building Inspector's discretion, so apply first9. Wicomico County adopted its current building-code legislation in 202510.

Who is the Wicomico County building department, and how do you reach them?

Wicomico County's Permits, Inspections, Licenses and Fire Protection office handles building permits for unincorporated Wicomico County, Maryland11. Reach the office at 410-548-4810, or by email at [email protected]11. In person, the office is in Room 201 of the Government Office Building at 125 N. Division Street in Salisbury11. Applications can be submitted by email, and residential applicants should use the county's Residential Permit Application and Minimum Plan Submittal Requirements12. Depending on the project, you may also need zoning, sediment-control, forest-conservation, critical-area, or floodplain approval alongside the building permit, and some of those carry their own fees9.

Does Wicomico County have zoning?

Yes: Wicomico County's Planning, Zoning and Community Development department administers a countywide zoning code covering rezoning, subdivision, and site-plan review2. Zoning districts here include A-1 Agricultural-Rural, several residential districts (R-8, R-15, R-20, R-30), and a range of commercial and industrial classifications1314. Minimum lot size is district-specific: an A-1 single-family lot needs at least 20,000 square feet, while R-30 development needs at least 30,000 square feet, and every new lot must also meet the Health Department's own lot-size requirement if that number is larger14. Lot coverage is capped by district too, typically 35% for a detached single-family home15. An accessory apartment is allowed as a special exception on a lot with a single-family or two-family home, but only one per lot and no more than 50% of the size of the main house16. Reach the Planning, Zoning and Community Development department at 410-548-4860 to confirm the district and requirements for a specific parcel17.

How do septic permits work in Wicomico County?

Septic systems anywhere in Wicomico County need a permit from the county Health Department's Environmental Protection Division, which permits and inspects all on-site sewage disposal systems3. A new sewage permit costs $500 and a replacement permit costs $300, separate from the $150 site-plan review fee18. Maryland law requires that permit before construction begins and limits it to no more than 2 years before renewal may be needed19. Soils make this a central planning question for a Wicomico County lot: 0% of the county's soils rate free of severe limits for a conventional septic drain field, so arrange the site evaluation before committing to a house location or budget6. When a subdivision cannot use community sewer and water, Wicomico County requires Health Officer review of a proposed individual system or a completed soils evaluation20. Reach Environmental Health at 410-546-4446, at 108 East Main Street in Salisbury21.

Can you live in an RV or tiny home on your land in Wicomico County?

Wicomico County's zoning code defines a recreational vehicle park as land for temporary RV occupancy of not over 30 days, and it defines a campground the same way7. The code allows parking or storing an RV in a residential district's buildable area, but that provision does not answer whether someone may live in the RV on a private lot7. We could not confirm the private-lot RV occupancy rule or a specific Wicomico County rule for tiny-home occupancy. Call Planning, Zoning and Community Development at 410-548-4860 with the parcel number and proposed use before buying land or placing either type of unit17.

How do you build a home in Wicomico County, Maryland?

  1. Confirm the zoning district for your parcel with the Planning, Zoning and Community Development department, since minimum lot size and setbacks are district-specific1714.
  2. If the lot will use a septic system or a well, contact the county Health Department's Environmental Health division before applying for the building permit; Wicomico County cannot issue a building permit without a valid health permit when plumbing, well, or septic work is involved2122.
  3. Submit a residential building permit application to Permits, Inspections, Licenses and Fire Protection, in person at 125 N. Division Street or by email to [email protected]1112.
  4. Ask the permit office to calculate the fee. Wicomico County publishes square-foot construction-cost estimates used in that calculation, but those estimates are not the permit fee itself23.
  5. Start construction only after the permit is issued: starting early can quadruple the fee at the Chief Building Inspector's discretion9.
  6. If any part of the project falls in the floodplain, get a floodplain permit alongside the building or grading permit24.
  7. Schedule required inspections; if the home uses a well, Wicomico County requires a Health Department approval letter for the Certificate of Occupancy and Use22.

What should you check before buying land in Wicomico County, Maryland?

Confirm the zoning district for a specific parcel with Planning, Zoning and Community Development before making an offer, since minimum lot size, use, and setbacks are district-specific1714. Arrange a site evaluation before counting on a conventional septic system: 0% of Wicomico County's soils rate free of severe limits for a conventional drain field6. Farm accessory buildings still need a building permit and inspections even when the county waives the permit fee25. Properties outside Salisbury seeking Salisbury utility service under the county-hosted extension policy need an Out of Town Service Agreement and must connect to both public water and sewer when available26. We could not confirm whether Wicomico County generally requires a driveway-access permit for a county road; a driveway built or modified within a state right-of-way requires coordination and a permit from the applicable MDOT State Highway Administration district office27. About 56% of Wicomico County is wooded, and all county land is at a 15% slope or gentler2829. Farmland value averages about $7,641 an acre, while the typical home value is about $278,4783031. The effective property tax rate is about 0.9%, with a median annual bill near $2,1203233. The nearest city of 100,000 or more is about 83 miles from the county's center in a straight line8.

Watch-outs

  • Wicomico County's soils rate 0% free of severe limits for a conventional septic drain field, so make the site evaluation an early purchase contingency6.
  • Wicomico County adopted a new accessory-dwelling-unit amendment (Legislative Bill 2026-08) with an effective date of October 19, 2026, so confirm the current accessory-apartment rules with Planning, Zoning and Community Development before you plan one16.
  • We could not confirm Wicomico County's rules for private-lot RV occupancy, tiny-home occupancy, or a general driveway-access permit on county roads; ask Planning, Zoning and Community Development directly17.

Sources

  1. Residential Permits Frequently Asked Questions (2026 county census)
  2. Wicomico County MD - Planning, Zoning and Community Development (2026 county census)
  3. Environmental Health (2026 county census)
  4. Residential Permits Frequently Asked Questions (2026 county census)
  5. Environmental Health, quoted and re-checked
  6. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  7. Wicomico County Zoning Code, quoted and re-checked
  8. Distance to the nearest metro area: Bolthole Index county data
  9. Residential Permits Frequently Asked Questions, quoted and re-checked
  10. Legislative Bill 2025-05 Enrolled, quoted and re-checked
  11. Wicomico County Permits, Inspections, Licenses and Fire Protection (wicomicocounty.org)
  12. Permits, Inspections, Licenses and Fire Protection, quoted and re-checked
  13. Publications, quoted and re-checked
  14. Wicomico County Zoning Code, quoted and re-checked
  15. Wicomico County Zoning Code, § 225-74 Schedule of District Regulations, quoted and re-checked
  16. Wicomico County Zoning Code, quoted and re-checked
  17. Wicomico County Planning, Zoning and Community Development (wicomicocounty.org)
  18. Application for Building Permit, quoted and re-checked
  19. COMAR 26.04.02.03 On-Site Sewage Disposal Permits (Maryland statewide rule), quoted and re-checked
  20. Preliminary Subdivision Plat Checklist, quoted and re-checked
  21. Wicomico County Health Department, Environmental Health (wicomicohealth.org)
  22. Wicomico County Building Inspector Job Description, quoted and re-checked
  23. Building Permit Fees, quoted and re-checked
  24. Floodplain, quoted and re-checked
  25. Bill 2015-09, Chapter 117 Building Code, quoted and re-checked
  26. Salisbury Water and Sewer Extension Policy, quoted and re-checked
  27. Access Management/Permits - MDOT SHA (Maryland statewide rule), quoted and re-checked
  28. Wooded share of land: Bolthole Index county data
  29. Share of land at 15% slope or less: Bolthole Index county data
  30. Farmland value per acre (USDA census): Bolthole Index county data
  31. Typical home value (Zillow): Bolthole Index county data
  32. Effective property tax rate: Bolthole Index county data
  33. Median property tax bill: Bolthole Index county data

Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Wicomico County in Maryland

68
County map
Wicomico County highlighted among the Maryland counties · colored by Index score

How Wicomico County scores

Seclusion41100% ev.
Self-Sufficiency73100% ev.
Admin Boringness55100% ev.
Durability79100% ev.
Property Autonomy43100% ev.
Carry Cost64100% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$278kTypical home
0.9%Property tax
$7,641Land / acre
45.8"Annual rain
3.4% of yrsSevere drought
2.8 / yr (+2.7)Mid-century 100°F days
13.3 daysMid-century dry spell
2.47" (+4.2%)Mid-century 1-day rain
1.36×Wildfire change factor
100%Forward climate coverage
$1,307Home insurance / yr
1.3% / yrInsurance growth
0.87%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
134,736People within 30 min
1,342,411People within 2 hr
121,491Radius comparison (15 mi)
279.9People / sq mi
2.2%Federal land
100%Land at 15% slope or less
0%Septic soil without severe limits
0 acWorkable land screen
55.5%Wooded land
71.9 tonsBiomass / forest ac
57.3°FAvg temp

Scout Wicomico County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Wicomico County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Wicomico County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Wicomico County rules

  • Building permitLimited

    Residential construction projects, including single-family and multi-family dwellings and interior or exterior structural alterations or repairs in Wicomico County.

    • A permit is not required for ordinary repairs and replacements that are non-structural.
    • Exterior projects listed by the County as requiring permits include new additions, detached accessory buildings including sheds of all sizes, structural alterations, swimming pools, decks more than thirty (30) inches above grade to the floor of the deck, bay windows, dormers, screen porches, sunrooms, stoops, and hot tubs.
    • Building-permit projects may also require zoning approvals related to height and setback distance, sediment-control approval when disturbed-land limits are exceeded, forest-conservation, critical-area, and floodplain approvals; some approvals require additional fees.
    • The County advises homeowners and contractors to contact Permits and Inspections in advance to verify project-specific requirements.
    • Work started before permit issuance is subject to elevated fees of four (4) times the regular fee at the discretion of the Chief Building Inspector, and continuing violations may result in civil citations.

    deck height threshold: > 30 inches above grade to floor of deck · pre-permit work fee: 4 times regular fee (At the discretion of the Chief Building Inspector)

    “A permit is required for all single and multi family dwellings, interior and exterior structural alterations or repairs. A permit is not required for ordinary repairs and replacements that are non-structural.”
  • Owner-builder exemptionConditional

    Residential construction projects where the homeowner personally performs the construction and applies for the required permits.

    • The homeowner must agree to accept all liabilities of the work performed.
    • The homeowner assumes responsibility for compliance with applicable codes.
    • This is a conditional owner-builder pathway, not an exemption from obtaining required permits.
    “A homeowner may perform the construction and pull the permits if they agree to accept all liabilities of the work to be performed. If a homeowner applies for a permit(s), then the homeowner assumes responsibility for the work being in compliance with applicable codes.”
  • Building code adoptedAdopted (with conditions)

    Building-code adoption by Wicomico County for buildings within the corporate limits of Wicomico County, subject to stated exemptions and later-edition promulgation procedures.

    • The adopted IBC is identified in the enrolled bill as the 2015 2021 Edition, including appendices, incorporated by reference.
    • The provisions are controlling for all buildings within the corporate limits of Wicomico County unless otherwise exempted.
    • Within 90 days of promulgation of a new IBC edition, the Chief Building Inspector must review it and notify the County Executive and County Council of recommended modifications, if any.
    • 180 days following that notification, provisions of the new edition not modified by law are adopted by reference, except provisions conflicting with codified modifications.
    • Until a new IBC edition is promulgated and adopted under the stated procedure, the former edition remains the county building code.
    • Legislative Bill 2025-05 was adopted May 8, 2025 and became effective July 7, 2025.

    International Building Code edition: 2015 2021 Edition (Including appendices and subject to codified modifications and exemptions) · new-edition review period: 90 days (After promulgation of a new edition by the International Code Council) · automatic adoption period: 180 days (Following notification by the Chief Building Inspector; only provisions not modified by law)

    “Legislative Bill 2025-05 - An Act to amend Chapter 117 of the Wicomico County Code titled “Building Construction” [...] Adopted: May 8, 2025”
  • Certificate of occupancyLimited

    Residential and commercial construction projects for which Wicomico County issues certificates of occupancy; specific additional requirements apply to Certificate of Occupancy and Use where a well is involved.

    • The County Building Inspector issues residential and commercial certificates of occupancy.
    • For a Certificate of Occupancy and Use, a letter of approval from the Wicomico County Health Department for use of the well is required.
    • A building permit cannot be issued without a valid health permit when plumbing, well, or septic issues are involved in the project scope.
    • The cited sources do not establish that a certificate of occupancy is required for every type of county construction or every minor repair.
    “A letter of approval from the Health Department for the use of the well is a requirement for a Certificate of Occupancy and Use.”
  • Zoning districtsPublished (with conditions)

    Wicomico County zoning districts and associated permitted uses, development requirements, and restrictions, subject to municipal boundaries and any separately administered municipal zoning.

    • The county identifies its zoning code as a detailed description of county zoning districts, permitted uses, development requirements, and restrictions.
    • The county GIS zoning layer publishes classifications including A-1 Agricultural-Rural, C-1 Select Commercial, C-2 General Commercial, C-3 Regional Commercial, CID Corporate Industrial District, I-1 Light Industrial, I-2 Heavy Industrial, LB-1 Light Business and Institutional, LB-2 Light Business and Residential, R-8 Residential, and R-15 Residential.
    • The county publication separately identifies the Salisbury Zoning Code as administered by the City of Salisbury; this claim does not treat municipal zoning as county-administered.
    • The county publication states that the current printed county zoning code edition is from March 2003, while the GIS layer is a current published zoning layer.
    “Detailed description of county zoning districts, uses permitted, and development requirements and restrictions.”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots and residential development in the unincorporated areas of Wicomico County, by zoning district and use.

    • Every lot created after the effective date of the zoning chapter must meet the greater of the § 225-74 district requirement or the Wicomico County Health Department requirement.
    • The schedule varies by zoning district and use; examples include A-1 single-family detached: 20,000 square feet; R-8 single-family detached: 8,000/20,000 square feet; R-15 single-family detached: 10,000/20,000 square feet; R-20 single-family detached: 10,000/20,000 square feet; and R-30 all development: 30,000 square feet.
    • Residential density calculations and special-use standards may impose additional requirements.

    A-1 single-family detached minimum lot area: 20000 sq ft (Schedule also contains separate requirements for other A-1 uses.) · R-8 single-family detached minimum lot area: 8,000/20,000 sq ft (District schedule provides alternative values.) · R-15 single-family detached minimum lot area: 10,000/20,000 sq ft (District schedule provides alternative values.) · R-20 single-family detached minimum lot area: 10,000/20,000 sq ft (District schedule provides alternative values.) · R-30 all-development minimum lot area: 30000 sq ft

    “Every lot created after the effective date of this Chapter shall have the minimum number of square feet of land area as required by the Schedule of District Regulations (Section 225-74) or by the Wicomico County Health Department, whichever is greater.”
  • Lot coverageDistrict specific (with conditions)

    Maximum lot coverage for development in unincorporated Wicomico County, by zoning district and use.

    • The § 225-74 schedule defines lot coverage by district and use.
    • For apartment buildings, the schedule provides 60% maximum lot coverage in listed residential districts; many detached residential uses have 35% maximum lot coverage; townhouse entries may show N/A.
    • The zoning-code footnote states that lot coverage includes the square footage of building footprints located on the lot.

    A-1 single-family detached maximum lot coverage: 35 percent · R-8 single-family detached maximum lot coverage: 35 percent · R-15 apartment buildings maximum lot coverage: 60 percent · R-20 apartment buildings maximum lot coverage: 60 percent

    “Lot coverage includes the square footage of the footprint of buildings located on the lot.”
  • Living in an RVTemporary only (with conditions)

    Occupancy of recreational vehicles in county-regulated campgrounds and recreational vehicle parks in unincorporated Wicomico County

    • The zoning code defines campgrounds as providing temporary and not year-round occupancy, including recreational vehicles and campers.
    • A recreational vehicle park is defined for temporary occupancy of not over 30 days.
    • Campgrounds and recreational vehicle parks are subject to zoning-district approval and the standards in Section 225-81.
    • The code separately permits RV parking or storage in residential districts when located in the buildable area; that parking/storage provision does not itself authorize residential occupancy.

    maximum recreational-vehicle-park occupancy: <= 30 days

    “RECREATIONAL VEHICLE PARK -- A park designed to accommodate recreational vehicles for temporary occupancy of not over thirty (30) days duration.”
  • Accessory dwellingsAllowed (with conditions)

    Accessory apartments/accessory dwelling units in unincorporated Wicomico County

    • No more than one accessory apartment is permitted per lot.
    • An accessory apartment may be permitted as a special exception on the same lot as a detached single-family dwelling or two-family dwelling.
    • An accessory apartment is prohibited on a site with a Type II or III home-based business.
    • The apartment must be no more than 50% of the living area of the detached principal dwelling.
    • Attached and detached units must meet the code's entrance, parking, setback, footprint, and accessory-structure standards.
    • The county's Legislative Bill 2026-08 was adopted August 19, 2026 and states an effective date of October 19, 2026; that future amendment concerns accessory dwelling units.

    maximum accessory apartments per lot: <= 1 apartment · maximum accessory-apartment size: <= 50 percent of detached principal dwelling living area · detached accessory-apartment front setback: >= 60 feet from front lot line (Alternatively 85 feet from center of road, whichever is greater; a unit behind the dwelling may be 6 feet behind the single-family or two-family dwelling.)

    “An accessory apartment may be permitted provided that there shall be no more than one (1) accessory apartment permitted per lot and provided such accessory apartment shall comply with the following standards.”
  • Who permits septicCounty

    Administration of on-site sewage disposal systems throughout Wicomico County.

    “The division permits and inspects all on-site sewage disposal systems.”
  • Septic permitRequired

    New and replacement sewage permits administered by the Wicomico County Health Department.

    • The official building-permit application states that required sewage permits are separate from the $150 site-plan review fee.
    • The application lists a $500 fee for a new sewage permit and a $300 fee for a replacement sewage permit.

    new sewage permit fee: 500 USD · replacement sewage permit fee: 300 USD

    “Site Plan review fees ($150) do not include any required sewage permits (New $500/Replacement $300),Well Permits ($160) or Plumbing Permits (NC-$100, Mod/MH-$75, Additions- $50).”
  • Septic inspectionRequired

    On-site sewage disposal systems throughout Wicomico County.

    • The official page describes the Environmental Protection Division as permitting and inspecting all on-site sewage disposal systems.
    “The division permits and inspects all on-site sewage disposal systems.”
  • Off-grid sanitationLimited

    Individual on-site water-supply or sewage-disposal systems proposed in Wicomico County subdivision review when community sewer and water systems are not practical.

    • The rule is stated in the County's preliminary subdivision plat checklist.
    • The proposed individual system must be reviewed by the County Health Officer, or a soils evaluation for the site must be completed and submitted.
    • The source does not establish unrestricted off-grid sanitation for all property types or locations.
    “When community sewer and water systems are not practical, any proposed individual on-site water supply and/or sewage disposal system must be reviewed by the County Health Officer or a soils evaluation for the site completed and submitted.”
  • Well permitRequired

    Wells administered by the Wicomico County Health Department Environmental Protection Division.

    • The official Environmental Health page states that the division permits and inspects all wells.
    • The County building-permit application separately lists a $160 well-permit fee.

    well permit fee: 160 USD

    “We also permit and inspect all wells and manage subdivision plats, plumbing, perc tests and open burning.”
  • Agricultural exemptionConditional

    Farm accessory buildings and farm buildings used for agricultural purposes in unincorporated Wicomico County.

    • Farm accessory buildings deemed necessary to farm operation, used for agricultural purposes, and classifiable as Group U under Chapter 3 of the 2015 International Building Code still require a building permit and all inspections.
    • The exemption is from county permit fees for construction, erection, alteration, repair, removal, or demolition; it is not an exemption from the permit or inspection requirement.
    • The cited building-code amendment states it applies to the unincorporated territory of Wicomico County.

    permit requirement: true (Farm-building fee exemption does not eliminate the permit requirement.) · inspection requirement: true (All inspections required.) · permit fees: 0 USD (For qualifying farm buildings and farm accessory buildings.)

    “FARM ACCESSORY BUILDINGS THAT ARE DEEMED NECESSARY IN THE OPERATION OF A FARM, USED FOR AGRICULTURAL PURPOSES AND CAN BE CLASSIFIED AS GROUP U UNDER THE PROVISIONS OF CHAPTER 3, USE AND OCCUPANCY CLASSIFICATION, IN THE 2015 INTERNATIONAL BUILDING CODE, REQUIRE A BUILDING PERMIT AND ALL INSPECTIONS. HOWEVER FARM ACCESSORY BUILDINGS AND FARM BUILDINGS SHALL BE EXEMPT FROM ANY FEES SET FORTH HEREIN FOR A PERMIT FOR CONSTRUCTION, ERECTION, ALTERING, REPAIRING, REMOVING OR DEMOLITION OF ANY FARM BUILDING OR FARM ACCESSORY BUILDING.”
  • Subdividing landRegulated (with conditions)

    Subdivision and resubdivision of land within Wicomico County, including divisions into two or more lots, plats, sites, or other divisions for sale or building development.

    • Chapter 200 establishes standards and procedures governing subdivision and resubdivision.
    • The county subdivision page does not itself state municipal exclusions; incorporated municipalities may have separate or jointly applicable rules.
    • Subdivision review may involve the Planning Commission, Health Department, and other agencies.
    “It is the intent of Chapter 200 of the Wicomico County Code to establish standards and procedures governing the subdivision and re-subdivision of land within Wicomico County, in order to promote the public health, safety and general welfare of existing and future County residents.”
  • Building in a floodplainRequired

    All development within the Wicomico County floodplain.

    • Wicomico County adopted Floodplain Management Regulations in 1984 under Chapter 149 of the County Code.
    • The regulations were updated and new regulations were adopted as of August 17, 2015 in conjunction with publication of new floodplain maps.
    • The floodplain permit is issued in conjunction with applicable building permits or grading permits.
    • The rule applies to development within the floodplain, not property outside the floodplain.
    “All development within the Floodplain , requires a Floodplain permit to be issued in conjunction with applicable building permits or grading permits.”
  • Permit feesPublished (with conditions)

    County building permit fees for residential, accessory-structure, and commercial construction permits.

    • The fee schedule states an effective date of July 1, 2007.
    • Residential fees are based on estimated construction cost by square-footage category.
    • Commercial permit fees are based upon estimated construction costs and/or actual signed contracts.
    • The county states that fees shown are informational and applicants should call the Department of Public Works to determine exact fees.
    • Work started before obtaining the permit is subject to quadrupled fees.
    • The fee schedule states that no refund is granted for a permit with a fee of $17.00; for fees above $17.00, a refund request must be received within thirty days of issuance and the source states a 70% refund of the amount above $17.00.

    residential construction cost, up to 1,500 sq. ft.: 70 USD per sq. ft. · residential construction cost, 1,501 to 3,000 sq. ft.: 80 USD per sq. ft. · residential construction cost, 3,001 to 4,000 sq. ft.: 90 USD per sq. ft. · residential construction cost, 4,001 sq. ft. and over: 100 USD per sq. ft. · residential accessory structures, unfinished basements, garages, porches, decks, breezeways, and carports: 20 USD per sq. ft.

    “The following schedule for estimating the construction cost shall be used and the building permit fee will be based on these costs.”
  • Permit processPublished (with conditions)

    Residential and commercial building permit applications administered by Wicomico County.

    • Residential applicants are directed to use the Residential Permit Application and Minimum Plan Submittal Requirements.
    • Commercial applicants are directed to use the Commercial Permit Application.
    • Applications may be submitted by email to [email protected].
    • Electrical permits are issued for all electrical work in Wicomico County and municipalities, with separate licensing and application requirements.
    • Additional health, well, septic, zoning, grading, or floodplain approvals may apply depending on the project.
    “Residential Permit Application Minimum Plan Submittal Requirements Submit Application by Email ([email protected])”
  • County-wide zoningPresent

    County has a Planning, Zoning and Community Development department administering rezoning, subdivision and site plan review under a county zoning code.

    Wicomico County MD - Planning, Zoning and Community Development ↗Scouted from the county site, not yet independently re-checked

Maryland rules that apply here

  • InspectionsRequired

    Inspection of work authorized by building permits under Maryland's statewide building-standards enforcement mandate.

    • Each local jurisdiction must include inspection of permitted work among its minimum implementation and enforcement activities.
    • Each local jurisdiction determines the manner of carrying out the required inspections.
    • The county generally implements and enforces the standards, subject to the statutory municipal-corporation exceptions in Public Safety Article § 12-505(b).
    • A local jurisdiction may charge fees necessary to cover implementation and enforcement costs.
    “inspection of the work authorized by the building permits; and”
  • Driveway accessLimited

    Construction or modification of residential driveways within Maryland State right-of-way under MDOT State Highway Administration jurisdiction.

    • The requirement applies within the State right-of-way.
    • The applicant must coordinate with the applicable MDOT SHA district office for obtaining a permit.
    • Local planning and zoning or development review may also apply.
    • The source does not establish a statewide permit requirement for driveways outside State right-of-way.
    “You need a permit for the following activities within the State right of way. For a Commercial/Industrial/Residential Access Permit, see above. Construction or modification of residential driveways”
  • county zoning authorityGeneral

    Maryland counties adopting and enforcing zoning and planning laws, including for unincorporated county territory within the county's jurisdiction.

    • The authority is exercised through local laws and remains subject to other public general law, public local law, and any applicable State-government regulatory authority.
    • The statute states that the State policy is that planning and zoning controls are implemented by local government.
    “A county may enact local laws relating to zoning and planning to protect and promote public safety, health, morals, and welfare, including: [...] It is the policy of the State that planning and zoning controls shall be implemented by local government.”
  • county building authorityLimited

    Maryland counties requiring building permits and adopting or enforcing building codes for residential construction in unincorporated areas.

    • Local Government Article § 13-901 applies to all counties except Anne Arundel County, Baltimore City, Baltimore County, Cecil County, Charles County, Howard County, Prince George’s County, Queen Anne’s County, and Worcester County.
    • Under § 13-901(c), covered county governing bodies may regulate building construction, adopt and enforce building codes, require building permits, impose permit and inspection fees, and inspect buildings and structures.
    • Section 13-902 applies only to Calvert, Caroline, Dorchester, Frederick, Harford, Kent, and Worcester Counties.
    • Under § 13-902(c), a building or housing code generally does not apply to a building on a farm or premises devoted solely to agricultural uses, except that it applies in Calvert County to dwellings on which construction began after July 1, 1979 and in Frederick County to residential buildings or buildings constructed for human habitation regardless of location or auxiliary use.
    • Kent County must adopt a building code and housing code; Calvert, Caroline, Dorchester, Frederick, Harford, and Worcester Counties may adopt them.
    • A building code adopted under § 13-902 must require a building permit before a building is built or improved and include standards for structural safety, fire prevention, lighting, ventilation, and proper access.
    • Later amendments to codes incorporated by reference are not effective in Caroline, Frederick, Harford, Kent, and Worcester Counties until incorporated into the county code.
    • Separate county-specific provisions apply to Cecil, Charles, Queen Anne’s, and St. Mary’s Counties, including the Charles County exemption for farm buildings and other outbuildings costing less than $2,500.
    • The Maryland Building Performance Standards apply statewide to each building or structure for which a building permit application is received by a local jurisdiction on or after August 1, 1995.

    building permit before building is built or improved: true (Required in a building code adopted under Local Government Article § 13-902.) · Charles County farm-building or outbuilding cost exemption: < 2500 USD (The Charles County building code does not apply to farm buildings or other outbuildings costing less than $2,500.) · Maryland Building Performance Standards application date: >= 1995-08-01 (Applies to building permit applications received on or after this date.)

    “This section applies to all counties except: [...] The governing body of a county may: (1) regulate the construction of buildings and signs; (2) adopt a building code; (3) provide for enforcement of the code; (4) require permits for the construction of buildings and signs; (5) impose permit and inspection fees; (6) provide for inspection of buildings and structures;”

Inside cities and towns in Wicomico County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Mandatory utility hookupWater and sewer (with conditions)

    Properties outside Salisbury's corporate limits that seek Salisbury public utility service under the County-hosted Salisbury Water and Sewer Extension Policy, and properties where public water and sewer are available.

    • The policy applies to properties with documented public-health concerns when seeking utility extensions outside Salisbury's corporate limits.
    • The County Health Officer or designee must provide written notification identifying the public-health concern and its urgency.
    • Properties in a recorded subdivision with a public-health concern cannot opt out when service is provided to the entire subdivision.
    • An Out of Town Service Agreement must be executed before the City's approval of the utility system design.
    • Properties are required to connect to both public water and public sewer when available.
    • Connection charges are assessed under the Salisbury Municipal Code and annual fee ordinance.
    • Utility extensions and downstream improvements are funded by the applicant.

    application meeting deadline: 30 days (after receipt of the completed application)

    “Per Salisbury Municipal Code section 13.02.060.A, properties shall be required to connect to both the public water and public sewer system when available.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Minimum dwelling size — Minimum floor area or dwelling size for residential dwellings in unincorporated Wicomico County.
  • Tiny homes — Tiny-home occupancy in unincorporated Wicomico County
  • Short-term rentals — Short-term vacation rentals, including VRBO and Airbnb-type rentals, in Wicomico County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Wicomico County, Maryland

Is Wicomico County a good place to live off-grid or homestead?

Wicomico County scores 68/100 on the Bolthole Index, a strong county profile. Its strengths: mixed durability signals and strong self-sufficiency basics: 45.8″/yr rainfall plus 55.5% wooded land. Watch-outs: about 134,736 people within a 30-minute drive.

Do you need a building permit in Wicomico County, Maryland?

Wicomico County requires a building permit only in limited cases (such as floodplains or specific zones), and it enforces county zoning. Onsite septic is permitted by Wicomico County Health Department, Environmental Health. Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Wicomico County, Maryland?

Land in Wicomico County runs about $7,641 per acre, based on the latest county data.

What is the water situation in Wicomico County?

Wicomico County gets about 45.8" of rain a year, with severe drought in roughly 3.4% of years.

How remote is Wicomico County?

A representative private-land location has about 134,736 people within a 30-minute drive and 1,342,411 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Wicomico County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Wicomico compares in Maryland

Compare side-by-side →See all 24 Maryland counties ranked →