Salisbury, Maryland requires building permits for construction, structural alterations and changes of use, excluding ordinary nonstructural repairs.1 Salisbury sets its own zoning in Wicomico County, while Wicomico County Health Department handles septic permits and well permits inside city limits.234 Start with the city’s Infrastructure & Development Department for building and planning review.5
At a glance
- Building permits
- Required for construction, structural work and changes of use; ordinary nonstructural repairs excluded1
- Zoning
- City zoning under Title 17; standards depend on the district2
- Septic permits
- Wicomico County Health Department permits and inspects on-site sewage systems67
- Wells
- Well permits and inspections through Wicomico County Health Department4
- RV floodplain limits
- In flood hazard areas: meet manufactured-home requirements, remain highway-ready and fully licensed, or stay less than 180 consecutive days8
- Owner-performed improvements
- Maryland’s contractor-license exception for owner-performed home improvements does not waive building permits9
- Occupancy
- Certificate of Occupancy required before lawful use of a building, structure or addition10
Who to call
Building permits
City of Salisbury Infrastructure & Development Department
City building permits, planning, engineering and construction inspection; ask about zoning and floodplain review.
125 N Division St, Suite 304
Building permits
Salisbury Building Permit Guidelines and Procedures
Application documents and owner-performed work for city building permits.
Septic permits
Wicomico County Health Department, Environmental Health
Septic permits, well permits, inspections and perc tests inside Salisbury.
108 East Main Street, Salisbury, MD 21801
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Salisbury means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Salisbury, MD?
Salisbury requires a building permit for construction, reconstruction, renovation, remodeling, moving, demolition, structural alterations and changes in building use or bulk; ordinary nonstructural repairs are excluded.1 Salisbury does not allow construction to start until the building permit is issued, although approved foundation, grading or demolition work may have a separate authorization.1
Salisbury applies Maryland Building Performance Standards and the model codes listed on the city’s current-code page.11 Every Salisbury building permit requires project-specific inspections, and a building, structure or addition cannot be lawfully occupied until the Certificate of Occupancy is issued after approved inspections.1210
Who issues building permits in Salisbury, and where do you apply?
The City of Salisbury Infrastructure & Development Department handles building permits alongside planning, engineering and construction inspection.5 Call 410-548-3170 before visiting; the department’s main page lists 125 N Division St, Suite 304.5 Use the application portal linked from the department page, and ask the city which documents and fees apply to your project.5
Salisbury’s building-permit instructions require the application information, building plans and specifications at submission.13 For a dwelling application, the city asks for contractor information and a license, or an election to represent yourself as “work by owner.”13 Maryland’s owner-performed home-improvement exception concerns the contractor-license requirement; the exception does not eliminate the building permit requirement.9
Does Salisbury have zoning, and what setbacks apply?
Salisbury has its own zoning districts and district-specific development standards under Title 17.2 In Salisbury’s R-5A, R-8A and R-10A residential districts, the listed minimum setbacks are 25 feet at the front, 30 feet at the rear and 10 feet on each side; corner lots and other yard exceptions are addressed separately in the city code.14 Ask Infrastructure & Development to identify the parcel’s district and applicable exceptions before choosing a house footprint.514
Wicomico County’s zoning code excludes incorporated municipal areas, so use the Wicomico County guide for land outside Salisbury city limits.15 We could not confirm Salisbury’s minimum dwelling floor area or complete accessory-apartment conditions; ask the city’s Infrastructure & Development Department about your proposed design and use.5
How do septic permits and well permits work inside Salisbury?
Wicomico County Health Department permits and inspects on-site sewage disposal systems inside Salisbury, and the health department also handles well permits and inspections.374 Contact Environmental Health at (410) 546-4446 about a proposed system, existing-system review or perc testing.16
Maryland requires approval before constructing or altering an on-site sewage disposal system, including relevant changes to structures served by the system.17 No part of a septic system may be covered or used before inspection and approval by the approving authority or an approved third party.18 Salisbury’s dwelling application instructions also request a city water/sewer application, so establish the proposed utility arrangement with the city before treating a septic system or well as the solution for your lot.133
Can you live in an RV or tiny home in Salisbury?
Salisbury’s verified RV restriction concerns flood hazard areas: an RV must meet manufactured-home requirements, be fully licensed and ready for highway use, or remain on the site for less than 180 consecutive days.8 That floodplain provision does not establish citywide permission for residential RV occupancy; ask Infrastructure & Development about the proposed use and location before planning an RV stay while building.85
We could not confirm a separate Salisbury tiny-home occupancy rule or a complete rule for temporary camping on private land; ask Infrastructure & Development to review the specific unit and intended use.5 Maryland protects placement of qualifying new manufactured homes and modular dwellings in zones allowing single-family residential use, subject to statutory qualifications and local building and zoning requirements; the manufactured-home protection does not require permission for homes on wheels or temporary foundations.19
Building a home in Salisbury: what are the steps, in order?
- Ask Salisbury Infrastructure & Development to confirm the zoning district and review the intended use, site and building proposal.52
- Establish the water and sewage arrangement: the city’s dwelling instructions request a water/sewer application, while septic systems and wells require health-department approval.1364
- Prepare the required building plans and a surveyor-prepared site plan showing the footprint and setbacks; the dwelling instructions also request a receipt for paid Wicomico County development impact fees.13
- Obtain the Salisbury building permit before construction, then arrange the project’s required inspections.112
- Complete and obtain approval of inspections before requesting the Certificate of Occupancy; other site or public-works approvals may also be needed.10
Watch-outs
- Salisbury building permits expire if construction does not begin within 180 days or stops for more than 180 days; ask the city about renewal before a long pause.13
- Maryland requires local floodplain permits for development in mapped floodplains, including grading and filling; ask Salisbury Infrastructure & Development about floodplain review before site work.205
- We could not confirm Salisbury’s current building-permit fee amounts, driveway-access requirements or complete off-grid sanitation rules; ask Infrastructure & Development, and consult Environmental Health about any proposed private sewage system.516
Sources
- Building Permit Guidelines and Procedures (Salisbury), quoted and re-checked
- Salisbury Municipal Code, Section 17.160.060 (Salisbury), quoted and re-checked
- Environmental Health (Salisbury), quoted and re-checked
- Environmental Health (Salisbury), quoted and re-checked
- City of Salisbury Infrastructure & Development Department (salisbury.md)
- Environmental Health (Salisbury), quoted and re-checked
- Environmental Health (Salisbury), quoted and re-checked
- Salisbury Municipal Code, Section 15.16.240 (Salisbury), quoted and re-checked
- Maryland Business Regulation Article § 8-504 (Maryland statewide rule), quoted and re-checked
- Building Permit Guidelines and Procedures (Salisbury), quoted and re-checked
- Current Code Uses (Salisbury), quoted and re-checked
- Building Permit Guidelines and Procedures (Salisbury), quoted and re-checked
- Salisbury Building Permit Guidelines and Procedures (salisbury.md)
- Salisbury Municipal Code, Section 17.160.060 (Salisbury), quoted and re-checked
- Wicomico County Zoning Code, quoted and re-checked
- Wicomico County Health Department, Environmental Health (wicomicohealth.org)
- COMAR 26.04.02.03 On-Site Sewage Disposal Permits (Maryland statewide rule), quoted and re-checked
- COMAR 26.04.02.02 General Provisions (Maryland statewide rule), quoted and re-checked
- mgaleg.maryland.gov (Maryland statewide rule), quoted and re-checked
- Floodplain Permitting in Maryland (Maryland statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.