Monroe County, Indiana requires building permits for residential construction and other Class 2 projects through the Monroe County Building Department1. For unincorporated land in the county planning jurisdiction, complete Planning's Improvement Location Permit process before the building application; county zoning excludes Bloomington and Ellettsville2,3. Septic permits come from the Monroe County Health Department Wastewater Section, separately from building and zoning approval4.
Who is the Monroe County building department, and how do you reach them?
The Monroe County Building Department enforces adopted Indiana construction codes throughout Monroe County and maintains the county licensing and registration program for electricians and plumbers.
The Monroe County Building Department enforces adopted Indiana construction codes throughout Monroe County and maintains the county licensing and registration program for electricians and plumbers5. The office is at 501 N Morton St, Suite 220, Bloomington, IN 47404, and its phone number is (812) 349-25805. Office hours are Monday through Friday, 8:00am to 4:00pm; permit pickups and payments are limited to 9am-11am and 1pm-3pm5. Applications require an OpenGov account2. For a residential Class 2 project, finish the Planning Department's Improvement Location Permit process before applying to the Building Department2. The contractor or homeowner must call the Building Department at least 24 hours ahead to schedule an inspection, provide the permit number, and have the owner, contractor or a representative present9.
How do septic permits work in Monroe County?
The Monroe County Health Department Wastewater Section administers onsite sewage permits countywide, including municipal addresses.
The Monroe County Health Department Wastewater Section administers onsite sewage permits countywide, including municipal addresses10. A new home using septic needs a new septic permit; repair or replacement, renewal or modification, and nonresidential systems have separate permit types, and commercial systems may also need state approval6. Apply through OpenGov and submit a soil report when adding or changing a septic field4,6. Published fees are $250 new, $150 repair, $100 renewal and $400 commercial, subject to change6.
Only 22% of Monroe County soils are rated not limited for conventional septic drain fields; that does not make septic impossible elsewhere, but it makes site evaluation essential before fixing a house site11. Indiana prohibits drywells and cesspools for onsite sewage treatment, and temporary holding tanks require written state approval subject to specified exceptions12.
Can you live in an RV or tiny home on your land in Monroe County?
In Monroe County's zoning jurisdiction, an RV is temporary living quarters for recreational, camping, travel or seasonal use.
In Monroe County's zoning jurisdiction, an RV is temporary living quarters for recreational, camping, travel or seasonal use7. To qualify as non-permanent, an RV must not be permanently connected to utilities, including septic or sewer, and should not stay on a property for more than 180 days except for storage7. That duration does not establish permission to live in an RV while building; ask county Planning about the proposed parcel and use7.
We could not confirm authorization for residential occupancy of a tiny home on wheels in Monroe County; ask Planning about land-use approval and the Building Department about construction-code treatment7,13. A new home or ADU is included in the Class 2 Improvement Location Permit process, but that process alone does not establish that the use is allowed on a particular lot2,7.
Building a home in Monroe County: the steps, in order
For land outside Bloomington and Ellettsville, use the county Planning Department's online pre-design step so staff can identify project-specific approvals for the parcel.
- For land outside Bloomington and Ellettsville, use the county Planning Department's online pre-design step so staff can identify project-specific approvals for the parcel3,5.
- Complete the Improvement Location Permit process before applying to the Building Department for a Class 2 project2.
- If the home will use onsite sewage, apply through the Health Department's OpenGov process, pay the fee and provide a soil report when the project adds or changes a septic field4,6.
- Create the required OpenGov account and submit the residential building application after completing the applicable Improvement Location Permit process2,5.
- Resolve access and floodway permits: INDOT permission is required for a connection to a state highway, and most floodway development falls under Indiana DNR review14,15.
- Schedule each required construction inspection with the Building Department at least 24 hours ahead and keep the permit card visible from the road9.
- Pass the final inspection before moving in; after successful final approvals, the Building Department processes and issues the Certificate of Occupancy9.
What to check before you buy land in Monroe County
Septic and terrain: only 22% of Monroe County soils are rated not limited for conventional drain fields, so a parcel evaluation matters more than a countywide rating.
Septic and terrain: only 22% of Monroe County soils are rated not limited for conventional drain fields, so a parcel evaluation matters more than a countywide rating11. About 61% of county land has slopes of 15% or less, making slope another useful screen when choosing a building site11. Water: we could not confirm the scope or exceptions of Monroe County's private-well restrictions; ask the Health Department whether a well is allowed and whether approval is needed before relying on well water16. Access and flood risk: a driveway onto a state highway needs an INDOT permit, and most floodway development needs Indiana DNR Division of Water review; ask county Planning about additional local requirements2,14,15. Taxes: Monroe County's effective property tax rate is about 0.7%, with a median annual bill near $1,83711.
Watch-outs
- In Monroe County's zoning jurisdiction, an RV generally should not remain on property for more than 180 days except for storage, and permanent utility connections are inconsistent with its treatment as a non-permanent dwelling7.
- For Class 2 projects in Monroe County Planning's jurisdiction, complete the Improvement Location Permit process before applying for a building permit; the first step is the free Residential Construction Planning Pre-Design application2.
- Monroe County publishes building-permit fees by project type, but the retrieved schedule does not state an effective date; verify the current charge with the Building Department before budgeting1.
- Monroe County's own site does not state whether an owner-builder exemption exists; ask the Building Department directly before assuming you can skip a contractor8.
Sources
16 official pages, each quoted and re-checked · written October 10, 2026
- Monroe County: Building Department
- Monroe County: Planning Department
- Monroe County CDO
- Environmental Health: Wastewater
- Building Department
- Monroe County: Site Sewage Disposal Systems
- Monroe County: Plans, Ordinances & Other Materials
- Indiana Plumbing Laws Compilation (2026 county census)
- Inspection Schedule — Monroe County Building Department
- Monroe County Ordinance Chapter 365
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- 410 IAC 6-8.3 Residential On-Site Sewage Systems (Indiana statewide rule)
- Monroe County: Building Department
- INDOT Driveway Permit Guide 2024 (Indiana statewide rule)
- Water: Community Assistance & Information (Indiana statewide rule)
- Recommended Standards For Private Water Wells (Indiana statewide rule)
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Monroe County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.