Unincorporated Lee County, Illinois requires county building permits for structures other than fences and pools, which have separate applications1. The Lee County Building and Zoning Office applies zoning by district outside incorporated places with their own zoning2,3. The Lee County Health Department issues septic permits and inspects installations under county and Illinois private-sewage codes4.
Do you need a building permit in Lee County, Illinois?
Yes.
Yes. Structures in unincorporated Lee County go through the county building-permit process, with separate application paths for fences, pools, commercial work and other projects1. The general application requires an application, site plan and architectural plans, plus the parcel number and zoning7. Apply online, but wait for both the approved placard and approval letter before starting work1.
Lee County has no county building code, but its plan review uses the listed state and model building, energy, accessibility, plumbing, fire and electrical standards13. Lee County requires a qualified inspector's certificate for structures built after July 1, 2011 in R-4, commercial and industrial districts, and for structures built after that date and later converted to commercial use13. Commercial buildings must be inspected and approved, and may not be occupied until the Zoning Office issues a Letter of Occupancy13.
Who issues building permits in Lee County, Illinois?
The Lee County Building and Zoning Office is the first stop for a project outside a city, village or town that administers its own zoning, and the county directs applicants to its online permit portal.
The Lee County Building and Zoning Office is the first stop for a project outside a city, village or town that administers its own zoning, and the county directs applicants to its online permit portal3,7. Call the Building Official at 815-288-3109 or email jbay@countyoflee.org if the project category is unclear7. The ordinary application requires a site plan and architectural plans; after submission, the county says it will contact the applicant within 1–3 business days1.
County building-permit fees vary by project type and floor area, and the county's fee schedule sets a $50 minimum building-permit fee13,14. The Building Official sets a reasonable fee when the schedule does not list one14. Confirm the current application category and fee before budgeting because fences, pools, commercial work and other structures follow distinct paths1.
Does Lee County, Illinois have zoning?
Unincorporated Lee County has zoning districts that determine allowed uses and the location of improvements.
Unincorporated Lee County has zoning districts that determine allowed uses and the location of improvements2. Cities, villages and towns with their own zoning apply those rules inside their limits; the Lee County Health Department still handles septic and new-well permits throughout Lee County3,4,6.
Residential lot minimums in unincorporated Lee County are 2 acres in AG-1 and R-1; AG-1 also carries a restricted-use notation15. The residential minimum is 1 acre in R-2, R-3 and R-4, and 8,000 square feet in TN15. Ask Building and Zoning to confirm the parcel's district, allowed dwelling use and applicable setbacks before treating a lot as buildable16. Certain agricultural uses qualify for a state-law exemption from local zoning requirements; the Zoning Department determines eligibility2.
How do septic and well permits work in Lee County?
Illinois Department of Public Health regulates private sewage disposal statewide; the Lee County Health Department issues local septic permits and inspects installations under Lee County and Illinois codes.
Illinois Department of Public Health regulates private sewage disposal statewide; the Lee County Health Department issues local septic permits and inspects installations under Lee County and Illinois codes4,17. Illinois requires plan approval from the department or approved local authority before construction of a new private sewage system begins18. Contact Environmental Health at 815-284-3371 or contactus@lchd.com4.
Only about 16% of Lee County soils are rated without severe limitations for a conventional septic drain field, so investigate the specific site early19. New wells, well deepening, upgrades and well sealing also require permits before work begins, and the published well-permit fees are $175 for a potable well, $150 for a non-potable well and $100 for an upgrade or seal6. Well permit applications and fees go in before the building permit from the Zoning Office6. Ask Environmental Health whether a proposed alternative sanitation system satisfies county and state requirements4.
Can you live in an RV or tiny home in Lee County?
We could not confirm a countywide rule for living in an RV on private land, temporary camping, tiny-home occupancy or accessory-dwelling occupancy.
We could not confirm a countywide rule for living in an RV on private land, temporary camping, tiny-home occupancy or accessory-dwelling occupancy. Ask the Building and Zoning Office about the parcel's district and exact proposed use before buying or moving a unit onto the land7. Uses vary by zoning district in unincorporated Lee County2.
Manufactured housing is addressed in Lee County's use table and is limited by district designations, bulk regulations and applicable building codes8. A tiny home remains subject to the applicable building-permit path, but we could not confirm a rule specifically authorizing tiny-home occupancy1,7. Illinois allows a qualifying owner-occupant to perform plumbing on a single-family home, but that limited exemption does not waive county building permits or every local plumbing permit and inspection9,10.
Building a home in Lee County: what are the steps?
For a home on unincorporated land, use this order: Confirm the parcel number, zoning district, allowed residential use and parcel-specific setbacks with the Building and Zoning Office.
For a home on unincorporated land, use this order:
- Confirm the parcel number, zoning district, allowed residential use and parcel-specific setbacks with the Building and Zoning Office7,16.
- If land will be divided, confirm subdivision approval requirements with Building and Zoning before relying on a buildable lot20,21.
- Obtain preliminary septic and well review from the Lee County Health Department, then secure the required permits and inspections4,6.
- Prepare the building application, site plan and architectural plans, and submit them through the county portal7.
- For a commercial project, obtain the driveway-access, address-sign and drainage permits required from the Lee County Highway Engineer after the Zoning Office issues the address13.
- If the site is in a regulatory floodplain, complete the county floodplain permit process and any applicable state review11,22.
- Wait for the approved placard and approval letter before starting work1.
What should you check before buying land in Lee County?
Start with jurisdiction: confirm that the parcel is in unincorporated Lee County rather than an incorporated place with separate zoning.
Start with jurisdiction: confirm that the parcel is in unincorporated Lee County rather than an incorporated place with separate zoning3. Then verify the zoning district, residential lot minimum, allowed dwelling type, setbacks and whether a land division needs subdivision approval2,15,20.
Check septic feasibility and the water source early because most mapped soils carry severe limitations for a conventional drain field, and well work requires a permit6,19. Confirm driveway access with the authority responsible for the road; commercial applicants need county access, address-sign and drainage permits after receiving an address13. Review flood maps because development in a regulatory floodplain requires a county permit and may also require state approval11,22. The typical farmland value is about $10,639 per acre, while the effective property-tax rate is about 1.9%; use parcel records and a current assessment for a specific tract19.
Watch-outs
- An online submission and permit number do not authorize construction; wait for the approved placard and approval letter1.
- We could not confirm a countywide rule for private-land RV or tiny-home occupancy; ask Building and Zoning about the parcel and intended use7.
- Development in a regulatory floodplain requires a Lee County floodplain permit, and state approval may also apply11,22.
- Commercial applicants need county driveway-access, address-sign and drainage permits after the Zoning Office issues an address; state-road access requires an IDOT permit13,23.
Sources
23 official pages, each quoted and re-checked · written October 10, 2026
- Building Permits | Lee County, IL
- Zoning | Lee County, IL
- leecountyil.com
- Environmental Health | Lee County Health Department
- Zoning | Lee County, IL
- Lee County Health Department Well Permit Application Packet
- Lee County Building and Zoning Office (leecountyil.com)
- 10-9-1: Principal, Special, Temporary, Restricted Uses
- HB5913 Enrolled — Illinois Plumbing License Law amendment (Illinois statewide rule)
- 225 ILCS 320/18 — Local regulation; Department standards (Illinois statewide rule)
- Floodplain Information and Regulations | Lee County, IL
- Permit Application and Instructions (Illinois statewide rule)
- BUILDING PERMIT FEES & REGULATIONS
- Lee County Building Permit Fees
- Zoning | Lee County, IL
- Zoning | Lee County, IL
- Private Sewage Disposal | Illinois Department of Public Health
- 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Subdivision Regulations | Lee County, IL
- Lee County Building Permit Fees
- Permit Program (Illinois statewide rule)
- Highway Permits (Illinois statewide rule)
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Lee County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.