Lee County, Illinois
May Township is a township in Lee County, Illinois. Septic permits inside May Township come from May Township. 15 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Lee County page.
May Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction in the unincorporated portion of May Township administered by the Lee County Building/Zoning Office.
“Fee will be charged to both owner and contractor if any construction begins prior to the building permit being issued”
Commercial structures in R-4, C-1, C-2, C-3, I-1, I-2, or I-3 zones inside unincorporated May Township.
“Any structure built after July 1, 2011, in an R-4, C-1, C-2, C-3, I-1, I-2, or I-3 zone, or a structure built after July 1, 2011, and subsequently converted to a commercial use, will be required to obtain a certificate of inspection signed by an inspector who is qualified under the terms of Public Act 096-0704.”
Unincorporated land inside May Township subject to Lee County zoning.
“The unincorporated area of the county is divided into districts or "zones". Certain types of uses are allowed in each of these zones.”
Residential lots in the unincorporated portion of May Township, by applicable Lee County zoning district.
AG-1 residential minimum lot size: 2 acres (restricted use) · R-1 residential minimum lot size: 2 acres · R-2/R-3/R-4 residential minimum lot size: 1 acre
“Minimum lot size, residential | 2 acres, R | 2 acres | 1 acre | 1 acre | 1 acre | | | | | | | | | 8,000 s/f | | | |”
Buildings in the unincorporated portion of May Township, by applicable Lee County zoning district.
R-1 front yard: 25 ft (restricted use) · R-1 side and rear yard: 15 ft · R-2/R-3/R-4 front yard: 25 ft (R-2 and R-3 marked restricted use) · R-2/R-3/R-4 side and rear yard: 7 ft
“Yard, front | | 25 ft, R | 25 ft, R | 25 ft | 25 ft | 25 ft, R | 25 ft, R | 25 ft, R | 15 ft, R | 15 ft, R | 15 ft, R | | | | S | | R | Yard, side | | 15 ft | 7 ft | 7 ft | 7 ft | 15 ft, R | 15 ft, R | 15 ft, R | 15 ft, R | 15 ft, R | 15 ft, R | | | 7 ft | S | | R | Yard, rear | | 15 ft | 7 ft | 7 ft | 7 ft | 15 ft, R | 15 ft, R | 15 ft, R | 15 ft, R | 15 ft, R | 15 ft, R | | | 7 ft | S | | R |”
Private sewage disposal systems installed inside May Township.
“Permits are issued and inspections are conducted of private sewage disposal systems installed in Lee County.”
New private sewage installations, repairs, and additions inside May Township.
contractor installation permit fee: 125 USD · property-owner installation permit fee: 250 USD
“A sewage permit is necessary on all new installations, repairs or additions to existing systems. The fee for the permit is $125.00 for contractor installation or $250.00 for property owner installation.”
Private sewage systems installed by property owners inside May Township.
“Property owners must request the Lee County Health Department to make a final inspection after the system is installed and before the trenches are backfilled.”
Alternative private septic systems inside May Township.
“Any person wishing to install an alternative septic system must acquire a septic permit prior to the system installation.”
New wells installed inside May Township.
“Permits are issued on all new wells which are installed in Lee County. All systems must be installed in accordance with specific Lee County Codes and Rules and Regulations. Fees are required for permits.”
Agricultural uses in the unincorporated portion of May Township subject to Lee County zoning.
“Certain agricultural uses are exempt from meeting local zoning requirements according to state law. Contact the Zoning Department to determine if you qualify for this exemption.”
New building-permit applicants in the unincorporated portion of May Township.
“After the Zoning Office has issued an address, the individual requesting the permit must receive a driveway access permit, a 9-1-1 sign permit and drainage permit from the Lee County Highway Engineer”
Development on a May Township parcel in the regulatory floodplain.
“Building/Developing in a Floodplain requires additional steps. Most require the minimum of the following: Lee County Floodplain Permit; Elevation Survey; State Application(s); Building Permit (If Project is Allowable).”
Private sewage permits inside May Township.
contractor-installed septic permit: 125 USD · property-owner-installed septic permit: 250 USD
“The fee for the permit is $125.00 for contractor installation or $250.00 for property owner installation.”
Building-permit applicants in the unincorporated portion of May Township.
“Contact the Lee County Zoning Office, 112 E Second St, Dixon, IL 61021 (815) 288-3643, to obtain the Building Permit application. A platted survey of the parcel must be provided.”
We looked and could not find an official answer yet. Silence is not permission; ask May Township or Lee County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that May Township publishes no rule on the point, not that none exists. Lee County’s page lists the county offices to call.
Off-grid gear
Going off-grid in May Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.