Lee County, Illinois
Village of Paw Paw is a village in Lee County, Illinois. Village of Paw Paw adopts its own zoning, so inside its limits Village of Paw Paw’s rules apply, not the county’s. Septic permits inside Village of Paw Paw come from Lee County (Lee County Health Department, Environmental Health · 815-284-3371). 7 rules below are quoted from official sources and independently re-checked, most recently on October 22, 2026. Rules for unincorporated land are on the Lee County page.
Inside Paw Paw village limits: building permits for the listed work, as stated on the village's own website
“building permits are required for the following: new roofs (per ordinance only one overlay is allowed); fences; sheds; accessory buildings; remodeling of plumbing/electrical; and new construction. building permits are not needed for windows, unless enlarging the size of the windows, and siding.”
Land inside Paw Paw village limits; the village's own zoning chapter applies to use and development there
“chapter 290 zoning (§ 290-1 – § 290-58)”
Village of Paw Paw does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New or repaired septic tanks and sewage disposal systems inside Paw Paw village not connected to a public sewer
residential septic permit application fee (tank/field): 225 USD (2024 amount; table shows $250.00 (2027) and $275.00 (2030); owner-installed systems pay twice the contractor-installed fee)
“no septic tank, privy vault, sink drain, or sewage disposal system shall be erected, constructed, or repaired in this county, except in accordance with this chapter, and it shall be unlawful to proceed with such work unless a permit has first been obtained from the county board of health”
Alternative septic systems installed inside Paw Paw village; general septic inspection rules were not read
“8. inspection prior to backfill: all new alternative septic systems must be inspected after installation prior to backfilling.”
Septic system permit fees for systems inside Paw Paw village that are permitted by the county board of health. Village building permit fees are not published in the readable sources.
residential septic permit application fee: 225 USD (submitted by licensed septic contractor; 2024 amount)
“a fee of one hundred twenty-five dollars ($125.00) for tank-only installation, two hundred twenty-five dollars ($225.00) for residential properties, and three hundred twenty-five dollars ($325.00) for commercial properties must accompany each sewage application submitted by a licensed septic contractor.”
Septic system permit process for systems inside Paw Paw village; village building permit process is not published in the readable sources
“applications shall be approved by the county health department and permits shall be issued before any construction or repair is undertaken and before the building permit is issued.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Paw Paw or Lee County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Paw Paw publishes no rule on the point, not that none exists. Lee County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Paw Paw means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.