Unincorporated Grand County, Colorado requires permits for construction, alteration, relocation, repair, changes of use and demolition, subject to listed exceptions1. County zoning also applies, and Grand County's Building & Sanitation Division administers onsite wastewater permits and inspections23.
At a glance
- Building permit
- Required for covered construction and alterations, with limited exceptions1
- Zoning
- Grand County zoning applies in unincorporated areas2
- Septic
- The county reviews designs, issues OWTS permits and conducts inspections34
- RV living
- Long-term occupancy on private land could not be confirmed; ask Planning & Zoning5
- Tiny home
- State-certified residential units remain subject to county zoning and site requirements65
- Owner-builder
- An exemption could not be confirmed; ask Building & Sanitation before self-performing work7
- Private well
- A Colorado Division of Water Resources permit is required, subject to exceptions and basin rules8
Who to call
Building permits
Grand County Building & Sanitation Division
Building permits, plan review, inspections and code compliance in unincorporated Grand County and listed towns
308 Byers Avenue, Hot Sulphur Springs, CO 80451
Septic permits
Grand County Building & Sanitation Division
Onsite wastewater design review, permits and field inspections as the Grand County Sanitarian
308 Byers Avenue, Hot Sulphur Springs, CO 80451
Zoning
Grand County Planning & Zoning Division
Land use, zoning, permitted uses, setbacks, subdivisions and special-use permits in unincorporated Grand County
308 Byers Avenue, Hot Sulphur Springs, CO 80451
Roads & driveways
Grand County Road & Bridge Department
Driveway and access permits for driveways connecting to county roads
467 E. Topaz Ave., Granby, CO 80446
Floodplain permits
Grand County Floodplain Administrator
Floodplain development permit administration and review
Contact details are copied from each office’s official page and were checked against it on September 27, 2026.
Do you need a building permit in Grand County, Colorado?
Yes. Unincorporated Grand County requires a permit for construction, alteration, relocation, repair, a change of use or demolition of a building or structure1. Limited exceptions include qualifying small accessory structures and ordinary finish work, but those exceptions have detailed conditions, so confirm the specific project before starting1. The county inspects new construction and remodeling for compliance with local building and fire codes9. Grand County has adopted building codes and local amendments, including updated codes effective in 202610. The county did not confirm an owner-builder exemption, so ask Building & Sanitation how contractor registration and self-performed work apply to the proposed project7.
Who handles Grand County building permits and inspections?
Grand County Building & Sanitation handles building permits, plan review, inspections and code compliance for all unincorporated Grand County, as well as the listed incorporated towns within its jurisdiction11. Call 970-725-3255 or visit 308 Byers Avenue in Hot Sulphur Springs for help with the correct application path11. All building applications are submitted online, and Planning & Zoning performs a pre-check before an application advances12. Planning questions go to the Grand County Planning & Zoning Division at [email protected]13. Granby, Fraser and Winter Park use a different building division, so property inside those town limits should not be routed through the county office described here14.
Does Grand County, Colorado have zoning?
Yes. The Grand County Planning & Zoning Division manages land use and development in unincorporated Grand County2. The county has multiple zoning districts, and Planning & Zoning needs an accurate legal description to verify a parcel's designation15. Setbacks vary by district; for most properties the county's published figures are 30 feet in front, 10 feet at the sides and 20 feet at the rear, with a 30-foot setback from a water body or waterway16. Those figures are not a substitute for parcel-specific confirmation. The county did not confirm a universal minimum dwelling size, minimum lot size or lot-coverage rule, so send the parcel description and proposed use to Planning & Zoning before relying on a listing's buildability claims5.
How do septic permits work in Grand County, Colorado?
Grand County Building & Sanitation serves as the county sanitarian for onsite wastewater treatment systems in unincorporated Grand County17. The division reviews engineered designs, issues OWTS permits and performs field inspections under the county's adopted regulations34. Colorado also requires an OWTS permit before a person constructs, alters, installs or uses a system where the structure lacks sewer service18. Final inspection and local approval must occur before a permitted system is placed in use19. Only 3.4% of mapped county soils rate as free of severe limits for a conventional drain field, so make septic feasibility and the engineered design an early purchase contingency20.
Can you live in an RV or tiny home in Grand County?
Grand County's reviewed rules did not confirm whether long-term RV occupancy or temporary camping is allowed on private land, so ask Planning & Zoning about the parcel, duration and utility setup before buying or moving an RV onsite5. Colorado's state-park camping rules do not answer the private-land question. A Colorado-regulated tiny home can be approved for long-term living on a permanent or temporary foundation, but plans require state approval before construction and the unit remains subject to local zoning and site criteria6. Grand County did not confirm a complete local rule for tiny homes, manufactured homes or accessory dwellings; bring the unit specifications and parcel legal description to Planning & Zoning for a written parcel-specific answer15.
What are the steps to build a home in Grand County?
- Ask Planning & Zoning to verify the parcel's zoning designation, permitted use and setbacks from its legal description1516.
- Resolve access early; Road & Bridge says a county-road driveway or access approval comes before the building application21. Direct access to a state highway requires a Colorado Department of Transportation access permit22.
- Arrange an engineered OWTS design and obtain county septic approval if public sewer is unavailable323.
- Apply to the Colorado Division of Water Resources if the project needs a groundwater well8.
- Submit the building application online and complete the Planning & Zoning pre-check12.
What should you check before buying land in Grand County?
Confirm zoning, setbacks, legal access, water and wastewater feasibility before treating a Grand County parcel as buildable151683. Septic deserves special attention because only 3.4% of mapped soils rate as free of severe limits for a conventional drain field20. Terrain can also narrow the practical building envelope: 26.6% of county land is at a 15% slope or less, 53.9% is wooded and 69% is federal land242526. Ask the county Floodplain Administrator whether the site needs a floodplain development permit27. If access is directly from a state highway, budget for the separate state access-permit process22.
Watch-outs
- Granby, Fraser and Winter Park have a separate building division; confirm the parcel's jurisdiction before filing14.
- A county-road driveway approval comes before the building application, while direct state-highway access goes through the Colorado Department of Transportation2122.
- Grand County did not confirm long-term private-land RV occupancy, temporary camping or a universal minimum home size; ask Planning & Zoning for a parcel-specific answer5.
Sources
- General Information, quoted and re-checked
- Planning & Zoning, quoted and re-checked
- General Information, quoted and re-checked
- General Information, quoted and re-checked
- Planning & Zoning (2026 county census)
- Consumers of Manufactured Homes and Tiny Homes - HUD (Colorado statewide rule), quoted and re-checked
- (2026 county census)
- Water Administration (Colorado statewide rule), quoted and re-checked
- Community Development, quoted and re-checked
- Codes & Amendments, quoted and re-checked
- Grand County Building & Sanitation Division (co.grand.co.us)
- General Information, quoted and re-checked
- Grand County Planning & Zoning Division (co.grand.co.us)
- General Information (2026 county census)
- Planning & Zoning FAQ, quoted and re-checked
- Planning & Zoning FAQ, quoted and re-checked
- Grand County Building & Sanitation Division (co.grand.co.us)
- Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
- Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Grand County Road & Bridge Department (co.grand.co.us)
- Access Permits | Frequently Asked Questions (Colorado statewide rule), quoted and re-checked
- Title 25 - Public Health and Environment - Colorado Revised Statutes 2024 (Colorado statewide rule), quoted and re-checked
- Share of land at 15% slope or less: Bolthole Index county data
- Wooded share of land: Bolthole Index county data
- Federal land share: Bolthole Index county data
- Grand County Floodplain Administrator (co.grand.co.us)
Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.