Bolthole Index

Solano County, California

Building permits, zoning and land rules in Solano County, California

22Index Score / 100
#56 of 58 in California

Unincorporated Solano County, California requires a building permit for most construction, with specific exemptions for minor work1. County zoning governs land use throughout the unincorporated area2. Only 3.3% of county soils are rated without severe limits for a conventional drain field, so investigate septic feasibility early3.

At a glance

Building permit
Required for most construction in unincorporated Solano County1
Zoning
County zoning applies throughout the unincorporated area2
Septic
Administered by Solano County Environmental Health4
Owner-builder
Available under California's conditional owner-builder exemption5
RV living
Private-land occupancy was not confirmed; ask Planning Services6
Tiny home
Must qualify as an approved California structure or vehicle type in an allowed location7
Minimum home size
Room minimums apply, but no total dwelling-size minimum was confirmed8
Well
A local permit is required before construction, modification or destruction9

Who to call

Building permits

Solano County Resource Management - Building & Safety Services

Building permits and online applications

707-784-6765

[email protected]

675 Texas St., Suite 5500, Fairfield, CA 94533

Online permits →

Zoning

Solano County Resource Management - Planning Services

Zoning lookups and development review

707-784-6765

[email protected]

675 Texas Street, Suite 5500, Fairfield, CA 94533

Online permits →

Septic permits

Solano County Environmental Health Division - Technical Services

Onsite sewage disposal program questions

707-784-1636

[email protected]

675 Texas Street, Suite 5500, Fairfield, CA 94533

Contact details are copied from each office’s official page and were checked against it on September 29, 2026.

Do you need a building permit in Solano County, California?

Yes. Most construction in unincorporated Solano County requires a permit1. A one-story detached shed, playhouse or similar structure no larger than 120 square feet can be exempt when it has no utilities1. Plans must use the 2025 California codes, and each separate structure needs a separate application10. A licensed contractor, owner or certified agent may receive the permit1. Every permit issued by Solano County requires inspections, which the permit holder must schedule11.

Who issues Solano County building permits, and how do you apply?

Building & Safety Services issues county-administered permits12. Call 707-784-6765, email [email protected] or visit 675 Texas St., Suite 5500, Fairfield, CA 9453312. Apply through the online portal12. The published process is to determine requirements, register online, submit, complete plan review, pay fees and obtain inspections; details vary by permit type13. Plan-check fees are due at submittal and final permit fees at issuance10.

Does Solano County have zoning?

Yes. Chapter 28 governs unincorporated Solano County; city property goes to the city's planning department214. Planning Services can identify the district at 707-784-6765 or [email protected]15. Allowed uses and setbacks depend on the zoning district and proposed development1416. Rural residential parcels generally have a 5-acre minimum unless public water is available, but that is not a universal county minimum17. County guidance requires one habitable room of at least 120 square feet and other habitable rooms of at least 70 square feet, with kitchens excepted; those are room sizes, not a confirmed minimum size for the whole dwelling8.

How do septic and well permits work in Solano County?

Solano County Environmental Health administers onsite sewage permitting and inspection4. Contact Technical Services at 707-784-1636 or [email protected]18. Its page requires an application, fee and approval before sewage-disposal work begins, but does not clearly state every trigger or inspection interval; ask the office about the proposed work18. Only 3.3% of soils lack severe conventional-drain-field limits3. Remodeled or new waterfowl hunting clubs in the Suisun Marsh within BCDC planning jurisdiction must use sewage holding tanks pumped by an approved service agent instead of septic systems19. Wells need a local permit and licensed C-57 driller9.

Can you live in an RV or tiny home in Solano County?

We could not confirm a private-land RV occupancy rule for unincorporated Solano County. California generally limits RV occupancy to authorized parks unless local law allows otherwise6. Solano County parks allow temporary camping for 14 days followed by a mandatory 30-day absence and prohibit resident camping, but that park rule does not answer what is allowed on private land20. Ask Planning Services about the parcel15. A tiny home must qualify as an approved California structure or vehicle type in an allowed location7. Manufactured homes require zoning approval and a building permit; septic, well, grading or temporary-use permits may also apply21.

What are the steps to build a home in Solano County?

First, confirm zoning, use and setbacks with Planning Services2216. Second, establish septic and water feasibility49. Third, prepare separate code-compliant plans for each structure10. Fourth, apply online, complete plan review and pay the required fees13. Fifth, schedule every required inspection after work begins; all Solano County-issued permits require inspections11. California's owner-builder exemption can excuse a qualifying owner from contractor-licensing requirements, but it does not remove permit or inspection duties2311. Ask Building & Safety what final occupancy approval applies.

What should you check before buying land in Solano County?

Confirm jurisdiction, zoning, allowed use, setbacks and legal access1424. A subdivision can carry rights-of-way, easements and street-improvement conditions25. Resolve septic feasibility because only 3.3% of soils lack severe conventional-drain-field limits3. Verify the water source; annual precipitation is 20.8 inches and severe drought occurs in about 40.4% of years2627. Typical property tax is about 0.7%, with a median annual bill near $4,4082829.

Watch-outs

  • County-park camping is limited to 14 days followed by 30 days out, but that rule does not answer private-land occupancy; ask Planning Services about the parcel2015.
  • Only 3.3% of soils lack severe conventional septic limits, so resolve feasibility before choosing a house site3.
  • Minimum parcel size and setbacks vary by zoning district1716.

Sources

  1. When is a Building Permit Required?, quoted and re-checked
  2. Planning Services, quoted and re-checked
  3. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  4. Environmental Health, quoted and re-checked
  5. California Business and Professions Code Section 7044 (California statewide rule), quoted and re-checked
  6. Information Bulletin 2016-01: Tiny Homes (California statewide rule), quoted and re-checked
  7. Information Bulletin 2016-01: Tiny Homes (California statewide rule), quoted and re-checked
  8. Room Additions, quoted and re-checked
  9. Wells, quoted and re-checked
  10. General Permitting Requirements, quoted and re-checked
  11. Inspections | Solano County, California, quoted and re-checked
  12. Solano County Resource Management - Building & Safety Services (solanocounty.gov)
  13. About Building & Safety Services, quoted and re-checked
  14. Solano County - FAQs, quoted and re-checked
  15. Solano County Resource Management - Planning Services (solanocounty.gov)
  16. Solano County Planning FAQs, quoted and re-checked
  17. Solano County Planning and Zoning FAQs, quoted and re-checked
  18. Solano County Environmental Health Division - Technical Services (solanocounty.gov)
  19. Suisun Marsh Protection Plan, quoted and re-checked
  20. Rules & Regulations, quoted and re-checked
  21. Mobile Modular Manufactured Homes, quoted and re-checked
  22. Development Planning, quoted and re-checked
  23. California Business and Professions Code Section 7044, quoted and re-checked
  24. Room Additions, quoted and re-checked
  25. Solano County Planning FAQs, quoted and re-checked
  26. Annual precipitation: Bolthole Index county data
  27. Share of years in severe drought: Bolthole Index county data
  28. Effective property tax rate: Bolthole Index county data
  29. Median property tax bill: Bolthole Index county data

Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Solano County in California

22
County map
Solano County highlighted among the California counties · colored by Index score

How Solano County scores

Seclusion7100% ev.
Self-Sufficiency4096% ev.
Admin Boringness40100% ev.
Durability34100% ev.
Property Autonomy56100% ev.
Carry Cost45100% ev.

Evidence strength: 99%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$580kTypical home
0.7%Property tax
$12,901Land / acre
20.8"Annual rain
40.4% of yrsSevere drought
26.8 / yr (+15.2)Mid-century 100°F days
96.9 daysMid-century dry spell
1.57" (+6.6%)Mid-century 1-day rain
1.07×Wildfire change factor
100%Forward climate coverage
$1,364Home insurance / yr
5.8% / yrInsurance growth
0.71%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
426,899People within 30 min
12,240,589People within 2 hr
257,634Radius comparison (15 mi)
546.6People / sq mi
4%Federal land
78.2%Land at 15% slope or less
3.3%Septic soil without severe limits
13,411 acWorkable land screen
13.5%Wooded land
30.5 tonsBiomass / forest ac
61.3°FAvg temp

Scout Solano County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Solano County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Solano County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Solano County rules

  • Building permitRequired

    Most construction in the Solano County Building & Safety Services jurisdiction, including construction in unincorporated Solano County.

    • A building permit is required unless the work is specifically exempted under CBC section 105.2.
    • Exemptions include one-story detached accessory structures used as tool or storage sheds, playhouses, or similar uses when no more than 120 square feet and without electrical, mechanical, or plumbing utilities.
    • Other listed exemptions include fences not over 6 feet high; oil derricks; retaining walls not over 4 feet measured from the bottom of the footing to the top of the wall unless supporting a surcharge or impounding Class I, II, or III-A liquids; grade-supported water tanks of no more than 5,000 gallons with height-to-diameter-or-width ratio no more than 2:1, although piping or electrical requires a permit; sidewalks and driveways no more than 30 inches above adjacent grade and not over a basement or story below and not part of an accessible route; painting, papering, tiling, carpeting, cabinets, countertops and similar finish work; temporary motion-picture, television and theater stage sets and scenery; certain above-ground prefabricated swimming pools less than 24 inches deep and no more than 5,000 gallons; nursery or agricultural shade-cloth structures excluding service systems; swings and playground equipment accessory to detached one- and two-family dwellings; certain wall-supported window awnings projecting no more than 54 inches; and nonfixed movable fixtures, cases, racks, counters and partitions no more than 5 feet 9 inches high.
    • Counters for commercial or industrial operations require permits.
    • If an emergency repair impacts safety, the permit application must be submitted within the following business day.
    • Permits may only be issued to a licensed contractor, the property owner, or the property owner's certified agent; contractor license and workers compensation insurance verification is required.

    detached accessory structure exemption floor area: <= 120 square feet (Must be one-story, detached, similar to a tool/storage shed or playhouse, and have no electrical, mechanical, or plumbing utilities.) · fence exemption height: <= 6 feet · retaining wall exemption height: <= 4 feet (Measured from bottom of footing to top of wall; no surcharge or Class I, II, or III-A liquid impoundment.) · water tank exemption capacity: <= 5000 gallons (Height-to-diameter-or-width ratio must not exceed 2:1; piping and electrical require permits.) · swimming pool exemption depth: < 24 inches (Must not exceed 5,000 gallons and must be entirely above ground; accessory to Group R-3 occupancy.) · window awning exemption projection: <= 54 inches (Must be supported by an exterior wall and not require additional support for Group R-3 or U occupancies.) · movable fixture exemption height: <= 5.75 feet (Commercial or industrial counters require permits.)

    “Building permits are required for most types of construction”
  • Building code adoptedAdopted (with conditions)

    Building plans submitted to Solano County Building & Safety Services under the county-administered building-permit process.

    • Plans must use the 2025 California Building Code based on the 2024 IBC.
    • Residential work uses the 2025 California Residential Code based on the 2024 IRC.
    • Mechanical, electrical, plumbing, fire, energy, green-building, wildland-urban-interface, and existing-building codes listed by the County are also the 2025 editions.
    • Each separate building or structure requires a separate building permit application.
    • Plan-check fees are due at submittal and final permit fees at permit issuance.

    building code edition: 2025 California Building Code (based on the 2024 IBC) · residential code edition: 2025 CRC (based on the 2024 IRC)

    “Plans shall be drawn using the 2025 California Building Code (based on the 2024 IBC)”
  • InspectionsRequired

    Construction performed under a building permit issued by Solano County Building & Safety Services.

    • All issued permits require building inspections.
    • Scheduling inspections is the responsibility of the permittee.
    • Requests received before 3:00pm are scheduled for the following business day; requests received after 3:00pm are scheduled 2 business days later.
    • The page states that not every inspection type applies to every job; the applicable inspection types must be requested through the county inspection line.
    “All issued permits require building inspections. Scheduling inspections is the responsibility of the permittee.”
  • County-wide zoningPresent (with conditions)

    County zoning regulations administered under Chapter 28 for property in unincorporated Solano County.

    • Chapter 28 is the Solano County zoning code.
    • The zoning ordinances apply to construction, alteration, moving, repair, and use of buildings, parcels of land, and signs.
    • Allowed uses and development standards vary by proposal and location.
    • The official county FAQ separately directs persons whose property is within a city to consult that city for city-specific matters.
    “The Solano County Code Compliance program has been empowered to investigate housing code violations, zoning code violations, and vehicle abatement issues.”
  • Local zoningVaries (with conditions)

    Aggregate conclusion for local zoning in Solano County: county zoning governs the unincorporated area, while incorporated city areas may be subject to city-specific zoning administration.

    • The County has adopted a General Plan and Zoning Ordinance.
    • Standards vary depending on the proposed use and location.
    • The zoning district determines whether a use is allowed and establishes applicable standards.
    • Some uses require a use permit.
    • A rezone requires a public hearing and County Board of Supervisors approval.
    • For property within city limits, the county FAQ states that the applicable city should be contacted for city matters.
    “County zoning regulations or General Plan policies are applicable in the unincorporated area only. [...] please contact the respective city’s planning department for planning inquiries.”
  • Zoning districtsPublished (with conditions)

    Zoning districts and parcel-level zoning information in unincorporated Solano County.

    • The county directs users to the Solano County GIS Parcel Viewer to look up General Plan land-use designations and zoning districts and view parcel zoning.
    • The county's Development Planning page states that county zoning regulations or General Plan policies apply to the unincorporated area.
    • Projects within city limits must be handled by the applicable city planning or zoning department.
    “This data displays the Zoning Districts of the unincorporated lands of Solano County, California.”
  • Minimum dwelling sizeSpecified

    Dwelling units covered by the County's room-addition guidance in the unincorporated area.

    • At least one habitable room in every dwelling unit must have at least 120 square feet of gross floor area.
    • Kitchens are excepted from the 120-square-foot requirement.
    • Other habitable rooms must have at least 70 square feet.
    • The cited page presents these as room-size requirements, not a total minimum floor area for the entire dwelling.

    minimum gross floor area for at least one habitable room: >= 120 sq ft (Kitchens) · minimum floor area for other habitable rooms: >= 70 sq ft (Kitchens)

    “Every dwelling unit shall have at least one habitable room that shall have not less than 120 square feet of gross floor area.”
    One more reviewed finding on this topic
    • Specified — Dwelling units in unincorporated Solano County, as addressed by the County room-addition building requirements.
      “one habitable room [...] not less than 120 square feet [...] Other habitable rooms [...] not less than 70 square feet.”
  • Minimum lot sizeDistrict specific (with conditions)

    Subdivision and parcel-size requirements for property in unincorporated Solano County.

    • The minimum parcel size depends on the property's zoning.
    • A property must have double the applicable minimum parcel size to subdivide.
    • In rural residential zoning districts, the minimum parcel size is 5 acres unless the property is on public water; each parcel created must have 50 feet of frontage on a public road.
    • Agricultural property in a Williamson Act contract must also comply with Williamson Act requirements.

    minimum parcel size in rural residential zoning districts: 5 acres (Unless on public water) · minimum public-road frontage for each parcel created in rural residential zoning districts on public water: >= 50 feet

    “check the zoning [...] minimum parcel size. You must have double the minimum parcel site [...] minimum 5-acre parcel size unless [...] public water [...] 50-feet of frontage”
  • SetbacksDistrict specific (with conditions)

    Buildings, accessory structures, and fences on properties in unincorporated Solano County.

    • The applicable zoning district determines the minimum setback distances.
    • Applicants are encouraged to contact the Planning Division before finalizing plans to confirm minimum zoning requirements and avoid encroachment into easements or required side, front, or rear yard areas.
    • Projects within incorporated city limits are subject to the applicable city's planning or zoning department.
    “The zoning district specifies the permitted land uses, such as residential, commercial, or industrial and the minimum distances or set back from the property lines for buildings, accessory structures, and fences, as well as maximum height restrictions.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Setback standards for development in unincorporated Solano County.
      “the minimum distances or setbacks from the property lines for buildings”
  • Building heightDistrict specific (with conditions)

    Building height restrictions for properties in designated zoning districts in the unincorporated area of Solano County.

    • The applicable maximum height restriction depends on the property's designated zoning district.
    • The county page states that zoning information must be obtained from the Planning Services Division before a building permit can be issued.
    • If the project lies within city limits, the applicable city planning or zoning department must be contacted instead.
    “Each property within the County is part of a designated zoning district. The zoning district specifies the permitted land uses, such as residential, commercial, or industrial and the minimum distances or set back from the property lines for buildings, accessory structures, and fences, as well as maximum height restrictions.”
  • Living in an RVLimited

    Recreational-vehicle occupancy at Solano County parks and campgrounds.

    • A limit of 14 days applies with a mandatory 30-day out period.
    • Resident camping is prohibited.
    • Campers must place a recreational vehicle, tent, or trailer at the site to prove occupancy.
    • The source is a county-parks rule and does not establish a countywide rule for private land outside county parks.

    maximum stay: 14 days · mandatory out period: 30 days

    “A limit of 14 days with a mandatory 30-day out period enforced. No resident camping.”
  • Camping on your landLimited

    Temporary camping at Solano County parks and campgrounds.

    • A limit of 14 days applies with a mandatory 30-day out period.
    • Resident camping is prohibited.
    • No person under 18 may camp in a county park unless accompanied by a parent or legal guardian.
    • No camp arrivals are permitted after 9 pm at Lake Solano campground; the source states no exceptions.
    • Campers must place a recreational vehicle, tent, or trailer at the site to prove occupancy.

    maximum stay: 14 days · mandatory out period: 30 days · Lake Solano campground arrival cutoff: <= 9 pm (The source states no exceptions.)

    “No camp arrivals are permitted after 9 pm at Lake Solano campground. No exceptions.”
  • Manufactured homesLimited

    Placement and occupancy of manufactured homes in unincorporated Solano County.

    • A manufactured dwelling is designed for, or occupied exclusively by, one family.
    • It must be installed on a foundation system as a fixture or improvement to real property unless installed as a temporary dwelling or in a mobilehome park.
    • A temporary dwelling is limited to a fixed term and must serve a purpose specified by the applicable zoning district.
    • A building permit is required for temporary or permanent mobile/manufactured homes.
    • A temporary-use permit may be required for a temporary mobile/manufactured home.
    • Well/septic and grading permits may be required.
    • Planning Division zoning approval is required, and a Temporary or Conditional Use Permit may be required.
    • Manufactured homes proposed for installation must have been manufactured after February 1975, subject to the stated exception for certain older homes and required HCD certification.

    occupancy: one family · manufacture date: after February 1975 (The source provides an exception for specified older mobile homes or commercial coaches with written California-licensed architect or professional-engineer certification.) · permit validity: 2 years (The permittee has 180 days to commence work.)

    “A Building Permit is required for temporary or permanent mobile/manufactured homes.”
  • Accessory dwellingsLimited

    Attached and detached accessory dwelling units and junior accessory dwelling units on residential lots governed by Solano County.

    • ADUs and JADUs are allowed only on residential lots.
    • Agricultural lots are treated differently: similar housing is classified as secondary dwellings and must meet different criteria.
    • The Solano County Planning Division regulates attached and detached ADUs under Chapter 28 of the Solano County Code.
    • ADUs are subject to the California Residential Code and the Solano County Code.
    • Building permit fees depend on ADU size, location, and project valuation.
    • Public facilities fees are waived for ADUs 749 square feet or smaller and prorated for ADUs 750 square feet or larger based on primary dwelling size.
    • Fire sprinklers are required for all detached ADUs unless all listed conditions are met: the dwelling meets the ADU definition, the existing primary dwelling does not have automatic fire sprinklers, the detached ADU does not exceed 1,200 square feet, and the ADU is on the same parcel as the primary dwelling.
    • The county page states that building permit applications for ADUs must be submitted online.

    public facilities fee waiver threshold: <= 749 square feet (Public facilities fees are prorated for ADUs 750 square feet or larger based on primary dwelling size.) · public facilities fee proration threshold: >= 750 square feet (Proration is based on primary dwelling size.) · detached ADU sprinkler exemption size limit: <= 1200 square feet (All other listed exemption conditions must also be met.)

    “ADUs and JADUs are allowed only on residential lots.”
  • Who permits septicCounty

    Onsite sewage disposal permitting and inspection within Solano County cities identified by the county and surrounding unincorporated areas.

    • The county page states that Environmental Health has jurisdiction in Benicia, Dixon, Fairfield, Rio Vista, Suisun City, Vacaville, Vallejo, and surrounding unincorporated areas.
    • The page describes Environmental Health jurisdiction generally; it does not itself provide the detailed septic-specific allocation of authority.
    “EH has jurisdiction in the cities of Benicia, Dixon, Fairfield, Rio Vista, Suisun City, Vacaville, Vallejo, and surrounding unincorporated areas to issue permits, inspect facilities, investigate complaints, perform enforcement as necessary, and assists both the business community and the public.”
    One more reviewed finding on this topic
    • County — Onsite sewage disposal permitting and inspection by Solano County Environmental Health in the incorporated cities listed by the county and surrounding unincorporated areas.
      “EH has jurisdiction in the cities of Benicia, Dixon, Fairfield, Rio Vista, Suisun City, Vacaville, Vallejo, and surrounding unincorporated areas to issue permits, inspect facilities”
  • Off-grid sanitationLimited

    Remodeled or newly constructed waterfowl hunting clubs in the Suisun Marsh portion of Solano County within the BCDC planning jurisdiction.

    • Sewage holding tanks are required instead of septic systems for remodeled and newly constructed waterfowl hunting clubs.
    • Tanks must be pumped out by an approved service agent.
    • The rule is described as administered by the Solano County Department of Resource Management.
    “install sewage holding tanks only and to have the tanks pumped out by an approved service agent.”
  • Well permitRequired

    Water-well construction, modification, or destruction in Solano County.

    • A permit must be obtained from the applicable local environmental health agency or local water district before construction, modification, or destruction.
    • Water-well construction must be performed by a licensed C-57 Well Drilling Contractor.
    • Applicable local and state well standards apply.
    • Local enforcing agencies may inspect wells during and after construction, modification, or destruction.
    • Public-supply wells have additional State Water Resources Control Board Division of Drinking Water requirements.
    “Well owners need to obtain permits from local environmental health agencies or local water districts before construction, modification, or destruction takes place.”
    One more reviewed finding on this topic
    • Limited — Water wells associated with development or construction projects in Solano County.
      “The following permits may also be applicable: [...] Env. Health: Well Permit Septic Tank Permit Other Agencies: Depending upon the location and type of structure, permits from other agencies may be required such as water/sewer districts, Air Quality Management Districts, etc.”
  • Agricultural exemptionConditional

    Building permit requirements for shade cloth structures constructed for nursery or agricultural purposes in Solano County.

    • The exemption applies to shade cloth structures constructed for nursery or agricultural purposes.
    • Service systems are excluded from the exemption.
    • Separate plumbing, electrical, and mechanical permits are required for otherwise exempted items.
    • The source frames the exemption under CBC section 105.2 permit exemptions.
    “A building permit is required unless it is specifically exempted in the following list (CBC section 105.2). These items do not require building permits: [...] 10. Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.”
    2 more reviewed findings on this topic
    • Available — Mineral, oil, gas, or agricultural leases under the Solano County Subdivision Ordinance.
      “Mineral, oil, gas or agricultural leases;”
    • Available (with conditions) — Shade-cloth structures constructed for nursery or agricultural purposes in Solano County.
      “Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land in unincorporated Solano County.

    • A Tentative Map is required when a property owner wishes to subdivide for sale, lease, or financing.
    • The General Plan, Subdivision Ordinance, and Zoning Ordinance govern subdivision design.
    • A tentative map must be finaled within two years or it expires.
    • A map creating four or fewer new parcels is a Parcel Map; a map creating more than four new parcels is a Subdivision Map.
    • Typical conditions may include rights-of-way, easements, and street improvements.

    tentative-map finalization period: 2 years (unless an extension is approved; approval of a time extension is not automatic) · new parcels for Parcel Map: <= 4 parcels · new parcels for Subdivision Map: > 4 parcels

    “The General Plan, Subdivision Ordinance and Zoning Ordinance govern the design of the subdivision.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Divisions, reversions to acreage, lot-line adjustments, and mergers involving real property wholly or partially within unincorporated Solano County.
      “all divisions, reversions to acreage, lot line adjustments, and mergers respecting real property located wholly or partially within the unincorporated areas of Solano County.”
  • Building in a floodplainRequired

    New construction and substantial improvements of structures in a flood zone under the Solano County Building Division's jurisdiction.

    • The requirement applies to construction in a flood zone.
    • The lowest floor, including the basement, must be elevated above base flood depth.
    • Elevation must comply with State and Federal requirements.
    • A pre-construction elevation certificate prepared by a registered land surveyor or engineer documents the planned elevation.
    • A post-construction elevation certificate must be submitted before project completion.
    • Detailed requirements are in Solano County Code Chapter 12.2.

    lowest floor elevation: above base flood depth (according to State and Federal requirements)

    “New construction and substantial improvements of any structure shall have the lowest floor, including the basement, elevated above base flood depth”
  • Short-term rentalsLimited

    Short-term rental facilities in the unincorporated areas of Solano County.

    • A short-term rental is temporary occupancy for 30 consecutive calendar days or less, including portions of calendar days as full days.
    • The occupant is any person other than the resident family.
    • The lodging right may be granted by money exchange, concession, permit, right of access, license, gift, or other agreement.
    • Time-share or co-ownership occupancy is included when limited to 30 consecutive days or less.
    • An occasional home exchange of a dwelling used as the property owner's primary residence is excluded.
    • Before listing, the operator must apply for the appropriate permit, obtain a Business License, and register for a Transient Occupancy Tax Certificate.

    maximum stay: <= 30 consecutive calendar days (portions of calendar days count as full days)

    “Stay is for a time period of 30 consecutive calendar days or less, includes portions of calendar days as full days.”
  • Permit feesVariable (with conditions)

    Building, plumbing, electrical, and mechanical permit fees administered by the Solano County Building & Safety Division.

    • Fees are charged for each type of permit.
    • The permit fee is based on project valuation and square footage.
    • Fees are calculated from fee tables established in the code.
    • The page does not provide specific fee amounts.

    fee basis: project valuation and square footage

    “The permit fee is based on the valuation and square footage of the project, and calculated from fee tables established in the code.”
  • Permit processPublished (with conditions)

    County building permit applications in unincorporated Solano County.

    • The general process is to determine project requirements, register in the online permit system and submit the application, have plans reviewed by the county, pay permit fees, and obtain required inspections after construction starts.
    • The page states that the process varies depending on the type of permit.
    “Although the process varies depending on the type of permit, these are the general steps to get started on your building permit:”

California rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    Exemption from California contractor-licensing chapter for an owner-builder who builds or improves a structure on the owner’s property; this does not itself establish exemption from local building permits, inspections, or other code requirements.

    • For work personally performed by the owner or performed by the owner’s employees, none of the improvements may be intended or offered for sale, and employee compensation must be wages as their sole compensation.
    • For work directly contracted to licensed trade contractors, the owner must directly contract with licensees duly licensed for the respective trades.
    • For single-family residential structures under the licensed-contractor arrangement, no more than four structures may be intended or offered for sale in a calendar year; this limitation does not apply if the owner contracts with a general contractor for construction.
    • For a homeowner improving a principal residence or its appurtenances, the work must be performed before sale, the homeowner must have actually resided in the residence for the 12 months before completion, and the homeowner must not have used this exemption on more than two structures more than once during any three-year period.
    • A nonprofit corporation may qualify when assisting an owner-builder participating in a mutual self-help housing program.
    • Sale or offering for sale within one year after completion creates a rebuttable presumption that the structure was undertaken for sale; sale or offering for sale of five or more structures within one year creates a conclusive presumption.
    • This is a contractor-licensing exemption and should not be treated as a building-permit exemption.

    single-family structures intended or offered for sale: <= 4 structures per calendar year (Does not apply if the owner contracts with a general contractor for construction.) · prior residence occupancy: >= 12 months before completion (Applies to the principal-residence homeowner exemption.) · owner-builder exemption use: <= 2 structures during any three-year period (The statute states the homeowner has not availed himself or herself of the exemption on more than two structures more than once during any three-year period.) · sale presumption period: 1 year after completion (Sale or offering for sale creates a rebuttable presumption; five or more structures creates a conclusive presumption.) · conclusive-presumption threshold: >= 5 structures within one year after completion (Structures sold or offered for sale by the owner-builder.)

    “This chapter does not apply to any of the following: (1) An owner who builds or improves a structure on his or her property”
    3 more reviewed findings on this topic
    • Available (with conditions) — Owners who build or improve a structure on their own California property, including qualifying principal-residence improvements; this is a California contractor-licensing exemption and does not eliminate applicable building-permit or inspection requirements.
      “(a) This chapter does not apply to any of the following: (1) An owner who builds or improves a structure on his or her property”
    • Conditional — Owners who build or improve structures on their own property, and homeowners improving their principal residence or appurtenances, subject to Business and Professions Code section 7044.
      “(a) This chapter does not apply to any of the following: (1) An owner who builds or improves a structure on his or her property”
    • Available (with conditions) — California contractor-licensing requirements for an owner who builds or improves a structure on the owner’s property; this is not stated as an exemption from building permits, inspections, or other code requirements.
      “This chapter does not apply to any of the following: (1) An owner who builds or improves a structure on his or her property”
  • Certificate of occupancyRequired

    Completed construction projects within HCAI jurisdiction involving California health facilities.

    • The HCAI Compliance Officer issues the project-completion Substantial Compliance or Certificate of Occupancy once required conditions are met.
    • The stated examples include delivery of all test reports to the Inspector of Record, clearance of outstanding items, and completion of the Testing, Inspection and Observation Program.
    • Once construction is completed, the certificate of occupancy allows the owner to apply to the Department of Health Services for a license to operate the health facility.
    “Issues the certificate of occupancy and/or construction final.”
  • Tiny homesAllowed (with conditions)

    Occupancy of a structure marketed or described as a tiny home in California.

    • The tiny home must comply with applicable standards and be approved as a HUD-Code manufactured home, California Residential or Building Code home, factory-built housing, recreational vehicle, park trailer, or camping cabin.
    • The location must be approved for the applicable classification.
    • A tiny home that does not fit one of those classifications and does not comply with the California Building Standards Code is a noncomplying structure whose occupancy is illegal.
    • Approving and enforcing agencies vary depending on whether the unit is inside or outside a mobilehome or special occupancy park.

    park trailer or RV gross area limit: <= 400 square feet (Applicable classification-specific exclusions and standards apply.)

    “In order to be occupied, a tiny home must comply with the standards of, and be approved as one of the following types of structures: a HUD-Code manufactured home (MH), California Residential Code or California Building Code home, factory-built housing (FBH), recreational vehicle (RV), park trailer (PT) or camping cabin (CC).”
  • Septic permitLimited

    New, replacement, and corrective-action OWTS in California; existing properly functioning systems may fall under Tier 0 rather than new/replacement permitting requirements.

    • Tier 1 applies to qualifying new or replacement OWTS when no Regional Water Board-approved LAMP exists, with a maximum flow of 3,500 gallons per day.
    • Tier 2 applies to qualifying new or replacement OWTS under an approved LAMP, with a maximum flow of 10,000 gallons per day.
    • Tier 3 applies near impaired surface waters subject to a TMDL, a special LAMP provision, or within 600 feet of a water body listed on OWTS Policy Attachment 2; supplemental treatment may apply.
    • Tier 4 applies to systems that are not properly functioning and require corrective action.
    • Local agencies issue the permits and local LAMP requirements may differ from Tier 1.

    Tier 1 maximum flow: <= 3500 gallons per day (Qualifying new or replacement OWTS without an approved LAMP.) · Tier 2 maximum flow: <= 10000 gallons per day (Qualifying new or replacement OWTS under an approved LAMP.) · Tier 3 water-body setback: <= 600 feet (Applies to a water body listed on OWTS Policy Attachment 2.)

    “Tier 1 applies when a Local Agency Management Program (LAMP) has not been approved by the Regional Water Board. Maximum flow rate is 3,500 gpd.”
    One more reviewed finding on this topic
    • Required — New and replacement onsite wastewater treatment systems (OWTS), commonly known as septic systems, statewide in California.
      “Every new or replacement septic system requires a permit, either through your local jurisdiction (City or County) OR from the Central Coast Water Board.”
  • Septic inspectionLimited

    OWTS in a Tier 3 Advanced Protection Management Program with supplemental treatment components, including systems in specified impaired-water-body areas statewide.

    • The requirement applies to OWTS in an Advanced Protection Management Program with supplemental treatment components.
    • Ongoing monitoring must follow the OWTS operation and maintenance manual or occur more frequently if required by the local agency or Regional Water Board.
    • Where telemetry is not possible, the owner or owner's agent must inspect at least monthly while the system is in use and notify the service provider at least quarterly of observed operating parameters.
    • For systems designed to meet disinfection requirements, a service provider must inspect proper operation quarterly while the system is in use unless continuous telemetric monitoring is capable of assessing operation.
    • Quarterly effluent sampling and certified-laboratory requirements apply to systems subject to the disinfection provisions.

    inspection frequency where telemetry is not possible: per monthly (While the system is in use.) · inspection frequency for disinfection systems: per quarterly (While the system is in use, unless continuous telemetric monitoring is capable of assessing operation.)

    “Where telemetry is not possible, the owner or owner’s agent shall inspect the system at least monthly while the system is in use as directed and instructed by a service provider and notify the service provider not less than quarterly of the observed operating parameters of the OWTS. [...] OWTS in an Advanced Protection Management Program designed to meet the disinfection requirements in Section 10.10 shall be inspected for proper operation quarterly while the system is in use by a service provider unless a telemetric monitoring system is capable of continuously assessing the operation of the disinfection system.”
  • Mandatory utility hookupSewer (with conditions)

    Certain existing OWTS in California Tier 3 impaired-water-body areas that commit to connect to a centralized wastewater collection and treatment system regulated through waste discharge requirements.

    • The OWTS must have been constructed and operating, or permitted, on or before the date the nearby water body was added to OWTS Policy Attachment 2.
    • The owner must commit by legally binding document to connect to a centralized wastewater collection and treatment system regulated through waste discharge requirements.
    • The owner must sign the legally binding document within 48 months after the nearby water body's initial listing on Attachment 2.
    • The specified connection date may not extend beyond nine years after the date the nearby water body is added to Attachment 2.
    • The rule is an exception to Section 10 requirements for qualifying existing or permitted systems; it is not a general statewide requirement that every property connect to public sewer.

    deadline to sign connection commitment: 48 months (Measured from the date the nearby water body is initially listed on Attachment 2.) · maximum time to complete connection: <= 9 years (Measured from the date the nearby water body is added to Attachment 2.)

    “The owner must sign the document within forty-eight months of the date that the nearby water body is initially listed on Attachment 2. The specified date for the connection to the centralized community wastewater collection and treatment system shall not extend beyond nine years following the date that the nearby water body is added to Attachment 2.”
  • Driveway accessRequired

    Driveways and driveway connections involving proposed encroachments within, under, or over State highway rights of way.

    • The requirement applies to proposed activities related to placement of encroachments within, under, or over State highway rights of way.
    • Applications are submitted to the appropriate District Encroachment Permits Office having jurisdictional authority over the site.
    • Local or other agency requirements may also apply outside State highway rights of way.
    “An encroachment permit must be obtained for all proposed activities related to the placement of encroachments within, under, or over the State highway rights of way.”
  • Campground & park staysLimited

    Occupancy and use of manufactured homes and mobilehomes in California mobilehome parks and other locations subject to HCD jurisdiction.

    • HCD administers titling and registration for manufactured homes and mobilehomes.
    • HCD-inspected mobilehome parks are subject to health and safety enforcement where local government has not assumed enforcement.
    • Manufactured/mobilehome park regulations address construction, use, maintenance, and occupancy.
    • Separate local land-use, building, fire, health, and utility requirements may apply.
    “MHs may be occupied outside or inside of mobilehome parks and installation and approval for occupancy is governed by the Mobilehome Parks Act (MPA), HSC Sections 18200, et seq., and Title 25, CCR Sections 1000, et seq.”
    2 more reviewed findings on this topic
    • Limited — RV and trailer camping at Silver Strand State Beach Campground in the San Diego Coast District.
      “Camping Stay Limits: Applies to persons, equipment, or vehicles and any combination thereof [...] Maximum stay of 30 days per calendar year [...] Maximum 7 consecutive days during peak season (May 15 – September 15) [...] Maximum 14 consecutive days during non-peak season”
    • Limited — Occupancy and use of recreational vehicles in California special occupancy parks and designated RV sections of mobilehome parks.
      “Unless otherwise allowed by a local ordinance, RVs generally may be occupied only in mobilehome parks or special occupancy parks governed by the Mobilehome Parks Act”
  • county zoning authorityGeneral

    California county legislative bodies' authority to adopt zoning ordinances regulating buildings, structures, land uses, lots, yards, open space, lot coverage, intensity of use, parking, loading, and setbacks within county jurisdiction, including unincorporated areas.

    • The authority is exercised pursuant to Government Code Chapter 4, Zoning Regulations.
    • The statute separately authorizes city legislative bodies; incorporated municipalities may exercise their own zoning authority.
    • Government Code Section 65850 also lists authority to regulate signs and billboards, building and structure location, height, bulk, number of stories, and size, lot and open-space size and use, lot coverage, intensity of land use, offstreet parking and loading, and building setback lines.
    • The cited section states it was amended by Stats. 2017, Ch. 376, Sec. 1, effective January 1, 2018.
    “The legislative body of any county or city may, pursuant to this chapter, adopt ordinances that do any of the following:”
  • county building authorityGeneral

    California counties administering and enforcing state building standards through county building departments, including residential construction in unincorporated areas.

    • Each county must maintain building standards and state building regulations in the office of the building official responsible for administration and enforcement of state building standards.
    • The statewide Title 24 standards apply subject to statutory exceptions and any authorized local amendments or local requirements.
    • The cited HCD bulletin concerns the 2019 California Building Standards Code and its July 1, 2021 supplement; later code editions may supersede those particular edition dates.
    “These codes shall be maintained in the office of the building official responsible for the administration and enforcement of state building standards”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Lot coverage — Lot-coverage standards in unincorporated Solano County.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Water rights & wells in Solano County

Whether a new home can legally get its own water here — the sub-state groundwater regime, from California’s water agency.

Actively managed

This basin is under active state management — new water use is scrutinized, though a domestic well is usually still allowed.

Household wellPermit required — restricted

California requires no STATE permit for a domestic well — wells are permitted by the county — but under SGMA a Groundwater Sustainability Agency can meter or restrict new wells in medium/high-priority and critically overdrafted basins, and Executive Order N-7-22 requires counties in those basins to get GSA verification that a new well is consistent with the Groundwater Sustainability Plan before permitting.

Limit: 2 acre-feet/year de minimis under SGMA (Water Code §10721(e)) — largely exempt from GSA metering/fees

California DWR / State Water Board — SGMA de minimis & EO N-7-22 Action 9 FAQ ↗
  • Sacramento Valley high-priority subbasinspartial of county

    High-priority SGMA subbasins (Corning, Colusa, Vina, Antelope-Tehama, South Yuba, North & South American, Solano, Yolo) with adopted GSPs; a new well is subject to GSA/EO N-7-22 consistency review.

    California DWR — SGMA Basin Prioritization ↗

Hybrid state (appropriation + riparian). Groundwater rules change and basin boundaries follow the aquifer, not the county line — confirm current well and appropriation rules with the California state water agency before you buy or drill.Groundwater governance as of Jul 2026, cited to each administering agency.

Living off-grid in Solano County, California

Is Solano County a good place to live off-grid or homestead?

Solano County scores 22/100 on the Bolthole Index, a weak county profile. Watch-outs: about 426,899 people within a 30-minute drive and elevated mid-century heat, water, rain, or wildfire exposure.

Do you need a building permit in Solano County, California?

Solano County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Solano County Environmental Health Division (Onsite Sewage Disposal Program). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

Can you live in an RV or tiny home on your land in Solano County?

Living in an RV on your own land in Solano County is allowed on a temporary basis only: Statewide rule. Occupancy of recreational vehicles as residential units in California. RVs are not intended for occupancy as permanent dwellings. Unless a local ordinance allows otherwise, RV occupancy generally is limited to mobilehome parks or special occupancy parks governed by the Mobilehome Parks Act or Special Occupancy Parks Act. A tiny home is allowed. Confirm with the county before relying on it.

How much does land cost in Solano County, California?

Land in Solano County runs about $12,901 per acre, based on the latest county data.

What is the water situation in Solano County?

Solano County gets about 20.8" of rain a year, with severe drought in roughly 40.4% of years. On water rights, Solano County lies in the Sacramento Valley high-priority subbasins — High-priority SGMA subbasins (Corning, Colusa, Vina, Antelope-Tehama, South Yuba, North & South American, Solano, Yolo) with adopted GSPs; a new well is subject to GSA/EO N-7-22 consistency review..

How remote is Solano County?

A representative private-land location has about 426,899 people within a 30-minute drive and 12,240,589 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Solano County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Solano compares in California

Compare side-by-side →See all 58 California counties ranked →