Dixon, California requires building permits for residential construction through the city Building Division, and Dixon sets its own zoning inside city limits.123 Solano County Environmental Health handles onsite sewage matters inside Dixon; city building approval does not replace county sewage-disposal review.45
At a glance
- Building permits
- City applications through Dixon Civic Access2
- Zoning
- City zoning districts apply inside Dixon3
- Septic authority
- Solano County Environmental Health4
- Minimum lot size
- RL: 7,000 sq ft, with qualifying urban-lot-split exceptions; RM: 8,000 sq ft67
- RV living
- State limits apply; a Dixon private-lot exception is unconfirmed8
- Tiny homes
- Approved structure classification and approved location required9
- Owner-builder
- Conditional contractor-license exemption, not a building-permit exemption10
Who to call
Building permits
City of Dixon Building Division
City building applications and inspections through Civic Access
600 E A St., Dixon CA 95620
Zoning
City of Dixon Planning Division
City development applications and planning inspections
600 E A St., Dixon CA 95620
Floodplain permits
City of Dixon Planning Division
Information on floodplain boundaries and zoning district regulations
Septic permits
Solano County Environmental Health Division - Technical Services
Onsite sewage disposal program questions
675 Texas Street, Suite 5500, Fairfield, CA 94533
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Dixon means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Dixon, CA?
Residential construction in Dixon requires a building permit before work under California’s building-permit framework, with applications handled through the city’s Civic Access system.12 Dixon’s own handout expressly requires a building permit for alterations to building, plumbing, mechanical or electrical systems.11 Dixon adopts the 2025 California Residential Code subject to local amendments, so ask the Building Division which amendments and project-specific exemptions apply to your plans.12 California’s conditional owner-builder exemption concerns contractor licensing; the exemption does not remove building-permit or code obligations.10
Who issues Dixon building permits, and how do you apply?
Contact the Dixon Building Division for city building applications and the Dixon Planning Division for development applications and planning inspections.1314 Dixon requires applications through Civic Access unless special arrangements are made in advance.13 An account is required, and Dixon starts review only after receiving a complete application and payment.2 Dixon’s fees depend on the date of a complete submittal, are due before approval, and may include state charges, city surcharges and impact fees.15 After the city issues a building permit, applicants can request inspections through Civic Access.2
Does Dixon have zoning, lot-size rules and setbacks?
Dixon has its own zoning districts, and the official zoning map is maintained by the City Clerk.316 In Dixon’s Residential Low Density district, the minimum lot size is 7,000 square feet, with smaller lots possible through qualifying SB9 urban lot splits; the Residential Medium Density minimum is 8,000 square feet.67 RL front setbacks are 20 feet with garage exceptions, and side setbacks are 12 feet on one side and 5 feet on the other, subject to narrow-lot and corner-lot rules.17 RM front setbacks are 20 feet and side setbacks are 10 feet, subject to the stated exceptions.18 Maximum lot coverage is 45% in RL and 60% in RM; a lot meeting the minimum area still needs a design that meets the applicable district standards.1920
How do septic permits work inside Dixon?
Solano County Environmental Health’s jurisdiction includes Dixon for onsite sewage and environmental-health functions.4 For a sewage-disposal application, submit the complete application and fee to Environmental Health for review and approval before beginning work.5 Contact the county’s Technical Services office to establish which sewage-disposal review your Dixon project needs.5 Solano County’s soil data show only 3.3% of soils rated not limited for conventional septic drain fields; that countywide screening does not establish whether a Dixon parcel can support septic, so plan for a site evaluation rather than treating the percentage as a prohibition.21
Can you live in an RV or tiny home on land in Dixon?
California generally limits RV occupancy to mobilehome parks or special occupancy parks unless a local ordinance allows otherwise, and RVs are not intended as permanent dwellings.8 We could not confirm a Dixon exception allowing residential RV occupancy or temporary camping on a private lot; ask the Dixon Planning Division about the proposed address and duration before relying on an RV while building.14 A tiny home in Dixon must have an approved structural classification and an approved location under California’s tiny-home framework.9 We could not confirm Dixon’s specific tiny-home occupancy rule or minimum dwelling size; ask city Planning about the location and the Building Division about the structure.1413
Building a home in Dixon: what are the steps in order?
- Identify the Dixon parcel’s zoning district and ask city Planning to check the proposed use and applicable dimensional standards.316
- Resolve wastewater arrangements with Solano County Environmental Health if the Dixon project involves onsite sewage; submit the sewage-disposal application and fee before work.45
- Create a Dixon Civic Access account and submit the complete city building application with payment to begin review.2
- Obtain the required building permit before construction, then request city inspections through Civic Access after issuance.12
- Ask Dixon Planning about floodplain boundaries and Engineering about vegetation or structures near the driveway’s street or sidewalk intersection, which can require city review.2223
What stays with Solano County, and what should Dixon buyers check?
Solano County Environmental Health remains the onsite-sewage authority inside Dixon, while Dixon administers city building applications and its zoning districts.423 California requires local environmental-health or water-district approval before well construction, modification or destruction; ask Solano County Environmental Health which well authority applies to the Dixon address.244 We could not confirm Dixon’s mandatory public-water or sewer connection conditions, so resolve service availability and connection obligations with city staff before assuming a well or septic system is an option.14 For property outside Dixon city limits, use the Solano County guide for the county’s unincorporated-area building rules.25
Watch-outs
- We could not confirm a Dixon agricultural building-permit exemption; ask the city Building Division before treating a farm structure as exempt.13
- Dixon driveway-intersection visibility review applies to vegetation and structures within 10 feet of the street or sidewalk intersection.23
- County building and zoning rules for unincorporated Solano County do not establish Dixon city requirements.25263
Sources
- Do I need a building permit for my project? (California statewide rule), quoted and re-checked
- Permits (Dixon), quoted and re-checked
- Chapter 18.03: Zoning Districts and Zoning Map (Dixon), quoted and re-checked
- Environmental Health (Dixon), quoted and re-checked
- Solano County Environmental Health Division - Technical Services (solanocounty.gov)
- Chapter 18.04: Residential Districts (Dixon), quoted and re-checked
- Chapter 18.04: Residential Districts (Dixon), quoted and re-checked
- hcd.ca.gov (California statewide rule), quoted and re-checked
- Information Bulletin 2016-01: Tiny Homes (California statewide rule), quoted and re-checked
- California Business and Professions Code section 7044 (California statewide rule), quoted and re-checked
- cityofdixonca.gov (Dixon), quoted and re-checked
- Chapter 16.16: Residential Code (Dixon), quoted and re-checked
- City of Dixon Building Division (cityofdixonca.gov)
- City of Dixon Planning Division (cityofdixonca.gov)
- Permits (Dixon), quoted and re-checked
- Chapter 18.03: Zoning Districts and Zoning Map (Dixon), quoted and re-checked
- Chapter 18.04: Residential Districts (Dixon), quoted and re-checked
- Chapter 18.04: Residential Districts (Dixon), quoted and re-checked
- Chapter 18.04: Residential Districts (Dixon), quoted and re-checked
- Chapter 18.04: Residential Districts (Dixon), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- City of Dixon Planning Division (cityofdixonca.gov)
- ecode360.com (Dixon), quoted and re-checked
- Well Standards (California statewide rule), quoted and re-checked
- When is a Building Permit Required? (2026 county census)
- Planning Services (2026 county census)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.