A Uniform Dwelling Code building permit is required for a new one- or two-family home in Ozaukee County, Wisconsin, and the delegated town, village or city issues it, or the state DSPS where the municipality lacks authority1. General zoning approval also comes from the parcel’s municipality; the county itself zones only shoreland and floodplain areas in unincorporated land2. Septic permits for all unsewered development, in a town or village alike, come from the Ozaukee County Land & Water Management Department3.
Do you need a building permit in Ozaukee County, Wisconsin?
Yes.
Yes. Wisconsin's Uniform Dwelling Code applies to new one- and two-family dwellings, including manufactured-home installations, in Ozaukee County1. A UDC permit is required for stick-built, modular and manufactured-home installations, and the delegated municipality issues it or DSPS does when the municipality lacks authority1. The application includes plans, required project data, the fee and contractor information when applicable1. Required inspections cover footings, foundation, rough work, insulation and final work; notify the inspector identified on the UDC permit1. An owner who occupies or will occupy the completed home may take out the construction and erosion-control permits without Dwelling Contractor certification, but plumbing and electrical work stay under licensed-professional rules and the allowance does not waive code, permit or inspection requirements5,8. Detached garages and accessory buildings fall outside the UDC, so ask the parcel's municipality what permit they need5. Like the counties around it, Ozaukee County requires a building permit9.
Who issues building permits in Ozaukee County, and what stays with the county?
Ozaukee County has no single building counter for every new home; the delegated municipality administers the UDC permit, or DSPS does when the municipality lacks authority.
Ozaukee County has no single building counter for every new home; the delegated municipality administers the UDC permit, or DSPS does when the municipality lacks authority1. Start with the parcel's town, village or city to identify the correct permit issuer and inspector9. The Town of Grafton's Building Inspector is one local example, not a countywide office: Grafton requires the proper permit when a contractor or homeowner performs work on a home, and contractors usually pull their own permits9. Grafton lists a fence as its only permit exception as of March 20239. During UDC construction, call for each inspection before covering the work; the inspector has two business days after the request and the work is ready before it may be covered5. Building permits come from the municipality or DSPS, but septic permits and shoreland and floodplain zoning approvals stay with the Ozaukee County Land & Water Management Department2,3.
Does Ozaukee County have zoning?
Ozaukee County does not apply general county zoning to all private land; towns, villages and cities handle general zoning, while the county handles shoreland and floodplain zoning in unincorporated areas.
Ozaukee County does not apply general county zoning to all private land; towns, villages and cities handle general zoning, while the county handles shoreland and floodplain zoning in unincorporated areas2. County zoning applies within 300 feet of a stream, within 1,000 feet of a lake or flowage, or in a floodplain extending beyond those distances2. The county floodplain ordinance divides regulated land into Floodway, Floodfringe, General Floodplain, Coastal Floodplain and Flood Storage districts10. County shoreland districts have minimum lot sizes, lot widths and water setbacks, though the available rules do not supply a single numeric standard for every parcel, and municipal rules may be stricter6. Floodplain subdivision proposals, including manufactured-home parks, must include regional flood-elevation and floodway data11. Starting shoreland or floodplain work without the county permit is a violation10. The Village of Newburg, which lies mainly in Washington County and reaches into Ozaukee County, sets its own zoning code12. Ask the parcel's municipality about allowed uses, RVs, tiny homes, ordinary setbacks, minimum home size, height and lot coverage outside the county's limited jurisdiction2.
How do septic permits work in Ozaukee County?
The Ozaukee County Land & Water Management Department administers the county sanitation ordinance, and sanitary regulation applies to all unsewered development in Ozaukee County.
The Ozaukee County Land & Water Management Department administers the county sanitation ordinance, and sanitary regulation applies to all unsewered development in Ozaukee County3. Submit the sanitary permit application to the appropriate governmental unit before obtaining a permit for a private onsite wastewater treatment system; the county form covers new, replacement, modified, holding-tank, in-ground, at-grade and mound systems4. Systems installed or modified through this process must be installed, inspected, tested, operated and maintained under the applicable state rules and operation manual4. All wastewater from unsewered development must discharge into the POWTS, so an off-grid plan does not bypass county sanitary review13. Only 6.9% of Ozaukee County soils rate free of severe limitations for a conventional drain field, making a parcel-specific site evaluation important before assuming a conventional system will work7. A UDC home using a private well also needs a well permit from the county or municipality5.
Can you live in an RV or tiny home on your land in Ozaukee County?
We could not confirm a countywide rule allowing long-term RV or tiny-home occupancy on private land in Ozaukee County.
We could not confirm a countywide rule allowing long-term RV or tiny-home occupancy on private land in Ozaukee County. The parcel's town, village or city handles general zoning outside the county's limited shoreland and floodplain jurisdiction, so ask that municipality whether the proposed unit, placement and occupancy are allowed2. County sanitary regulation applies to all unsewered development, and all wastewater must discharge into the approved POWTS, so discuss the sanitation plan with the Ozaukee County Land & Water Management Department before occupying the site13. A manufactured-home installation used as a residence is subject to the UDC permit requirement1. For a UDC-covered dwelling, occupancy follows a final inspection with no major health or safety violations; some municipalities also issue an occupancy permit5. We could not confirm a countywide minimum dwelling size, temporary-camping rule or tiny-home occupancy rule, making the parcel's municipality the essential first call.
How do you build a home in Ozaukee County, step by step?
Identify the parcel's town, village or city, then confirm its zoning and whether that municipality or DSPS administers the UDC permit.
- Identify the parcel's town, village or city, then confirm its zoning and whether that municipality or DSPS administers the UDC permit1,2.
- Ask the municipality about allowed use, setbacks, minimum dimensions and permits for work outside the UDC's one- and two-family scope1.
- For an unsewered site, submit the required sanitary application through the Ozaukee County process before obtaining the sanitary permit4.
- Obtain a county or municipal well permit if the UDC home will use a private well5.
- If unincorporated land is in a county shoreland or floodplain district, obtain the applicable approval before development2,10.
- Submit the UDC application, plans, required project data, fee and contractor information when applicable1.
- Call the permit's inspector for the footing, foundation, rough, insulation and final inspections1.
- Occupy the dwelling only after a final inspection finds no major health or safety violations, and ask whether the municipality issues an occupancy permit5.
What should you check before buying land in Ozaukee County?
Identify the parcel's town, village or city before buying because that municipality generally decides permitted uses and dimensional rules.
Identify the parcel's town, village or city before buying because that municipality generally decides permitted uses and dimensional rules2. Check whether unincorporated land falls within 300 feet of a stream, within 1,000 feet of a lake or flowage, or in a floodplain extending farther; those locations bring county shoreland or floodplain zoning into the review2. County permit fees are $50 for a shoreland permit, $250 for a floodplain permit and $0.25 per square foot of structure footprint, and starting work before the permit is issued can bring fees up to ten times the applicable charges14. Obtain a septic site evaluation early because only 6.9% of county soils rate free of severe limitations for a conventional drain field7. Confirm wastewater and private-well permits before committing to an unsewered parcel4,5. A driveway connecting to a state highway requires a WisDOT permit, while we could not confirm a countywide local-road access rule15. The typical property-tax bill is about $4,629 per year at an effective rate near 1.3%7.
Watch-outs
- Ozaukee County's private-land zoning role is limited to shoreland and floodplain development in specified unincorporated areas; ask the parcel's town, village or city about general zoning2.
- The Town of Grafton stopped requiring a permit for a plain fence only as of March 2023 - almost everything else still needs one, and other Ozaukee County towns may set their own list of exceptions, so confirm with your own municipality9.
Sources
15 official pages, each quoted and re-checked · written October 15, 2026
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings)
- Shoreland & Floodplain Resources
- Septic Resources
- Septic Resources
- Information on Wisconsin’s Uniform Dwelling Code
- Chapter VII Shoreland and Floodplain Zoning Ordinance
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Instructions for Submitting a UDC Permit Application
- Town of Grafton (Ozaukee County) - Building Inspection / UDC (2026 county census)
- Ozaukee County Floodplain Zoning Ordinance
- Ozaukee County Floodplain Zoning Ordinance, Chapter 18
- Village of Newburg: official source (Ozaukee County)
- ozaukeecounty.gov
- Chapter 19 Ozaukee County Shoreland Protection Ordinance
- State highway connection permits (driveways & more) (Wisconsin statewide rule)
Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Ozaukee County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.