A building permit is required for a new one- or two-family home in Fond du Lac County, Wisconsin, including a manufactured-home installation1. Fond du Lac County has no countywide zoning: each of its 21 towns, and each village and city, sets its own zoning and issues its own permits2. The county handles septic permits and reviews qualifying land divisions outside incorporated areas3,4,5.
Do you need a building permit in Fond du Lac County, Wisconsin?
Yes.
Yes. A UDC permit is required for a new one- or two-family dwelling in Fond du Lac County, including stick-built, modular and manufactured-home installations1. Wisconsin's Uniform Dwelling Code governs one- and two-family homes, while the responsible permit authority may be the municipality or DSPS depending on delegated authority1. The Town of Fond du Lac separately requires a building permit before a covered building or structure is erected, reconstructed, altered, moved or enlarged4. Required new-home inspections include footings, foundation and reinforcement, rough work, insulation and final inspection; the applicant must notify the inspector shown on the permit1. An owner who occupies or will occupy the dwelling may use the owner-occupant route for construction and erosion-control permits, but that does not waive permits or code requirements7.
Who issues building permits in Fond du Lac County, and how do you reach them?
The correct permit counter depends on the parcel's municipality because zoning varies among Fond du Lac County's towns, villages and cities.
The correct permit counter depends on the parcel's municipality because zoning varies among Fond du Lac County's towns, villages and cities3. Start by identifying that municipality and its UDC inspection agency; where a municipality has delegated authority, apply locally, and otherwise DSPS handles the application1. Fond du Lac County Planning & Development can help with parcel mapping and local contacts at 160 S. Macy Street, Fond du Lac, or (920) 929-313810. County Code Enforcement handles county shoreland and floodplain questions at (920) 929-314010. Permit fees vary by municipality, and the state permit-seal fee for each new dwelling is $3011. In the Town of Fond du Lac, the written application goes to the Building Inspector, an approved permit must be displayed at the site, and the permit lasts 12 months unless substantial work begins4.
Does Fond du Lac County have zoning?
Fond du Lac County does not have countywide zoning: each of its 21 towns controls its own zoning ordinance and has its own permit issuer.
Fond du Lac County does not have countywide zoning: each of its 21 towns controls its own zoning ordinance and has its own permit issuer2. Villages and the City of Fond du Lac also control their own zoning, and the county's GIS zoning layer is for reference only, so get zoning documents from the town, village or city3. County shoreland, floodplain, subdivision and sanitary rules may still apply3. Because the county sets no general zoning, it sets no countywide minimum dwelling size or tiny-home zoning rule either, but town or municipal ordinances may, and building-code, septic and other requirements still apply2. In the Town of Fond du Lac, zoning districts have their own use and dimensional rules, and the official zoning map is available for inspection at Town Hall4. That town's code regulates minimum lots, yards and setbacks, lot coverage, building height and structure size, but the extracted rules do not supply a single numeric standard for every district4. In unincorporated shoreland areas, lots without sewer generally need at least 20,000 square feet and 100 feet of average width, while sewered lots generally need at least 10,000 square feet and 65 feet of average width8. Shoreland structures generally sit at least 75 feet from the ordinary high-water mark8.
How do septic permits work in Fond du Lac County?
Fond du Lac County is the sanitary-permit authority for private sewage systems, although a property served by public sewer may fall outside that requirement.
Fond du Lac County is the sanitary-permit authority for private sewage systems, although a property served by public sewer may fall outside that requirement4. New construction served by a newly constructed POWTS needs a valid sanitary permit when the county land-use permit is issued, and other municipal, state or federal permits may also apply6. Contact the Fond du Lac County Code Enforcement Office's POWTS program at (920) 929-3139 before finalizing the building layout12. Wisconsin also requires inspection of POWTS construction and installation under the plan-review approval, with the permitting agency as the inspection contact13. Only about 25.3% of the county's mapped soils rate free of severe limitations for a conventional drain field, so septic feasibility deserves attention before purchase14. Buildings with plumbing but no public-sewer connection must still provide for wastewater treatment, recycling, dispersal or holding under Wisconsin POWTS rules15. Wisconsin DSPS says installed systems must be visually inspected at least once every three years16. Fond du Lac County also assesses $13 a year to property owners with a private onsite wastewater system, starting with the 2025 tax year17.
Can you live in an RV or tiny home on your land in Fond du Lac County?
We could not confirm one rule allowing long-term RV living or tiny-home occupancy on every private parcel in Fond du Lac County, and the county itself does not zone for either one.
We could not confirm one rule allowing long-term RV living or tiny-home occupancy on every private parcel in Fond du Lac County, and the county itself does not zone for either one2. The county's own RV time limit applies only to its Columbia Park and Waupun County Park campgrounds, where no camping unit may stay more than 14 days in any four-week period18. The practical answer depends first on the parcel's town, village or city because local zoning varies across the county3. Ask the local zoning authority whether the proposed unit is a dwelling, a camping unit or an accessory structure, and ask what district, dimensional and occupancy rules apply. The Town of Fond du Lac, for example, uses district-specific rules and an official zoning map rather than one standard for every property4. A manufactured home used as a new dwelling is expressly within the state permit framework, but local land-use and sanitary requirements still apply1. Fond du Lac County Planning & Development can help identify the correct municipality, but the local zoning authority should give the parcel-specific answer10.
Building a home in Fond du Lac County: the steps, in order
Identify the parcel's town, village or city and confirm the zoning district, allowed use and dimensional standards with that municipality.
- Identify the parcel's town, village or city and confirm the zoning district, allowed use and dimensional standards with that municipality3.
- If dividing land outside an incorporated area into a parcel of 35 acres or less, obtain Fond du Lac County Planning review and approval5.
- Resolve county shoreland or floodplain conditions before fixing the building pad; prohibited work includes placing fill in a wetland or stream floodway6.
- For a new POWTS, obtain the county sanitary permit alongside the county land-use permit6.
- Obtain a Well Construction Notification Number before most new private-well construction9.
- Submit the permit application, plans, required data and fee to the authority responsible for the parcel1.
- Call the inspector for each required phase, and occupy the home only after a final inspection finds no major health or safety violations1,19.
What should you check before buying land in Fond du Lac County?
Confirm the municipality and zoning district before making an offer because allowed uses and dimensional rules vary by town, village or city.
Confirm the municipality and zoning district before making an offer because allowed uses and dimensional rules vary by town, village or city3. For unincorporated shoreland property, check lot area and width, the ordinary-high-water-mark setback and impervious coverage: coverage up to 15% is ordinarily allowed, while coverage above 15% and up to 30% requires mitigation8. Check mapped floodplain conditions before selecting a building pad because floodway development is tightly limited and new structures, wells and sewage systems are prohibited in the floodway20. Test septic feasibility early because only about 25.3% of mapped soils lack severe limits for a conventional drain field14. Confirm access with the road authority; a driveway connection to a state highway requires a WisDOT permit21. For a private well, obtain the state notification number before most new construction9. A new private well that is not high-capacity needs advance notice to the Wisconsin DNR and a Well Construction Notification Number, with a $50.50 notification fee9.
Watch-outs
- Do not apply Town of Fond du Lac zoning standards to land in another municipality; the county has no countywide zoning and each town, village and city sets its own2.
- A qualifying land division outside an incorporated area needs county review when it creates land of 35 acres or less5.
- New construction using a newly built POWTS needs a valid sanitary permit when the county land-use permit is issued6.
- Shoreland property can face separate lot-size, setback and impervious-coverage standards even when local zoning also applies8.
Sources
21 official pages, each quoted and re-checked · written October 10, 2026
- UDC (Uniform Dwelling Code / One- and Two-Family Dwellings)
- Town Zoning
- Zoning
- Town of Friendship Zoning Ordinance
- Land Divisions
- Information Required for After-The-Fact Land Use Permit Application
- Instructions for Submitting a UDC Permit Application
- Wisconsin’s Shoreland Management Program
- Well and heat exchange notification
- Fond du Lac County Planning & Development (Principal Planner) (fdlco.wi.gov)
- Wisconsin Administrative Code SPS 302.34 (Wisconsin statewide rule)
- Fond du Lac County Code Enforcement Office (POWTS Program) (fdlco.wi.gov)
- Private Onsite Wastewater Treatment Systems (POWTS)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Wisconsin Administrative Code, SPS 382 (Wisconsin statewide rule)
- Private Onsite Wastewater Treatment Systems (POWTS)
- Official Proceedings of the Fond du Lac County Board of Supervisors, August 19, 2025 Session
- Code of Ordinances: Chapter 42 - Parks and Recreation, Sec. 42-7 - Campground regulations
- Wisconsin’s Uniform Dwelling Code
- Floodplain Development Basics (Wisconsin statewide rule)
- State highway connection permits (driveways & more) (Wisconsin statewide rule)
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Fond du Lac County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.