Village of Brandon is a village in Fond du Lac County, Wisconsin. Village of Brandon adopts its own zoning, so inside its limits Village of Brandon’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Fond du Lac County page.

Answers from the rulebook for Village of Brandon

Village of Brandon’s own rules

  • Building permitRequired

    New, moved, erected, enlarged, altered, demolished, razed, or used buildings and structures inside Brandon village limits.

    • Normal repairs to specified electrical, HVAC, and plumbing work are exempt.
    • The ordinance provides additional exceptions for qualifying minor repairs and maintenance.
    • A permit is issued only after the stated application, plan, subdivision, street, and utility conditions are met.
    “No building of any kind shall be moved within or into the Village and no new building or structure, or any part thereof, shall hereafter be erected, or ground broken for the same, or enlarged, altered, moved, demolished, razed or used within the Village, except as herein provided, until a permit therefor shall first have been obtained pursuant to this chapter by the owner, or his/her authorized agent, from the Building Inspector or Village Clerk.”
  • Building code adoptedAdopted (with conditions)

    Buildings inside Brandon village limits, including one- and two-family dwellings subject to the adopted Wisconsin code chapters.

    • The cited adoption is for municipal enforcement; the building code also adopts other state building-code portions for applicable building classes.
    “Chapters SPS 320 to SPS 325, Wis. Adm. Code, and subsequent revisions are adopted for municipal enforcement.”
  • InspectionsLimited

    Work and premises subject to Brandon's adopted Uniform Dwelling Code inside village limits.

    • Inspection officials may enter at reasonable hours for inspection purposes.
    • The cited provision establishes inspection authority and certified-inspector enforcement, but the opened text does not state a universal inspection-stage schedule.
    “Inspection powers. An authorized inspection official of the Village may at all reasonable hours enter upon any public or private premises for inspection purposes and may require the production of the permit for any building, plumbing, electrical or heating work.”
  • Certificate of occupancyLimited

    Buildings inside Brandon village limits where the ordinance conditions a certificate of occupancy on utility availability.

    • No person may occupy until sewer, water, grading, and graveling are installed in streets necessary to serve the property.
    • The opened ordinance text does not establish that every new building requires a certificate of occupancy.
    “No person shall occupy any building until sewer, water, grading and graveling are installed in the streets necessary to service the property, and a certificate of occupancy shall not be issued until such utilities are available to service the property.”
  • Local zoningPresent (with conditions)

    Land inside Brandon village limits.

    • Zoning districts and boundaries are controlled by the Village zoning map and ordinance.
    “For the purpose of this chapter, the Village of Brandon is hereby divided into the following 10 zoning districts:”
  • Zoning districtsPublished (with conditions)

    Land inside Brandon village limits.

    • District boundaries are established on the adopted Zoning Map, available in the Village Clerk's office.

    number of zoning districts: 10

    “For the purpose of this chapter, the Village of Brandon is hereby divided into the following 10 zoning districts:”
  • Manufactured homesAllowed (with conditions)

    Manufactured homes in the R-1 Single-Family Residential District inside Brandon village limits.

    • The home must be double-wide, at least 24 feet wide and 36 feet long.
    • It must meet the stated foundation, wheel-and-axle removal, siding, roof, design, and Wisconsin Uniform Dwelling Code requirements.

    minimum manufactured-home width: >= 24 feet · minimum manufactured-home length: >= 36 feet

    “Manufactured homes complying with all of the following requirements and limitations. The home shall: Be a double wide of at least 24 feet in width and 36 feet in length.”
  • Off-grid sanitationProhibited

    Privies, cesspools, and waterless toilets serving human habitation inside Brandon village limits after that building connects to a sewer main.

    • This prohibition applies after connection of the building to a sewer main.
    “After connection of any building used for human habitation to a sewer main, no privy, cesspool or waterless toilet shall be used in connection with such human habitation.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Buildings used for human habitation inside Brandon village limits when a Village sewer or water main becomes available.

    • The Village Board may defer connection for a property with an existing Village-permitted septic system or well, but no more than five years from main installation.
    • After written notice, failure to comply within 10 days permits the Building Inspector to cause the connection and assess the expense as a special tax.

    connection compliance period after notice: <= 10 days (Measured from service or mailing of the Building Inspector's notice.) · maximum connection deferment: <= 5 years (For properties with existing septic systems or wells whose construction was permitted by the Village.)

    “Whenever a sewer or water main becomes available to any building used for human habitation, the owner of the property upon which the building is located shall connect the building to such main or mains in the manner prescribed by law, except the Village Board may defer connection to such water or sewer main or mains for those properties which have existing septic systems or wells whose construction was permitted by the Village of Brandon, but such deferment shall not exceed five years from the date of installation of such main or mains.”
  • Subdividing landRegulated (with conditions)

    Subdivision development supporting a proposed building inside Brandon village limits.

    • A building permit cannot issue until the Village Board accepts the subdivision and required improvements.
    • The property must abut a street dedicated for street purposes.
    “No building permit shall be issued unless the property on which the building is proposed to be built abuts a street that has been dedicated for street purposes. No building permits shall be issued until the subdivision and required improvements are accepted by the Village Board.”
  • Driveway accessLimited

    Buildable lots inside Brandon village limits.

    • The lot must also meet the frontage requirements of the zoning district in which it is located.
    • This claim addresses approved access for lots, not a separate driveway-permit procedure.

    minimum lot frontage: >= 60 feet (To be buildable, the lot must comply with its zoning district frontage requirements.)

    “All lots shall abut upon a public street or other officially approved means of access, and each lot shall have a minimum frontage of 60 feet; however, to be buildable, the lot shall comply with the frontage requirements of the zoning district in which it is located.”
  • Permit processPublished (with conditions)

    Building-permit applications inside Brandon village limits.

    • Applications must be in writing on a Village Clerk form and contain the enumerated ownership, legal-description, designer, use, and other required information.
    • Structural-project applications are placed on the next Village Board agenda for a Board determination.
    “Application for a building permit shall be made, in writing, upon a form furnished by the Village Clerk and shall state the name and address of the owner of the land and also the owner of the building if different, the legal description of the land upon which the building is to be located, the name and address of the designer, the use to which said building is to be put and such other information as the Building Inspector or Clerk may require.”

Rules another office applies inside Village of Brandon

Village of Brandon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    Principal dwellings in Brandon's R-1 Single-Family Residential District.

    • This is the R-1 district standard; other districts have different requirements.

    minimum lot width: >= 90 feet · minimum lot area: >= 12000 square feet

    “Lot size. Minimum width: 90 feet. Minimum area: 12,000 square feet.”
  • SetbacksSpecified

    Principal dwellings in Brandon's R-1 Single-Family Residential District.

    • The minimum side yard is six feet where a lot is less than the required 90 feet wide.

    minimum street yard: >= 30 feet · minimum rear yard: >= 30 feet · minimum side yard: >= 15 feet (Six feet where lot is less than required 90 feet wide.) · minimum street-side yard: >= 15 feet

    “Minimum street yard: 30 feet. Minimum rear yard: 30 feet. Minimum side yard: 15 feet (six feet where lot is less than required 90 feet wide). Minimum street side yard: 15 feet.”
  • Lot coverageSpecified

    Principal dwellings in Brandon's R-1 Single-Family Residential District.

    • This limit covers the total of all buildings on the parcel.

    maximum lot coverage: <= 30 percent (Total of all buildings on parcel.)

    “Maximum lot coverage for total of all buildings on parcel: 30%.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Brandon or Fond du Lac County directly.

  • Owner-builder exemption — Owner construction inside Brandon village limits.
  • Living in an RV — Residential occupancy of recreational vehicles on private land inside Brandon village limits.
  • Camping on your land — Temporary camping on private land inside Brandon village limits.
  • Tiny homes — Tiny-home occupancy inside Brandon village limits.
  • Accessory dwellings — Accessory dwelling units inside Brandon village limits.
8 more unanswered
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Brandon publishes no rule on the point, not that none exists. Fond du Lac County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Village of Brandon means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Fond du Lac County: county rules, score and offices