Within Perkins County, South Dakota's mapped planning jurisdiction, the appropriate zoning permit is required before a land use begins or changes and before a structure is erected or moved1. A narrow exemption covers agricultural buildings that meet every district, acreage, setback and agricultural-use condition1. South Dakota supplies the minimum rules for on-site wastewater systems, while local rules may be stricter2.
Do you need a building permit in Perkins County, South Dakota?
Yes.
Yes. Within the Perkins County planning jurisdiction shown on the official zoning map, the appropriate zoning permit is required before a land use begins or changes and before a structure is erected or moved1. Building/Use Permit applications require newspaper notice and a 14-day public-comment period; conditional uses add Planning Commission review, notice to adjoining owners and County Commission consideration1. The Planning and Zoning Director may inspect a proposed site at a reasonable time after notifying the applicant1.
A fee is due with a zoning-permit, variance or ordinance-amendment application, but the amount is set by County Commission resolution rather than stated in the ordinance1. We could not confirm a separate Perkins County building-code adoption, general construction-inspection program or certificate-of-occupancy requirement. South Dakota's building-code framework identifies model codes, but local adoption and enforcement for a Perkins County project were not established7. Covered plumbing and electrical work can still require state permits and inspections8,9.
Who handles Perkins County permits, and how do you reach the office?
Perkins County's ordinance assigns zoning-permit applications to the Planning and Zoning Department, while the county Finance Office is the verified public contact for routing a caller to the current zoning official.
Perkins County's ordinance assigns zoning-permit applications to the Planning and Zoning Department, while the county Finance Office is the verified public contact for routing a caller to the current zoning official1,10. The Finance Office is at PO Box 126, Bison, SD 57620 and lists 605-244-5624 as its auditor phone10.
Request the appropriate county form and the list of materials for the permit type1. Ask for the current fee resolution because a fee is required but no amount appears in the ordinance1. Building/Use Permit applications have a 14-day public-comment period, while conditional-use applications require additional review and public notice1. A zoning permit expires if the authorized building or use does not begin within 365 days, although a written extension of up to 180 days may be available1. State plumbing, septic and electrical requirements remain separate from county zoning approval2,8,9.
Does Perkins County have zoning?
Yes.
Yes. The Perkins County ordinance governs land within the County Commissioners' planning jurisdiction shown on the official zoning map, and the commissioners administer and enforce it1. The ordinance establishes the General Agricultural District1. A primary structure in that district needs a lot of at least 39 acres1. The general district standards call for 25-foot setbacks and a 35-foot maximum structure height, with use-specific exceptions1.
A proposed agricultural building avoids a Building/Use Permit only if it is in the General Agricultural District, is on at least 39 acres or a parcel in a larger contiguous agricultural operation, stands at least 100 feet from every property line or public road, and serves an existing or clearly potential agricultural use1. We could not confirm a county minimum dwelling size, lot-coverage rule, accessory-dwelling rule or operative subdivision ordinance, so ask Planning and Zoning before fixing a house site.
How do septic permits work in Perkins County?
South Dakota sets minimum requirements for on-site wastewater systems, and local governments may impose stricter requirements.
South Dakota sets minimum requirements for on-site wastewater systems, and local governments may impose stricter requirements2. A conventional individual system may be designed and installed under the state chapter without submitting plans for advance state approval; other installations receiving human waste require state review and approval before construction, and installers must be certified by the South Dakota Plumbing Commission11. The state or its authorized representative may inspect an on-site system at any time, but the rule does not establish a universal pre-operation inspection11.
A septic system cannot be installed or operated where public wastewater is available, which requires the parcel to be within a municipality or sanitary district, a sewer collection system within 400 feet, and a request from that municipality or district to provide service11. The state septic program answers on-site wastewater questions at (605) 773-464712. Only 7.6% of mapped county soils are rated without severe limitations for a conventional drain field, so obtain a parcel-level site evaluation and confirm whether county rules add review before excavation13.
Can you live in an RV or tiny home on land in Perkins County?
Within Perkins County's mapped planning jurisdiction, a commercial RV park in the General Agricultural District requires a Conditional Use Permit, and an RV-park stay may last no more than 30 days.
Within Perkins County's mapped planning jurisdiction, a commercial RV park in the General Agricultural District requires a Conditional Use Permit, and an RV-park stay may last no more than 30 days1. That rule does not answer whether long-term RV occupancy is allowed on an ordinary private parcel outside an RV park, so ask Planning and Zoning for a written parcel-specific answer1.
A tiny home can use the single-dwelling framework if it qualifies as a dwelling unit with independent sleeping, cooking and sanitation facilities; a Building/Use Permit is required in the General Agricultural District1. If a proposed tiny-home use does not fit an ordinance definition or the applicable use table, the use is prohibited; a use variance is unavailable, but the owner may seek an ordinance amendment1. We could not confirm a minimum dwelling floor area or accessory-dwelling rule, so get the county's classification in writing before ordering a structure.
Building a home in Perkins County: what are the steps?
Give the Finance Office the parcel description and project concept, and ask for the current Planning and Zoning contact.
- Give the Finance Office the parcel description and project concept, and ask for the current Planning and Zoning contact10.
- Confirm that the parcel is within the mapped planning jurisdiction, then verify its zoning designation and allowed use; primary structures in the General Agricultural District require at least 39 acres1.
- Request the correct application and fee resolution, then submit the required materials early enough for public notice and review1.
- Obtain the zoning permit before beginning or changing the use or erecting or moving a structure; verify every condition before relying on the agricultural-building exemption1.
- Determine whether public wastewater is available before designing septic; if not, confirm whether the proposed system requires state plan approval11.
- Confirm water, plumbing and electrical requirements; an owner doing qualifying electrical work may avoid licensure but still needs the homeowner permit and inspections4,6,8.
- An owner building solely for personal use without intending to sell or lease may avoid a contractor's excise-tax license for the owner's own work, while hired contractors still owe the tax on their receipts5.
- If the driveway enters a state highway, obtain state permission before access construction14.
What should you check before buying land in Perkins County?
Begin with legal buildability, wastewater, water and access.
Begin with legal buildability, wastewater, water and access. Perkins County has about 1 person per square mile, and the nearest city of 100,000 or more is about 281 miles from the county center13. That remoteness makes contractor availability, hauling distance and emergency planning practical parts of a building budget.
For wastewater, only 7.6% of mapped soils avoid a severe conventional-drain-field limitation, so obtain a parcel-level site evaluation before committing to a house location13. For water, confirm likely well conditions and whether the intended use needs a water-right permit before drilling6. If access is from a state highway, construction cannot start until the state access permit is issued14. Ask the county whether the parcel lies in a regulated floodplain because participating South Dakota communities require permits for floodplain development15. Finally, treat the county's 1.3% effective property-tax rate and $1,405 median annual bill as context, then obtain the parcel's assessment and actual tax history13.
Watch-outs
- Within Perkins County's mapped planning jurisdiction, a zoning permit is required before beginning or changing a land use and before erecting or moving a structure, except for an agricultural building that meets every condition of the narrow exemption1.
- A primary structure in the General Agricultural District requires at least 39 acres, with general setbacks of 25 feet and a maximum height of 35 feet subject to exceptions1.
- County zoning fees are required but set by County Commission resolution, so request the current amount before filing1.
- Where public wastewater meets the state availability test, an on-site wastewater system cannot be installed or operated11.
- A Perkins County RV park requires conditional-use approval in the General Agricultural District and caps a stay at 30 days, but long-term RV residence on an ordinary private parcel remains unconfirmed1.
- An owner-builder electrical exemption is only an exemption from licensure; a qualifying owner still needs a homeowner permit and inspections4.
Sources
15 official pages, each quoted and re-checked · written October 9, 2026
- Perkins County Zoning Ordinance 2024-01
- One-Stop Permitting and Regulation Guide (2025 Edition)
- Rule 74:53 Water Supply and Treatment Systems
- South Dakota Electrical Commission - Homeowner Wiring
- Self-Contractors
- South Dakota Dictionary of Water Right Laws and Rules Summary
- BOTP Workgroup Summary Report
- South Dakota Plumbing Commission - Inspections (South Dakota statewide rule)
- South Dakota Electrical Wiring Rules Bulletin (South Dakota statewide rule)
- Perkins County Finance Office (perkinscounty.org)
- ARSD Chapter 74:53:01, Individual and Small On-Site Wastewater Systems
- South Dakota Department of Agriculture and Natural Resources (danr.sd.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Instructions: Applying for permission for driveway or intersection on a South Dakota state highway (South Dakota statewide rule)
- National Flood Insurance Program (South Dakota statewide rule)
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Perkins County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.