Bolthole Index

Centre County, Pennsylvania

Building permits, zoning and septic in Patton Township, Pennsylvania

Patton Township, Pennsylvania requires a building permit for residential work covered by the Uniform Construction Code, with building permit review and inspections handled by Centre Region Code Administration.12 Patton Township handles zoning approval separately.3 In Centre County, on-lot septic permits come from the responsible local sewage agency; ask the township to identify the Sewage Enforcement Officer for your parcel.45

At a glance

Building permits
Required for UCC-regulated residential construction; regional code office handles review and inspections12
Zoning
Township zoning applies; township department administers zoning approval63
Septic permits
Local sewage agency approval required for covered on-lot systems5
Occupancy
UCC-regulated homes need a certificate of occupancy before use7
Owner-builder
State has no general contractor license requirement for most contractors; construction approvals still apply81
Farm buildings
Qualifying agricultural buildings have a UCC exemption; habitable space is excluded9

Who to call

Zoning

Patton Township Engineering, Planning & Zoning Department

Township zoning approval, land-development review and zoning application forms; ask for the local Sewage Enforcement Officer referral.

814-234-0271

[email protected]

100 Patton Plaza State College, PA 16803

Building permits

Centre Region Code Administration

Building construction review, building permit issuance and inspections serving Patton Township.

814.231.3056

2643 Gateway Drive, Suite #1 State College, PA 16801

Septic permits

Centre Region Code Administration — Sewage Management

Regional on-lot sewage maintenance and inspection program; confirm new-system permitting assignments with township staff.

Contact details are copied from each office’s official page and were checked against it on October 15, 2026.

Off-grid gear

Going off-grid in Patton Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Patton Township, PA?

Patton Township home construction covered by Pennsylvania’s Uniform Construction Code requires a building permit before work begins; the residential rule also covers regulated alterations, additions, demolition and changes of occupancy, subject to its exemptions.1 Patton Township’s code includes a uniform construction codes chapter.10

An owner doing the work personally should still plan for building approval: Pennsylvania’s lack of a general statewide contractor license requirement does not remove the residential building permit requirement.81 A qualifying agricultural building may be exempt from the UCC, but the exemption excludes habitable space, so it does not cover a home merely because the parcel is farmed.9

Who issues building permits and zoning approval in Patton Township?

Centre Region Code Administration serves Patton Township and handles building construction review, building permit issuance and inspections; call 814.231.3056 for the building-code side of a project.2 Patton Township’s Engineering, Planning & Zoning Department administers zoning approval and provides the Application for Zoning and Building Permit.3

Start a parcel-specific zoning inquiry with the township at 814-234-0271, then coordinate the building application with the regional code office.32 Ask each office for the current application materials and applicable fees before submitting. Township zoning inspections require 24–48 hours notice when scheduling.3

Does Patton Township have zoning, and can you live in an RV or tiny home?

Patton Township has its own zoning chapter, and the township department administers zoning approval.63 The township department also provides a zoning map and reviews land-development plans.3 Ask township zoning staff to identify the parcel’s district and confirm the proposed dwelling use, lot size, setbacks and any subdivision approval before choosing a building location.311

We could not confirm Patton Township’s rules for residential RV occupancy, temporary camping, tiny homes, manufactured homes or accessory dwellings; take the exact proposal to the township zoning office.3 For a tiny home subject to the residential UCC, building approval and a certificate of occupancy remain part of the construction process.17

How do septic permits work inside Patton Township?

On-lot septic systems covered by the sewage permitting rules in Centre County need approval from the responsible local agency, with Pennsylvania DEP providing oversight.54 Ask Patton Township to identify the Sewage Enforcement Officer for a proposed installation and explain the parcel’s public-sewer or on-lot sewage path before committing to a house layout.34

For an existing septic system, Centre Region Code Administration operates the regional sewage management program and asks owners to call before pumping.12 Centre County’s soil data rates only 16.1% of soils “not limited” for conventional drain fields; that countywide figure supports getting a site evaluation, not assuming a particular Patton Township lot cannot support septic.13

What are the steps to building a home in Patton Township?

  1. Ask Patton Township zoning staff to review the proposed use and location using the township zoning map and application materials.3
  2. Resolve on-lot sewage approval with the responsible local agency if the project uses a septic system.5
  3. Obtain the required residential building permit through Centre Region Code Administration before covered construction begins.12
  4. Notify the construction code official when permitted work is ready for inspection and keep the work accessible.14
  5. Complete final inspection and obtain the residential certificate of occupancy before using the home.147

What should you check before buying land in Patton Township?

Ask township zoning staff about the parcel’s proposed use and any land-development review before treating a listing as buildable.311 We could not confirm Patton Township’s well-permit requirements, mandatory utility-connection rules or local driveway approval process; ask the township to identify the applicable offices for the address.3 A driveway built or changed on Pennsylvania state highway land needs PennDOT approval under the state highway occupancy rules.15

For land outside Patton Township, use the Centre County guide to orient your municipal zoning inquiry, because Centre County has no countywide zoning ordinance and municipal rules vary.16 Keep the regional soil limitations in mind when evaluating an on-lot sewage proposal.13

Watch-outs

  • We could not confirm residential RV or tiny-home permission in Patton Township; obtain a parcel-specific answer from township zoning staff before planning to live on-site during construction.3
  • A UCC-regulated residential building cannot be occupied without a certificate of occupancy from the building code official.7
  • Patton Township zoning inspections need 24–48 hours notice when scheduling.3

Sources

  1. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  2. Centre Region Code Administration (crcog.net)
  3. Patton Township Engineering, Planning & Zoning Department (twp.patton.pa.us)
  4. Municipal On-Lot Sewage Service Areas, quoted and re-checked
  5. Municipal On-Lot Sewage Service Areas, quoted and re-checked
  6. Township of Patton, PA - eCode360 table of contents (Patton Township), quoted and re-checked
  7. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  8. Contractor Licensing (Pennsylvania statewide rule), quoted and re-checked
  9. Pennsylvania Construction Code Act — Chapter 1 (Pennsylvania statewide rule), quoted and re-checked
  10. Township of Patton, PA - eCode360 table of contents (Patton Township), quoted and re-checked
  11. Township of Patton, PA - eCode360 table of contents (Patton Township), quoted and re-checked
  12. Centre Region Code Administration — Sewage Management (crcog.net)
  13. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  14. Part XIV, Uniform Construction Code, Chapter 403 Administration (Pennsylvania statewide rule), quoted and re-checked
  15. Apply for a PennDOT Highway Occupancy Permit (Pennsylvania statewide rule), quoted and re-checked
  16. Centre County Housing, quoted and re-checked

Written October 15, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Patton Township

Patton Township’s own rules

  • Building code adoptedAdopted (with conditions)

    Construction codes inside Patton township

    • Based on the chapter title only; ordinance text and administering agency not verified.
    “chapter 170 construction codes, uniform (§ 170-1 – § 170-6)”
  • Local zoningPresent

    Land inside Patton township

    • Only the chapter title and section range were verified from the code table of contents; the chapter text was not retrievable.
    “chapter 400 vehicles and traffic (§ 400-1 – § 400-45) chapter 425 zoning (§ 425-1 – § 425-87)”
  • Subdividing landRegulated (with conditions)

    Subdivision and land development inside Patton township

    • Based on the chapter title only; thresholds not verified.
    “chapter 350 subdivision and land development (§ 350-1 – § 350-61)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Patton Township or Centre County directly.

  • Building permit — Building permits inside Patton township
  • Owner-builder exemption — Owner-builder exemption inside Patton township
  • Inspections — Building inspections inside Patton township
  • Certificate of occupancy — Certificate of occupancy inside Patton township
  • Zoning districts — Zoning districts inside Patton township
22 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Patton Township publishes no rule on the point, not that none exists. Centre County’s page lists the county offices to call.

← All of Centre County: county rules, score and offices