Bolthole Index

Yates County, New York

Building permits, zoning and septic rules in Yates County, New York

67Index Score / 100
#10 of 62 in New York

Yates County, New York requires building permits for work covered by the state Uniform Code, but the town or village where the parcel lies administers the permit rather than a countywide building department1. Yates County does not administer zoning; towns and villages make local land-use decisions2. The New York State Department of Health's Geneva District Office is the county's lead environmental-health agency3.

At a glance

Building permit
Required for work covered by the state codes; apply through the parcel's town or village14
Building department
No single countywide permit office; the applicable town or village administers permits1
Zoning
No county zoning; rules vary by town, village and zoning district2
Septic
Ask the New York State Department of Health's Geneva District Office about parcel-specific approval35
RV or tiny home
Countywide occupancy rules were not confirmed; ask the town or village code officer2
Owner-builder
No Yates County owner-builder exemption was confirmed6
Conventional septic soils
Only 12.3% of soils are rated without severe limitations7

Who to call

Planning & zoning

Yates County Planning Department

County Planning Board referrals and questions; municipalities retain final action

(315) 536-5153

Septic permits

New York State Department of Health, Geneva District Office

Environmental health services for Yates County; contact this office to confirm onsite wastewater requirements

(315) 789-3030

[email protected]

624 Pre Emption Road, Geneva 14456-1334

Contact details are copied from each office’s official page and were checked against it on September 27, 2026.

Do you need a building permit in Yates County, New York?

Yes. Work in Yates County that must conform to the New York State Uniform Code or Energy Code requires a building permit, administered by the town or village with jurisdiction over the parcel14. A local program may exclude a one-story detached tool shed, storage shed, playhouse or similar residential accessory structure when its gross floor area does not exceed 144 square feet, but a local authority may still choose to require a permit4. Even excluded work must comply with the applicable state codes4. The updated state Uniform Code took effect on December 31, 20258. Before ordering plans or materials, ask the applicable town or village code enforcement office which application, construction documents and local fees apply to the project9.

Who handles Yates County building permits, and how do you reach them?

Yates County does not provide one permit counter for private construction across the county; the applicable town or village administers the state-code permit program1. The county Planning Board instead reviews qualifying referrals from towns and villages, makes recommendations, and returns findings to those municipalities for final action10. Call the Yates County Planning Department at (315) 536-5153 when you need help understanding the county-review role, but contact the parcel's town or village code enforcement officer for the actual building-permit application101. Permit applications must give the work location and scope, the tax-map number and street address, the proposed occupancy classification, applicable special-inspection information and acceptable construction documents9. Local permit fees were not confirmed, so ask the municipal code office for its current fee schedule before filing.

Does Yates County have zoning?

Yates County does not administer a county zoning ordinance; towns and villages set the zoning that controls individual parcels2. The Yates County Planning Board reviews municipal referrals with countywide or intermunicipal effects, but the referring municipality takes final action10. That division matters because setbacks, lot size, coverage and allowed uses can change at a town or village boundary2. In the Town of Starkey, for example, the A-1 district has a 44,000-square-foot minimum lot area, while the R-1 district has a 30,000-square-foot minimum lot area11. Starkey's A-1 district also sets minimum front, side and rear yards of 50, 25 and 50 feet12. Those Starkey figures do not apply elsewhere in Yates County1112. Ask the relevant municipal office for the parcel's zoning district, zoning map and current dimensional schedule before treating any listing as buildable.

How do septic permits work in Yates County?

The New York State Department of Health's Geneva District Office is the lead environmental-health agency serving Yates County3. The state directory lists the Geneva office at 624 Pre Emption Road, Geneva 14456-1334, by phone at (315) 789-3030 and by email at [email protected]5. We could not confirm a Yates-specific residential septic permit or inspection procedure, so ask that office what design review, site testing, construction approval and inspection apply before installing a system. Statewide, an ordinary sewage discharge to groundwater below 1,000 gallons per day does not require a SPDES permit, but approval from the applicable health authority may still be required before construction13. Site conditions deserve early attention because only 12.3% of Yates County soils are rated without severe limitations for a conventional septic drain field7. Arrange the site evaluation before fixing the house location or finalizing a purchase contingency.

Can you live in an RV or tiny home on your land in Yates County?

We could not confirm one countywide rule allowing long-term RV living, temporary camping or tiny-home occupancy in Yates County. Because towns and villages control zoning, the answer depends on the parcel's municipality and zoning district2. A tiny home used as a dwelling also remains subject to the state building-permit framework when its construction must conform to the Uniform Code or Energy Code4. Do not treat the possible permit exclusion for a small detached shed as permission to occupy that structure as a home; the cited exclusion applies to tool sheds, storage sheds, playhouses and similar accessory uses4. Before buying an RV or designing a compact dwelling, ask the town or village code officer about dwelling definitions, camping duration, utility connections, setbacks, minimum dwelling size and whether occupancy is allowed during construction.

Building a home in Yates County: the steps, in order

  1. Identify the town or village containing the parcel because that municipality administers building permits and local zoning12.
  1. Ask its code enforcement office for the zoning district, allowed use, dimensional rules, application, fee schedule and required plans29.
  1. If the site needs onsite wastewater, contact the Geneva District Office and confirm the required design, review and inspection path35.
  1. Submit the building-permit application with the location, scope, tax-map information, occupancy classification and construction documents required by the authority9.
  1. Keep permitted work accessible for the required construction inspections and notify the authority when each stage is ready14.
  1. Obtain a certificate of occupancy or compliance before occupying permitted work; the authority must inspect and determine compliance first15.

What should you check before buying land in Yates County?

Start with jurisdiction: confirm the town or village, zoning district, permitted use, setbacks and whether subdivision approval is needed216. Test septic feasibility early because only 12.3% of Yates County soils are rated without severe limitations for a conventional drain field7. The terrain is comparatively manageable overall, with 84.7% of county land at a slope of 15% or less, but parcel-level conditions still control the build site17. Confirm legal road access, flood-hazard information and the water source before closing; the state permit process may require flood-hazard information where applicable18. Budget for carrying costs as well: the effective property-tax rate is about 1.9%, and the median annual property-tax bill is about $3,4171920. The nearest city of 100,000 or more is about 46 miles from the county center21.

Watch-outs

  • Yates County's lack of county zoning does not mean a parcel is unrestricted; the applicable town or village may impose its own use, lot, setback and occupancy rules2.
  • Only 12.3% of Yates County soils are rated without severe limitations for a conventional septic drain field, so settle septic feasibility before committing to a house site7.
  • We could not confirm countywide rules for RV living, tiny-home occupancy, private-well permits or driveway approval; ask the town or village code officer and the Geneva District Office before relying on a seller's description23.

Sources

  1. NY Department of State - Local Government Enforcement Programs (2026 county census)
  2. Yates County Planning & Development (2026 county census)
  3. Yates County Environmental Health (2026 county census)
  4. Administration and Enforcement of the Uniform Code, quoted and re-checked
  5. New York State Department of Health, Geneva District Office (health.ny.gov)
  6. (2026 county census)
  7. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  8. Notice of Adoption, quoted and re-checked
  9. Administration and Enforcement of the Uniform Code, quoted and re-checked
  10. Yates County Planning Department (yatescountyny.gov)
  11. Town of Starkey Local Law 2021-57, quoted and re-checked
  12. Town of Starkey Local Law 2021-57, quoted and re-checked
  13. State Pollutant Discharge Elimination System (SPDES) Permit Program (New York statewide rule), quoted and re-checked
  14. Part 1203 Uniform Code and the Energy Code: Minimum Standards for Administration and Enforcement (New York statewide rule), quoted and re-checked
  15. Administration and Enforcement of the Uniform Code, quoted and re-checked
  16. New York Town Law § 276: Subdivision review; approval of plats; development of filed plats (New York statewide rule), quoted and re-checked
  17. Share of land at 15% slope or less: Bolthole Index county data
  18. Administration and Enforcement of the Uniform Code (New York statewide rule), quoted and re-checked
  19. Effective property tax rate: Bolthole Index county data
  20. Median property tax bill: Bolthole Index county data
  21. Distance to the nearest metro area: Bolthole Index county data

Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Yates County in New York

67
County map
Yates County highlighted among the New York counties · colored by Index score

How Yates County scores

Seclusion47100% ev.
Self-Sufficiency72100% ev.
Admin Boringness5890% ev.
Durability80100% ev.
Property Autonomy33100% ev.
Carry Cost59100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$327kTypical home
1.9%Property tax
$6,402Land / acre
34.6"Annual rain
2.5% of yrsSevere drought
1.2 / yr (+1.1)Mid-century 100°F days
9.3 daysMid-century dry spell
1.46" (+8.9%)Mid-century 1-day rain
1.61×Wildfire change factor
100%Forward climate coverage
$1,086Home insurance / yr
2.9% / yrInsurance growth
0.23%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
35,562People within 30 min
2,767,942People within 2 hr
42,976Radius comparison (15 mi)
72.4People / sq mi
0.2%Federal land
84.7%Land at 15% slope or less
12.3%Septic soil without severe limits
23,925 acWorkable land screen
45.6%Wooded land
53.1 tonsBiomass / forest ac
47.5°FAvg temp

Scout Yates County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Yates County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Yates County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Yates County rules

  • Minimum lot sizeSpecified

    Town of Starkey A-1, R-1, and R-2 zoning districts.

    • Requirements differ by zoning district and dwelling type.
    • In A-1, the minimum lot area and minimum lot area per dwelling unit are 44,000 square feet.
    • In R-1, both are 30,000 square feet.
    • In R-2, minimum lot area is 10,000 square feet for detached single-family, 15,000 square feet for two-family, and 18,000 square feet for multi-family; minimum lot area per dwelling is separately specified.

    A-1 minimum lot area: 44000 square feet · R-1 minimum lot area: 30000 square feet · R-2 detached single-family minimum lot area: 10000 square feet

    “Minimum Lot Area Detached single Family 10000 Sq. Ft. Two Family 15000 Sq. Ft. Multi-family 18000 Sq. Ft.”
  • SetbacksSpecified

    Town of Starkey A-1 and R-1 zoning districts.

    • A-1 minimum front, side, and rear yards are 50, 25, and 50 feet.
    • R-1 minimum front, side, and rear yards are 35, 15, and 30 feet.
    • Front-lot-line measurement is subject to the cited road-right-of-way and centerline rule.

    A-1 minimum front yard: 50 feet (front lot line established at one-half of the road legal right of way but not less than 25 feet from road centerline) · A-1 minimum side yard: 25 feet · A-1 minimum rear yard: 50 feet

    “Minimum Front Yard (See 1 below) 50 Ft. Minimum Side Yard 25 Ft. Minimum Rear Yard 50 Ft.”
  • Lot coverageSpecified

    Town of Starkey A-1 and R-1 zoning districts.

    • A-1 maximum building coverage is 10% and maximum total coverage is 20%.
    • R-1 maximum building coverage is 20% and maximum total coverage is 30%.
    • Total lot coverage includes buildings and other impervious surfaces.

    A-1 maximum building coverage: 10 percent · A-1 maximum total lot coverage: 20 percent (includes buildings and other impervious surfaces)

    “Maximum Lot Coverage, Building 10% Maximum Total Lot Coverage 20%”
  • County-wide zoningAbsent

    The county does not zone; the Yates County Planning Department only reviews municipal referrals and consults with towns/villages, which set their own zoning.

    Yates County Planning & Development ↗Scouted from the county site, not yet independently re-checked

New York rules that apply here

  • Building permitRequired

    Work that must conform to the New York State Uniform Code or Energy Code throughout New York State except New York City, where the city has its own construction code; local authorities having jurisdiction administer and enforce the state requirements within their boundaries.

    • A local authority having jurisdiction may expressly exempt one or more listed categories of work from the building-permit requirement.
    • Permitted exemption categories include one-story detached tool or storage sheds, playhouses, or similar structures associated with one- or two-family dwellings or townhouses not exceeding 144 square feet gross floor area; temporary sets and scenery; certain window awnings; partitions or movable cases less than 5 feet 9 inches high; painting, wallpapering, tiling, carpeting, or similar finish work; listed portable equipment or appliances; certain equipment replacements; and repairs that do not affect fire and life safety.
    • A permit exemption does not authorize work violating the Uniform Code or Energy Code.
    • Beginning December 31, 2025, regulated parties submitting building permit applications must comply with the 2025 NYS Uniform Code, subject to the stated transition option before that date.

    maximum gross floor area for listed detached accessory structures: <= 144 square feet (Only for one-story detached structures associated with one- or two-family dwellings or townhouses and used for tool/storage sheds, playhouses, or similar uses.) · height threshold for listed partitions or movable cases: < 5 feet 9 inches

    “Each authority having jurisdiction shall include in its code enforcement program provisions requiring building permits to be required for work that must conform to either or both of the Codes.”
    One more reviewed finding on this topic
    • Required — Work that must conform to the New York State Uniform Code or Energy Code in Yates County.
      “An authority having jurisdiction’s code enforcement program must require any party who proposes to perform any work which must conform with the Uniform Code or Energy Code to obtain a building permit.”
  • Building code adoptedAdopted (with conditions)

    Building construction and related work in Yates County subject to New York State's Uniform Code.

    • The 2025 NYS Uniform Code became effective December 31, 2025.
    • During the transition period before that effective date, a person could comply with either the 2025 or 2020 Uniform Code.
    “The rule adopted by the Code Council on July 25, 2025 repealed the 2020 edition of the Uniform Code and adopted an amended and updated edition of the Uniform Code.”
  • InspectionsRequired

    Construction work for which a building permit has been issued and which is subject to the Uniform Code or Energy Code, administered by the applicable local authority having jurisdiction throughout New York State except New York City.

    • Inspections may be performed in person or remotely when the authority determines the remote inspection can be performed to the same level and quality and provides sufficient information; otherwise an in-person inspection is required.
    • Where applicable, inspections include the worksite before permit issuance, footing and foundation, concrete slab preparation, framing, structural/electrical/plumbing/mechanical/fire-protection systems, fire-resistant construction and penetrations, heating appliances/chimneys/flues/gas vents, Energy Code compliance elements, manufactured buildings or homes, and a final inspection.
    • Permit work must remain accessible and exposed until inspected and accepted; the permit holder must notify the authority when work is ready for inspection.
    • The state minimum standards do not require regular periodic inspections of owner-occupied one- and two-family dwellings or agricultural buildings used directly and solely for agricultural purposes, but this does not limit inspections invited by the owner or required where conditions threaten or present a public-health, safety, or welfare hazard.

    maximum interval for periodic fire-safety and property-maintenance inspections of multiple dwellings and nonresidential occupancies: <= 3 years (This periodic-inspection interval does not apply as a requirement to owner-occupied one- and two-family dwellings or qualifying agricultural buildings.)

    “Each authority having jurisdiction shall include in its code enforcement program provisions requiring the authority having jurisdiction, or an individual or entity contracted by the authority having jurisdiction and satisfying the requirements set forth in section 1203.2 (e)(2), to perform construction inspections required by the Codes including those listed in this paragraph, either in-person or remotely.”
  • Certificate of occupancyRequired

    Work subject to a building permit and the Uniform Code or Energy Code, and structures or portions converted from one use or occupancy classification or subclassification to another, throughout New York State except New York City.

    • Permission to use or occupy covered buildings or portions is granted only by issuance of a certificate of occupancy or certificate of compliance, except as provided for temporary certificates of occupancy.
    • Before issuance, the authority must inspect and determine compliance with applicable Codes and, where applicable, review structural-observation statements, special-inspection reports, flood-hazard certifications, Energy Code test results, and manufactured-building or manufactured-home seals, insignias, and data plates.
    • A temporary certificate may be issued before completion for a specified period and specified portions, subject to safe occupancy, operational fire and life-safety components, required means of egress, and completion of remaining work.

    temporary certificate period: specified period (The permit holder must undertake to bring the structure into full compliance with the Codes.)

    “The code enforcement program shall provide that, except as provided in section 1203.3 (d)(4), permission to use or occupy a building or structure, or portion thereof, for which a building permit was previously issued, or which has been converted from one use or occupancy classification or subclassification to another, shall be granted only by issuance of a certificate of occupancy or a certificate of compliance.”
    One more reviewed finding on this topic
    • Required — All work subject to a building permit and conversions between occupancy classifications in Yates County.
      “An authority having jurisdiction’s code enforcement program must provide for the issuance of a certificate of occupancy or certificate of compliance for: • all work which is the subject of a building permit; and • all structures, buildings, or portions thereof, which are converted from one use or occupancy classification or sub-classification to another.”
  • Who permits septicMixed (with conditions)

    Residential and other septic or cesspool systems statewide in New York.

    • New York State DEC administers SPDES permitting for regulated wastewater discharges.
    • For systems with less than 1,000 gallons per day of sewage-wastewater discharge to groundwater and no industrial or other non-sewage wastes, approval may still be required from the appropriate city health department, county health department, or district office of the New York State Department of Health before construction.
    • The actual local or district health authority depends on the property location.

    groundwater discharge design flow threshold: < 1000 gallons per day (No industrial or other non-sewage wastes)

    “city health department, county health department”
  • Septic permitLimited

    Facilities discharging sewage-wastewater to groundwater through septic systems or similar systems statewide.

    • A SPDES permit is not required when total groundwater discharge design flow is less than 1,000 gallons per day and the wastewater contains no industrial or other non-sewage wastes.
    • The exemption does not eliminate possible approval requirements from the appropriate city health department, county health department, or district office of the New York State Department of Health before construction.
    • Other DEC permits or approvals from other agencies may also be required.

    groundwater discharge design flow: < 1000 gallons per day (Sewage-wastewater containing no industrial or other non-sewage wastes)

    “No SPDES permit is required [...] less than 1,000 gallons per day [...] no industrial or other non-sewage wastes”
  • Subdividing landRegulated (with conditions)

    Subdivision review in towns, for the portion of a town outside incorporated villages, where the town board authorizes the planning board to review plats.

    • Authorization is by town-board resolution; the statute does not establish one uniform approval process for every municipality.
    • The statute defines subdivision by reference to local ordinances, laws, rules, or regulations.
    • Preliminary and final plat review is subject to SEQRA coordination and statutory hearing and decision procedures.
    • A conditional final-plat approval does not qualify the plat for recording or authorize building permits until required signing and recording occur.

    preliminary-plat hearing deadline when no environmental impact statement is required: 62 days (after receipt of a complete preliminary plat) · preliminary-plat decision deadline when no environmental impact statement is required: 62 days (after close of the public hearing) · final-plat filing deadline: 62 days (from final approval, otherwise approval expires)

    “For the purpose of providing for the future growth and development of the town and affording adequate facilities for the housing, transportation, distribution, comfort, convenience, safety, health and welfare of its population, the town board may, by resolution, authorize and empower the planning board to approve preliminary and final plats of subdivisions showing lots, blocks or sites, with or without streets or highways, within that part of the town outside the limits of any incorporated village.”
  • Permit feesVariable (with conditions)

    New York State Department of State building-permit administration and enforcement fees.

    • The schedule is identified as having a publication date of August 2022.
    • Fees vary by project type, building type, area, dwelling unit, sleeping room, inspection, and permit category.
    • For one- and two-family homes including accessory structures constructed contemporaneously, the schedule lists $200 for the first 1,500 square feet and $100 for each additional 1,000 square feet or fraction thereof.
    • Permit renewals have no fee.
    • Building-permit fees include construction inspections required as a result of the permit; additional inspection fees may apply.
    • Local authorities may have separate fees or requirements.

    publication date: August 2022 · one- and two-family homes fee for first 1,500 square feet: 200 USD (including accessory structures constructed contemporaneously) · one- and two-family homes fee for each additional 1,000 square feet or fraction: per 100 USD (after the first 1,500 square feet) · permit renewal fee: 0 USD

    “$ 200 First 1,500 square feet of area $ 100 Each additional 1,000 square feet of area or fraction thereof”
  • Permit processPublished (with conditions)

    Building-permit applications for work subject to the New York State Uniform Code or Energy Code, administered through the authority having jurisdiction’s code-enforcement program.

    • A building permit is required for work that must conform to the Uniform Code or Energy Code.
    • The code-enforcement program may exclude listed categories, including qualifying detached structures not exceeding 144 square feet, temporary sets and scenery, certain awnings, partitions or movable cases under 5 feet 9 inches, finish work, listed portable equipment, qualifying equipment replacements, and repairs that do not affect fire and life safety.
    • Excluded work must still conform to applicable Uniform Code and Energy Code provisions.
    • An authority having jurisdiction may instead require permits for all work subject to the Uniform Code and Energy Code.
    • Applications must include, at minimum, the work location, nature, extent and scope; tax map number and street address; occupancy classification; applicable special-inspection statement; and acceptable construction documents.
    • Construction documents may need site plans, code-compliance information, structural and building-system information, Energy Code compliance, flood-hazard information, and licensed architect or professional-engineer documentation where applicable.

    detached accessory structure exemption threshold: <= 144 square feet (one-story detached structures associated with one- or two-family dwellings or multiple single-family dwellings used for tool/storage sheds, playhouses, or similar uses) · movable partition or case exemption height: < 5 feet 9 inches

    “An authority having jurisdiction’s code enforcement program must require any party who proposes to perform any work which must conform with the Uniform Code”
    One more reviewed finding on this topic
    • Published (with conditions) — Building permit application and review process used by authorities having jurisdiction in Yates County.
      “An authority having jurisdiction’s code enforcement program must provide for an application process that requests sufficient information to enable the code enforcement official to determine that the intended work meets the requirements of the Uniform Code and Energy Code.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-builder exemption from building-code permitting or enforcement in Yates County.
  • Minimum dwelling size — Minimum dwelling size in Yates County.
  • Living in an RV — Long-term or residential RV occupancy in Yates County.
  • Camping on your land — Temporary camping on private land in Yates County.
  • Tiny homes — Tiny-home occupancy in Yates County.
8 more unanswered
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Yates County, New York

Is Yates County a good place to live off-grid or homestead?

Yates County scores 67/100 on the Bolthole Index, a strong county profile. Its strengths: a durable current and mid-century hazard profile and workable self-sufficiency basics: 34.6″/yr rainfall and 45.6% wooded land. Watch-outs: a weaker property-autonomy legal backdrop.

Do you need a building permit in Yates County, New York?

Yates County generally requires a residential building permit, and it has no county-wide zoning. Onsite septic is permitted by New York State Department of Health, Geneva District Office. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Yates County, New York?

Land in Yates County runs about $6,402 per acre, based on the latest county data.

What is the water situation in Yates County?

Yates County gets about 34.6" of rain a year, with severe drought in roughly 2.5% of years.

How remote is Yates County?

A representative private-land location has about 35,562 people within a 30-minute drive and 2,767,942 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Yates County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Yates compares in New York

Compare side-by-side →See all 62 New York counties ranked →