Yates County, New York
Village of Rushville is a village in Yates County, New York. Village of Rushville adopts its own zoning, so inside its limits Village of Rushville’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Yates County page.
New construction, structural alteration, demolition or change of use inside Rushville village
“prior to any new construction, structural alteration, demolition or changes in the use of a building or lot, or demolition of a structure, a building permit or zoning permit must be obtained from the code enforcement officer.”
Inside Rushville village; village CEO enforces NYS Uniform Fire Prevention and Building Code
“the official designated by the village board of the village of rushville to enforce the provision of the local law, the new york state uniform fire prevention, building code in the village and watershed regulation.”
Work under a village building permit inside Rushville village
“at the time the applicant has completed the construction, alteration, demolition, or changed the use as is permitted in the permit, the code enforcement officer shall inspect the premises to determine if the requirements of the law and permit have been adhered to.”
Erected or altered buildings and changes of use inside Rushville village
“no land is to be used or occupied, and no building or structure which has been erected or altered is to be used or changed in use, in whole or in part, until a certificate of occupancy has been issued by the ceo”
Land inside Rushville village
“the village board of rushville, ontario/yates county, new york, acting under authority of the village law of the state of new york, hereby adopts and enacts this law to be known and may be cited as "local law #2 of 2011, zoning law of the village of rushville."”
Inside Rushville village: R-1, C-1, C-2, M-D and community service districts
“7.0 residential district (r-1) a. permitted principal uses b. permitted accessory uses and structures c. dimensional requirements”
Residential district R-1, dwelling unit, inside Rushville village
minimum living space per dwelling unit: >= 900 sq ft
“the dimensional requirements for this district are specified in the zoning schedule, which is part of the local law. the minimum living space for a dwelling unit shall be 900 square feet.”
Residential district R-1, single family principal structure, inside Rushville village
minimum lot area: >= 20000 sq ft · minimum lot width: >= 100 ft · minimum lot depth: >= 150 ft
“minimum lot area lot size min width lot depth setbacks front rear side maximum bldg ht maximum lot coverage 20,000 sq ft 100' 150' 35' 30' 15' 35' 30%”
Residential district R-1, single family principal structure, inside Rushville village
front setback: >= 35 ft · rear setback: >= 30 ft · side setback: >= 15 ft
“minimum lot area lot size min width lot depth setbacks front rear side maximum bldg ht maximum lot coverage 20,000 sq ft 100' 150' 35' 30' 15' 35' 30%”
Residential district R-1, single family principal structure, inside Rushville village
maximum lot coverage: <= 30 percent
“maximum bldg ht maximum lot coverage 20,000 sq ft 100' 150' 35' 30' 15' 35' 30%”
Residential district R-1, single family principal structure, inside Rushville village
maximum building height: <= 35 ft
“maximum bldg ht maximum lot coverage 20,000 sq ft 100' 150' 35' 30' 15' 35' 30%”
Manufactured housing units inside Rushville village (Article X)
“prior to the location of a manufactured housing unit within the village of rushville, a building permit shall be obtained from the village code enforcement officer.”
Tourist homes/bed and breakfast in R-1 inside Rushville village
“the following uses may be permitted: provided that a special use permit is approved by the planning board, and issued by the ceo: e. 1. single-family conversions to a two family dwelling. 2. public and semi-public uses and buildings. 3. tourist homes/bed and breakfast uses.”
Zoning and building permit fees inside Rushville village
“fees shall be established from time to time by resolution of the village board of trustees, which upon adoption shall be filed with the village clerk.”
Permits inside Rushville village
“a building permit for a permitted use or structure, may be issued by the code enforcement officer, on his own authority, if the application meets the requirements of law.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Rushville or Yates County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Rushville publishes no rule on the point, not that none exists. Yates County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Rushville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.