Bottineau County, North Dakota administers building permits through its Zoning Administrator, with published applications for residential, commercial and agricultural projects.1 The county application requires a sketch and building plans, and the published application fee is $100 for agricultural or residential work and $150 for commercial work.23 Septic work requires a separate First District Health Unit permit before work begins.4

At a glance

Building permit
County application published; ask the Zoning Administrator which work requires one12
Zoning
Countywide ordinance with district-specific lot and setback standards15
Permit fees
$100 agricultural/residential; $150 commercial3
Septic
First District Health Unit permit required before installation or repair64
RV living
Countywide residential occupancy rule not confirmed; ask the Zoning Administrator1
Tiny home
Countywide occupancy and minimum-home-size rules not confirmed; ask the Zoning Administrator1
Private well
State permit applies above 12.5 acre-feet per year7

Who to call

Zoning

Bottineau County Tax Director & Zoning Administrator

Building permits, rezoning applications, variance applications and Bottineau County zoning administration

(701)228-2901

[email protected]

314 5th St. West, Suite 10A (Second Floor), Bottineau, ND 58318

Online permits →

Septic permits

First District Health Unit Environmental Health Division

Onsite sewage treatment system permits, site evaluations and final inspections in Bottineau County

701-837-5121

[email protected]

801 11th Ave SW, Minot ND 58701

Roads & driveways

Bottineau County Highway Department

County roads and bridges; the department page provides an Approach Permit document

(701)228-3698

[email protected]

101 Ohmer St, Bottineau, ND 58318

Contact details are copied from each office’s official page and were checked against it on September 28, 2026.

Do you need a building permit in Bottineau County, North Dakota?

Bottineau County administers building permits through the county Zoning Administrator and publishes separate residential, commercial and agricultural applications.1 The application requires a sketch and building plans showing proposed structures and their distances from lot lines or the road centerline.2 Published application fees are $100 for agricultural or residential projects and $150 for commercial projects.3

The county materials do not clearly establish which minor projects are exempt, whether the county enforces the North Dakota State Building Code, or whether a certificate of occupancy is required. Ask the Bottineau County Tax Director & Zoning Administrator about the exact scope of review and any inspections before ordering materials.8 North Dakota’s state code framework does not itself mean that the state office performs local enforcement; enforcement belongs to jurisdictions that elect to adopt and administer the code.9

Who issues building permits in Bottineau County, and how do you reach them?

The Bottineau County Tax Director & Zoning Administrator administers building permits, rezoning applications, variance applications and other county zoning rules.8 The office is at 314 5th St. West, Suite 10A (Second Floor), Bottineau, ND 58318, and its phone number is (701)228-2901.8

A completed permit application and fee go to the Bottineau County Zoning Administrator, and the county allows the application to be emailed and the fee to be paid online.2 Include the required site sketch and building plans rather than sending only a project description.2 The published form also gives county assessors permission to inspect the property until the structure is considered complete, but that assessment language does not establish a construction-inspection schedule.2 Ask the office directly about plan review, inspections, trade permits and occupancy approval for the proposed parcel and project.8

Does Bottineau County have zoning?

Bottineau County has a county zoning ordinance, and the Zoning Administrator handles permits, rezoning, variances and other ordinance administration.1 The published district sheet identifies Agricultural, Rural Residential, Commercial, Industrial and Rural Recreational districts.5

Lot and setback rules depend on the district and utilities. Agricultural residential development requires at least 3 acres, while Rural Residential and Commercial lots require at least 5,000 square feet with common sewer or at least 1 acre with an onsite user-owned drainage field.10 Agricultural structures use a 100-foot setback from section lines and from federal, state, county and township road centerlines.11 Rural Residential yards are 20 feet from lot lines or 100 feet from the road centerline, with a 50-foot shoreline setback.11 Bottineau County’s published information does not answer every use question, so confirm the parcel’s district, permitted use and any variance need with the Zoning Administrator before closing.8

How do septic permits work in Bottineau County?

First District Health Unit requires a septic permit before installing, altering, repairing or extending an onsite sewage treatment system in Bottineau County.64 A septic permit is also required for a building that will produce sewage or wastewater when no community septic system is available.4

After application review, First District Health Unit conducts a site evaluation, takes soil samples and determines the system location and design.12 A final inspection must be scheduled before the new system is backfilled or covered, and an uninspected system is considered unapproved and illegal.13 Only 15.5% of county soils are rated without severe limitations for a conventional septic drain field, so make the site evaluation an early feasibility step rather than assuming a standard field will work.14 An individual system permit is unavailable where public sewer is available within 200 feet of the property line.4

Can you live in an RV or tiny home on land in Bottineau County?

We could not confirm a countywide Bottineau County rule allowing long-term RV residence, private-land camping or tiny-home occupancy. The county does have zoning and district-specific dimensional standards, so an RV or tiny home should not be treated as automatically allowed on every rural parcel.15

Ask the Bottineau County Zoning Administrator whether the intended use is permitted in the parcel’s zoning district, whether a building or zoning permit is required, and whether there are placement, duration or principal-dwelling conditions.8 We also could not confirm a countywide minimum dwelling floor area, accessory-dwelling rule or owner-builder exemption; the same office should answer those project-specific questions.8 A new manufactured home installed for residential use in North Dakota must be installed by a state-licensed installer and inspected by a state-licensed inspector.15 Any occupied structure producing wastewater still needs an approved disposal path through First District Health Unit when community sewer is unavailable.4

Building a home in Bottineau County: what are the steps?

  1. Ask the Bottineau County Zoning Administrator to confirm the parcel’s district, allowed residential use, lot size, setbacks and required application.11011
  2. Prepare a site sketch and building plans that locate every proposed structure relative to lot lines and the road centerline.2
  3. Submit the county application and applicable fee; the published fee is $100 for an agricultural or residential application.3
  4. Apply to First District Health Unit before septic work, then leave the system uncovered until the required final inspection.413
  5. For a private well, determine expected withdrawals; a state water permit is required above 12.5 acre-feet per year, while lower domestic and similar uses must be reported.16
  6. Ask the County Highway Department whether a proposed county-road approach requires its published Approach Permit, because applicability was not confirmed.17

What should you check before buying land in Bottineau County?

Start with zoning, sanitation and access rather than relying on a rural address alone. Confirm the zoning district and buildable envelope with the Zoning Administrator because lot minimums and setbacks vary by district and sewer arrangement.1011 Ask First District Health Unit for septic feasibility early because only 15.5% of county soils are rated without severe limitations for a conventional drain field.14

Verify legal and physical access, and ask the County Highway Department whether a new approach from a county road needs its permit.17 We could not confirm Bottineau County’s current local floodplain-development permit process, so ask the Zoning Administrator who performs the parcel-specific floodplain review before designing near mapped flood hazards.8 For water planning, North Dakota requires a state permit when a well will draw more than 12.5 acre-feet per year.7 The county’s effective property-tax rate is about 0.7%, and the median annual property-tax bill is $1,335, but parcel taxes depend on valuation and taxing districts.1819

Watch-outs

  • Bottineau County publishes building permit applications and fees, but the exact scope for minor projects is unconfirmed; ask the Zoning Administrator which application and approvals your work requires.1238
  • Do not cover a new septic system before First District Health Unit completes the required final inspection.13
  • A public sewer available within 200 feet of the property line prevents issuance of an individual onsite-system permit.4
  • Bottineau County’s private-land RV, tiny-home and floodplain-development rules could not be confirmed; ask the Zoning Administrator before purchase or placement.8

Sources

  1. Tax Director | Bottineau County, quoted and re-checked
  2. Bottineau County Zoning Board Permit Application and Setbacks, quoted and re-checked
  3. Bottineau County Zoning Board Permit Application and Setbacks, quoted and re-checked
  4. Septic (Onsite Wastewater) Systems - First District Health Unit, quoted and re-checked
  5. Bottineau County Setbacks, quoted and re-checked
  6. Septic (Onsite Wastewater) Systems - First District Health Unit, quoted and re-checked
  7. Private Well Owner's Guide: Well Installation, quoted and re-checked
  8. Bottineau County Tax Director & Zoning Administrator (bottineauco.com)
  9. Building Codes (North Dakota statewide rule), quoted and re-checked
  10. Bottineau County Setbacks, quoted and re-checked
  11. Bottineau County Setbacks, quoted and re-checked
  12. First District Health Unit Environmental Health Division (fdhu.org)
  13. Septic (Onsite Wastewater) Systems - First District Health Unit, quoted and re-checked
  14. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  15. Manufactured Home Installation Program (North Dakota statewide rule), quoted and re-checked
  16. Water Appropriation Permits (North Dakota statewide rule), quoted and re-checked
  17. Bottineau County Highway Department (bottineauco.com)
  18. Effective property tax rate: Bolthole Index county data
  19. Median property tax bill: Bolthole Index county data

Written September 28, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Bottineau County in North Dakota

58
County map
Bottineau County highlighted among the North Dakota counties · colored by Index score

How Bottineau County scores

Seclusion89100% ev.
Self-Sufficiency22100% ev.
Admin Boringness8090% ev.
Durability46100% ev.
Property Autonomy73100% ev.
Carry Cost8096% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$213kTypical home
0.7%Property tax
$2,086Land / acre
17.9"Annual rain
12.1% of yrsSevere drought
2.7 / yr (+2.5)Mid-century 100°F days
18.8 daysMid-century dry spell
1.25" (+2.6%)Mid-century 1-day rain
1.57×Wildfire change factor
100%Forward climate coverage
$1,910Home insurance / yr
1.4% / yrInsurance growth
0.56%Nonrenewal rate
single ZIP shrunk to state medianInsurance basis
150People within 30 min
110,186People within 2 hr
2,657Radius comparison (15 mi)
3.8People / sq mi
20.5%Federal land
95.5%Land at 15% slope or less
15.5%Septic soil without severe limits
163,442 acWorkable land screen
5%Wooded land
30.6 tonsBiomass / forest ac
39.2°FAvg temp

Scout Bottineau County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Bottineau County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Bottineau County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Bottineau County rules

  • County-wide zoningPresent

    County zoning ordinance and its administration in Bottineau County.

    • The source identifies the county zoning administrator as responsible for building permits, rezoning applications, variance applications, and other zoning-ordinance regulations.
    “The Bottineau County Zoning Ordinance was established to promote the health, safety, public convenience, general prosperity, and public welfare of Bottineau County and the orderly development of lands within the county.”
  • Zoning districtsPublished

    District categories identified in the Bottineau County zoning setback sheet.

    • The reviewed sheet identifies Agricultural, Rural Residential, Commercial, Industrial, and Rural Recreational districts.
    • The sheet is marked Revised 07/25/2024.
    “Agricultural District: [...] Rural Residential District: [...] Commercial District: [...] Industrial District: [...] Rural Recreational District:”
  • Minimum lot sizeSpecified

    Lot-size standards in Bottineau County zoning districts.

    • Agricultural residential development requires at least 3 acres.
    • Rural Residential and Commercial districts require at least 5,000 square feet when served by a common sewer collection system, or at least 1 acre when drained into an onsite user-owned drainage field.
    • Rural Recreational requires 15,000 square feet, minimum lot width 100 feet, and minimum depth 150 feet.
    • The source states Industrial District dimensional standards are none.

    agricultural residential lot size: >= 3 acres · rural residential/commercial lot size with common sewer: >= 5000 square feet · rural residential/commercial lot size with onsite drainage field: >= 1 acre · rural recreational lot size: >= 15000 square feet · rural recreational lot width: >= 100 feet · rural recreational lot depth: >= 150 feet

    “Agricultural District: Residential development-not less than 3 acres”
  • SetbacksSpecified

    Building and structure setbacks in Bottineau County zoning districts.

    • Agricultural: 100 feet from section lines and centerlines of federal, state, county, and township roads.
    • Rural Residential: front, side, and rear yards 20 feet from lot line or 100 feet from road centerline; shoreline 50 feet.
    • Commercial: no setbacks except minimum 100 feet from road centerline.
    • Industrial: no setbacks except minimum 100 feet from road centerline.
    • Rural Recreational: 45 feet from two-way roadway centerline or 33 feet from one-way roadway centerline; 20 feet from property line; 50 feet from shoreline.

    agricultural setback: 100 feet (From section lines and federal, state, county, and township road centerlines.) · rural residential front/side/rear setback: 20 feet (Or 100 feet from road centerline; shoreline setback is 50 feet.) · commercial/industrial road-centerline setback: 100 feet (No other setback stated in the source.) · rural recreational two-way roadway setback: 45 feet · rural recreational one-way roadway setback: 33 feet · rural recreational property-line setback: 20 feet · rural recreational shoreline setback: 50 feet

    “Building and structure setbacks- 100' from section lines and centerline of fed, state, county and township roads.”
  • Who permits septicLocal (with conditions)

    Onsite sewage treatment systems in Bottineau County administered by First District Health Unit.

    • FDHU serves Bottineau, Burke, McHenry, McLean, Renville, Sheridan, and Ward Counties.
    • NDDEQ licensing requirements apply to septic contractors.
    “First District Health Unit (FDHU) requires a permit for the installation and/or repair of any part of an onsite sewage treatment system in Bottineau, Burke, McHenry, McLean, Renville, Sheridan, or Ward Counties.”
  • Septic permitRequired

    Installation, repair, alteration, or extension of onsite sewage treatment systems in Bottineau County.

    • A permit must be obtained before work begins.
    • A septic permit is required when constructing a building that will produce sewage or wastewater and no existing community septic system is available.
    • A public sewer within 200 feet of the property line prevents issuance of an individual OSTS permit.
    • Permits are valid for 12 months from issuance under the FDHU regulations.
    • Fees are set by the adopting authority.

    public sewer distance exception: <= 200 feet (The adopting authority shall refuse an individual OSTS permit where a public sewer is available within 200 feet of the property line.) · permit validity: 12 months (If construction is not started within 12 months, a current application may be required.)

    “No entity shall install, alter, repair, or extend any individual OSTS without first obtaining a permit from the adopting authority.”
  • Septic inspectionRequired

    New onsite sewage treatment systems in Bottineau County.

    • A final inspection must be scheduled before backfilling or covering the new system.
    • Without final inspection and approval, the system is considered unapproved and illegal.
    • The installer must submit an As-Built Form after installation.
    “A final inspection must be scheduled prior to backfilling or covering the new system.”
  • Off-grid sanitationLimited

    Privies and other non-sewer sanitation systems in Bottineau County.

    • Privy pits must be watertight and have minimum capacity of 1,000 gallons.
    • The privy building must meet screening, vermin-control, self-closing-door, ventilation, and covered-seat requirements.
    • The owner must maintain a sewage-waste disposal and treatment contract with a septic-system servicer.
    • Individual OSTS permitting is unavailable where a public sewer is available within 200 feet of the property line.

    privy pit minimum capacity: >= 1000 gallons · public sewer distance: <= 200 feet (Individual OSTS permit must be refused when public sewer is available within this distance.)

    “A privy pit shall be constructed by providing a watertight structure in the pit. The watertight structure shall provide a minimum capacity of 1000 gallons.”
  • Permit feesPublished (with conditions)

    Bottineau County zoning/building permit application fees.

    • The fee sheet is part of the permit application and is marked Revised 07/25/2024.
    • The source does not state whether additional state, electrical, plumbing, mechanical, plan-review, or inspection fees apply.

    agricultural/residential permit application fee: 100 USD · commercial permit application fee: 150 USD

    “Permit Application Fee: $100 Agricultural/Residential $150 Commercial”
  • Permit processPublished (with conditions)

    Bottineau County zoning/building permit application process.

    • Applications are returned to the Bottineau County Zoning Administrator at 314 West Fifth Street, Suite 10A, Bottineau, North Dakota 58318.
    • The applicant must attach a sketch and building plans showing proposed structures and distances to lot lines or road centerline.
    • The application may be emailed and fees may be paid online.
    • The application states that the applicant's signature gives county assessors permission to inspect the property for up to two years until the structure is considered complete.
    “A sketch AND building plans showing all proposed structures and their location on the lot must be attached.”
  • Building permitNot required

    Bottineau County's official department listing includes no building, zoning, or planning office, consistent with rural North Dakota counties that adopt no county building code; permits shown online are for the City of Bottineau only.

    Bottineau County - Departments ↗Scouted from the county site, not yet independently re-checked

North Dakota rules that apply here

  • Building code adoptedAdopted (with conditions)

    The North Dakota State Building Code, consisting of the IBC, IRC, IMC, and IFGC, with the 2024 updates and stated amendments effective statewide as the state code framework.

    • Community Services updates and amends the state code but does not enforce it.
    • The 2024 updates to the IBC, IRC, IMC, and IFGC, plus the 2024 IECC and IEBC versions and proposed amendments, were adopted on September 11, 2025.
    • The new North Dakota State Building Code went into effect January 1, 2026.
    • Appendix chapters are not part of the state building code unless specifically adopted.

    code versions adopted: 2024 IBC, IRC, IMC, IFGC, IECC, and IEBC with proposed amendments · effective date: 2026-01-01

    “adopted the 2024 updates to the IBC, IRC, IMC, and IFGC and the proposed amendments.”
  • InspectionsRequired

    Factory-built modular residential or commercial structures manufactured in North Dakota or intended for placement in North Dakota, where the manufacturer produces two or more modular residential or commercial structures per year.

    • The manufacturer must contract with a third party for inspection during the manufacturing process in the factory.
    • The third-party inspector must be approved as a certified third-party inspector by the Division of Community Services.
    • The inspection covers applicable building, electrical, fire, and plumbing codes and standards.
    • When a certified third-party inspector monitors compliance during factory manufacturing, no further inspection by state or local building, electrical, fire, or plumbing inspectors may be required for that structure during the manufacturing process in the factory.
    • The statutory provision does not apply to a factory manufacturing fewer than two residential or commercial structures per year; the Commerce program page states that manufacturers producing less than two modular structures per year are exempt but must submit a yearly certification of exemption.

    annual modular structures produced: >= 2 structures/year (Factories producing fewer than two residential or commercial structures per year are exempt from the statutory provision; the Commerce program page requires a yearly certification of exemption.)

    “shall contract with a third party for the inspection of the structure for compliance with all applicable building, electrical, fire, and plumbing codes and standards”
  • Manufactured homesLimited

    New manufactured homes installed in North Dakota for residential purposes.

    • Installation must be performed by an installer licensed by the Division of Community Services.
    • The home must be inspected by an inspector licensed by the Division of Community Services.
    • The installer must first apply for and receive authorization to install the home from a licensed inspector.
    • A minimum of two inspections are required on a double-wide home and one inspection on a single-wide home.
    • After installation meets the installation requirements, an insignia is attached to show the home passes inspections.

    minimum inspections for double-wide manufactured home: >= 2 inspections · minimum inspections for single-wide manufactured home: 1 inspection

    “All new manufactured homes installed in North Dakota for residential purposes must be installed by an installer licensed by the Division of Community Services and inspected by an inspector licensed by the Division of Community Services.”
  • Well permitLimited

    Private water-supply wells statewide in North Dakota.

    • A water appropriation permit from the North Dakota Department of Water Resources is required when annual withdrawal exceeds 12.5 acre-feet.
    • A permit is not needed for wells drawing less than 12.5 acre-feet per year, according to the official private-well guide.
    • For domestic, livestock, fish and wildlife, and recreational uses below 12.5 acre-feet per year, the location and capacity of constructed works must be reported to the Department of Water Resources.
    • Anyone hired to construct, install, or repair a well, pump, or pitless unit must be licensed; individuals may install or repair wells on their own property without a license.

    annual water withdrawal threshold: > 12.5 acre-feet per year (Domestic, livestock, fish and wildlife, and recreational uses below this threshold do not require a water appropriation permit but must be reported.) · annual water withdrawal threshold: > 4073137 gallons per year (Equivalent threshold stated by the Department of Water Resources.)

    “Domestic, municipal, public, livestock, fish and wildlife, and recreational water use exceeding 12.5 acre-feet (4,073,137 gallons or 96,979 barrels) per year.”
    One more reviewed finding on this topic
    • Limited — Private water wells serving property in Bottineau County.
      “If your well will draw over 12.5 acre-feet (4,073,000 gallons) of water per year, it needs to be permitted by the North Dakota Department of Water Resources. A permit is not needed for wells that draw less than 12.5 acre-feet per year.”
  • Agricultural exemptionAvailable (with conditions)

    Buildings used for agricultural purposes under North Dakota's State Building Code.

    • The statute defines agricultural purposes to include agriculture, farming, ranching, dairying, pasturage, horticulture, floriculture, viticulture, and animal and poultry husbandry.
    • The exemption does not apply when the building is a place of human habitation or is for use by the public.
    • The exemption is from Chapter 54-21.3, the State Building Code chapter; other applicable laws or local authorities may still apply.
    “Any building used for agricultural purposes, unless a place of human habitation or for use by the public, is exempt from this chapter.”
  • Building in a floodplainRequired

    Construction or modification of North Dakota water-control structures regulated by the Department of Water Resources.

    • A DWR construction permit is required when a water-control structure is capable of retaining, diverting, or obstructing more than 50 acre-feet for dikes, other devices, and low-hazard dams.
    • The threshold is more than 25 acre-feet for medium-hazard and high-hazard dams.
    • This claim does not establish the separate local floodplain-development-permit requirements administered by local floodplain administrators.

    retention/diversion/obstruction threshold for dikes, other devices, and low-hazard dams: > 50 acre-feet · retention/diversion/obstruction threshold for medium- and high-hazard dams: > 25 acre-feet

    “A construction permit is required from the DWR if a water control structure is constructed or modified”
  • Short-term rentalsLimited

    Transient lodging rentals held out to the public for a charge in North Dakota.

    • A lodging license applies to buildings or structures held out to the public where sleeping accommodations are furnished to transient guests for a charge.
    • The lodging license does not apply to a single structure with five or fewer guest rooms and ten or fewer total occupants.
    • The lodging license also does not apply to a series or group of buildings or structures containing five or fewer guest rooms and ten or fewer total occupants.
    • License applications must be submitted at least 30 days before beginning construction or acquiring new ownership; new construction, renovation, or remodeling also requires the Section 3 Plan Review Checklist; after payment, review may take up to 30 calendar days.

    guest-room exemption threshold: <= 5 guest rooms or fewer (Only when total occupants are ten or fewer.) · occupant exemption threshold: <= 10 occupants or fewer (Only when the structure has five or fewer guest rooms.)

    “The lodging license does not apply to: Single structures with five or fewer guest rooms and ten or fewer total occupants.”
  • Campground & park staysLimited

    Camping at North Dakota state-park campsites and cabins administered by the North Dakota Parks and Recreation Department.

    • Campsite and cabin occupancy is limited to no more than 14 nights in any 30-day period.
    • All vehicles entering a state park must have a valid daily or annual vehicle entrance permit, including overnight stays and day visits.
    • The cited rule concerns state-park facilities and does not determine camping on private land or land governed by local ordinances.

    maximum campsite or cabin occupancy: <= 14 nights in any 30-day period

    “Campsite and cabin occupancy is limited to no more than 14 nights in any 30-day period.”
  • county zoning authorityGeneral

    North Dakota counties adopting zoning regulations for land and buildings within the county, including unincorporated areas.

    • The authority is exercised by the board of county commissioners.
    • Regulation is subject to North Dakota Century Code chapter 54-21.3.
    • The authority covers the location and use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.
    • County zoning regulations must be made in accordance with a comprehensive plan.
    • A county may divide all or any parts of the county into districts, and regulations must be uniform within each district but may differ between districts.
    • County zoning regulations must account for the statutory limitations governing farming, ranching, and animal feeding operations in section 11-33-02.1.
    • The board must state the grounds for approving or disapproving zoning amendments or variances, and written findings must be included in the records.
    • The board must establish zoning requirements for solid waste disposal and incineration facilities before July 1, 1994.
    • The board may impose tipping or other fees on solid waste management and incineration facilities, but may not impose a fee under this section on an energy conversion facility or coal mining operation that disposes of its waste onsite.
    • The board may establish institutional controls addressing environmental concerns with the department of environmental quality under section 23.1-10-16.
    “For the purpose of promoting health, safety, morals, public convenience, general prosperity, and public welfare, the board of county commissioners of any county may regulate and restrict within the county, subject to chapter 54-21.3, the location and the use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-builder exemption from county building-permit or inspection requirements.
  • Certificate of occupancy — Certificates of occupancy in Bottineau County.
  • Minimum dwelling size — Minimum floor-area requirements for dwellings in Bottineau County.
  • Lot coverage — Lot-coverage limits in Bottineau County.
  • Building height — Building-height limits in Bottineau County.
7 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Mandatory utility hookup
  • Subdividing land
  • Driveway access

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Bottineau County, North Dakota

Is Bottineau County a good place to live off-grid or homestead?

Bottineau County scores 58/100 on the Bolthole Index, a solid county profile. Its strengths: deep seclusion — about 150 people within a 30-minute drive and low administrative friction for a quiet rural property. Watch-outs: thin water margin (17.9″/yr rainfall).

Do you need a building permit in Bottineau County, North Dakota?

Bottineau County does not require a county building permit for a home in unincorporated areas, and it enforces county zoning. Onsite septic is permitted by First District Health Unit. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Bottineau County, North Dakota?

Land in Bottineau County runs about $2,086 per acre, based on the latest county data.

What is the water situation in Bottineau County?

Bottineau County gets about 17.9" of rain a year, with severe drought in roughly 12.1% of years.

How remote is Bottineau County?

A representative private-land location has about 150 people within a 30-minute drive and 110,186 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Bottineau County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Bottineau compares in North Dakota

Compare side-by-side →See all 53 North Dakota counties ranked →