For New Home Township in Bates County, Missouri, we could not confirm a residential building-permit requirement, building department or township zoning ordinance. Missouri leaves building-code adoption to local governments under a conditional statutory framework.1 Bates County Health Center handles onsite sewage permits throughout the county.2
At a glance
- Building permit
- Requirement and issuing office not confirmed; ask New Home Township and Bates County before work1
- Zoning
- No New Home Township zoning ordinance or no-zoning statement was confirmed3
- Septic permit
- Bates County requires one for specified new systems, major modifications and repairs4
- RV living
- Long-term occupancy and temporary-camping rules not confirmed; ask the township before using an RV as a dwelling5
- Tiny home
- Siting, minimum-size and occupancy rules not confirmed; septic requirements still apply4
- Private well
- Contractor-performed well work requires state permits; a landowner's own installation has a limited exception67
Who to call
Septic permits
Bates County Health Center - Environmental Health
Onsite sewage permits in Bates County through the Environmental Public Health Specialist
P.O. Box 178, 501 N. Orange, Butler, MO 64730
Floodplain permits
Bates County Surveyor's Office
County surveying, county road engineering and floodplain management
103 West Dakota St Rm 6, Butler, MO 64730
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in New Home Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in New Home Township, Missouri?
We could not confirm a New Home Township residential building-permit rule, adopted building code, inspection authority or certificate-of-occupancy requirement. Do not treat that gap as a permit exemption. Missouri authorizes local building-code adoption under a conditional framework rather than imposing one uniformly adopted statewide building code.1
Before ordering materials or beginning site work, ask the New Home Township clerk and Bates County Commission to identify the office with jurisdiction over the parcel and provide the controlling rule in writing. Ask separately about a building permit, trade approvals, inspections and occupancy approval. Missouri's farm-structure protection is limited to county fire-protection and fire-prevention ordinances and does not remove septic, floodplain or other applicable requirements.8
Who issues building permits in New Home Township?
We could not confirm a New Home Township building department, contracted building inspector or Bates County office that issues residential building permits there. Start with the township clerk and Bates County Commission, and request the name of the enforcing official before filing an application or paying a fee.
Keep the building question separate from septic approval. Bates County Health Center's Environmental Public Health Specialist handles sewage permits, so an answer about building permits does not settle the wastewater requirements.9 Missouri's statutory authority for county building regulation is conditional.10 Ask any identified building official for the application, fee schedule, required plans, inspection stages and occupancy rules.
Does New Home Township have zoning?
We could not confirm a New Home Township zoning ordinance, zoning map or statement that the township has no zoning. Missouri law allows qualifying counties to regulate land uses in unincorporated territory after voter approval, but that authority does not prove that Bates County or New Home Township adopted zoning.3
Before buying, ask the township clerk and Bates County Commission for a written parcel-specific answer on residential use, setbacks, minimum lot size, dwelling size, building height, accessory dwellings, manufactured homes and the number of homes allowed. A claimed agricultural exemption should be checked against flood-hazard mapping and its precise scope because Missouri's protections do not remove every land-use, health or floodplain requirement.11
How do septic permits work inside New Home Township?
Bates County Health Center handles onsite sewage permitting inside New Home Township through its Environmental Public Health Specialist.2 A permit is required for a single-family homeowner on land under 3 acres and for commercial facilities, schools, churches, renters, new systems and specified major modifications or repairs.4 A single-family residence on more than 3 acres may qualify for the county's permit exception, but the system still must meet county standards and a second system has separate conditions.4
Submit the county application with the required site drawing, certified percolation test or soil morphology, and applicable fee; construction starts only after the specialist issues the green construction permit.4 Arrange inspection and approval before covering the system.12 Bates County soil mapping shows 0% of soils without severe limitations for a conventional septic drain field, so early site evaluation is especially important.13
Can you live in an RV or tiny home in New Home Township?
We could not confirm a New Home Township rule that allows or prohibits long-term RV occupancy, temporary camping, tiny-home occupancy, manufactured homes or accessory dwellings. Ask the township clerk and Bates County Commission for the rule governing the specific parcel before buying a unit or using one as a residence. Missouri's requirement for DNR approval of campgrounds planning onsite wastewater does not answer whether one household may occupy an RV on private land.5
A tiny home or RV still needs a lawful wastewater solution. Missouri allows onsite wastewater where central sewer is unavailable, subject to the applicable local or state approval and standards.14 Bates County's permit process applies to covered new systems and major repairs or modifications.4
Building a home in New Home Township: what are the steps?
- Ask the New Home Township clerk and Bates County Commission to identify the building and zoning authority, then get parcel-specific use, setback and building-permit answers in writing.
- Check flood mapping with the Bates County Surveyor's Office, which serves as Flood Plain Manager.15 Development in a mapped Special Flood Hazard Area requires a floodplain development permit before work proceeds.16
- Confirm the road owner. A driveway built or modified within MoDOT right-of-way requires a MoDOT permit.17
- Contact Bates County Health Center, complete the site evaluation and obtain the required green septic construction permit before starting covered work.4
- Confirm the applicable state well rules; contractor-installed wells require a permit, while a landowner's own installation has a limited exception.67
- Obtain every confirmed approval and keep the septic system uncovered until county inspection.12
What should you check before buying land in New Home Township?
Get written answers on zoning, building permits, setbacks, minimum lot size, legal dwelling types, RV occupancy and road access before closing; those township-specific rules could not be confirmed. Bates County soil mapping shows 0% of soils without severe limitations for a conventional septic drain field.13 Budget for a certified soil or percolation evaluation before fixing the house site.4
Check the flood map and consult the Bates County Flood Plain Manager before placing a house, manufactured home, fill or other development in a mapped hazard area.16 Verify whether the access point meets a township, county or MoDOT road; MoDOT right-of-way work has its own permit.17 Bates County's effective property-tax rate is about 0.6%, and its median annual property-tax bill is about $962.1819
Watch-outs
- Do not assume that the absence of a published New Home Township zoning or building rule means the parcel is unrestricted; ask the township and Bates County for the controlling rules.3
- Bates County's septic permit exception for some larger single-family tracts does not waive county installation standards.4
- Missouri temporarily suspended state onsite-sewage application fees effective August 28, 2026, but local permitting processes may vary; ask Bates County Health Center what is currently collected.20
Sources
- RSMo Section 64.170 (Missouri statewide rule), quoted and re-checked
- OWTS Construction Permit Process (New Home Township), quoted and re-checked
- RSMo § 64.850 — County commission may prescribe zoning regulations (Missouri statewide rule), quoted and re-checked
- BATES COUNTY ON-SITE SEWAGE RULES AND REGULATIONS, quoted and re-checked
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
- Water Wells - PUB2945, quoted and re-checked
- Water Wells - PUB2945, quoted and re-checked
- RSMo Section 64.003 — Farm buildings and farm structures (Missouri statewide rule), quoted and re-checked
- Bates County Health Center - Environmental Health (batescountyhealthcenter.org)
- RSMo Section 64.170 — County commissions control construction; issue building permits (Missouri statewide rule), quoted and re-checked
- RSMo § 64.620 — Building restrictions — limitations on regulations, quoted and re-checked
- Bates County On-Site Sewage Rules and Regulations, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Onsite Wastewater Treatment (Missouri statewide rule), quoted and re-checked
- Bates County Surveyor's Office (batescounty.net)
- Bates County Surveyor’s Office – Bates County Courthouse, quoted and re-checked
- Permits – Missouri Department of Transportation, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.