The Town of Hume in Bates County has not published enough information to confirm its general residential building-permit or zoning requirements, so ask Hume City Hall before buying land or starting work. Hume does publish a fire-safety and public-health ordinance for replacement mobile, manufactured and modular homes, while Bates County Health Center handles onsite sewage permits countywide.12
At a glance
- Building permit
- Not confirmed for general residential construction; ask Hume City Hall3
- Zoning
- No Hume zoning ordinance or no-zoning statement was confirmed; ask City Hall3
- Replacement homes
- A town ordinance addresses fire-safety and public-health standards for replacement mobile, manufactured and modular homes1
- Onsite sewage
- Bates County Health Center handles sewage permits; permit need depends on the project and parcel24
- RVs and tiny homes
- No Hume-specific occupancy rule was confirmed; ask City Hall before purchase or placement3
Who to call
Building permits
Questions about Hume ordinances, zoning, building permits, land use and municipal utilities
12636 SW Main St, Hume, MO 64752
Septic permits
Bates County Health Center - Environmental Health
Onsite sewage permits and inspections in Bates County through the Environmental Public Health Specialist
P.O. Box 178, 501 N. Orange, Butler, MO 64730
Contact details are copied from each office’s official page and were checked against it on October 9, 2026.
Off-grid gear
Going off-grid in Town of Hume means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Hume, Missouri?
We could not confirm a general Hume residential building-permit requirement, building-inspection program or certificate-of-occupancy rule. Contact Hume City Hall at (660) 643-7111 with the parcel address and scope of work before demolition, construction or placement begins.3
Hume does identify a town ordinance concerning fire-safety and public-health standards for replacement mobile homes, manufactured homes and modular homes.1 That published ordinance list is incomplete, so a project not named there may still be governed by another town ordinance; City Hall is the place to request the current ordinance text.3
Does Hume have zoning, and can you live in an RV or tiny home?
We could not confirm that Hume has adopted zoning, and we also could not confirm an official statement that the town has no zoning. Ask Hume City Hall to confirm the parcel's allowed use, setbacks, lot requirements and any site-plan approval before treating it as buildable.3
We could not confirm Hume-specific rules for living in an RV, temporary camping, tiny-home occupancy, accessory dwellings or minimum dwelling size. Ask City Hall about the exact structure, intended duration, utility plan and parcel before purchase or placement.3 A replacement manufactured, mobile or modular home deserves particular review because Hume identifies an ordinance setting fire-safety and public-health standards for that category.1
How do septic permits work inside Hume?
Bates County Health Center says its Environmental Public Health Specialist handles sewage permits in Bates County, but the available official material does not expressly confirm whether that office or another authority issues every onsite wastewater permit inside incorporated Hume.2 Call the Health Center at 660-679-6108 before designing an onsite system, and ask Hume City Hall whether municipal sewer service or a connection requirement applies to the parcel.53
Under the Bates County process, a permit is required for a single-family residence on a lot under 3 acres and for listed nonresidential uses, new systems and major modifications or repairs.4 A qualifying single-family residence on more than 3 acres may avoid that permit, but the system must still meet county standards and the second-system exception can restore the permit requirement.4 Before covering a governed new or replacement system, arrange for the Environmental Public Health Specialist to inspect and approve it.6
Building a home in Hume: what should you do first?
- Give Hume City Hall the parcel address, proposed use and structure type, then ask for the current zoning, building-permit, inspection, setback and occupancy rules in writing.3
- Ask City Hall whether public water and sewer serve the parcel and whether connection is mandatory; we could not confirm a town connection rule.3
- If an onsite wastewater system is proposed, confirm the permitting authority and permit status with Bates County Health Center before paying for a final design or starting excavation.24
- If a private well is planned, confirm whether the landowner exception or Missouri contractor-permit requirements fit the work; Missouri requires the applicable installation permits for contractor-performed well and pump work, while a landowner may install the landowner's own well or pump without a permit under the cited state rules.78
- If the driveway work enters MoDOT right-of-way, obtain the state driveway permit before construction or modification.9
What should you check before buying land in Hume?
Get written confirmation from Hume City Hall on allowed use, building approval, setbacks, manufactured-home rules, RV occupancy, utility availability and any floodplain review before relying on a listing description.3 Hume's published ordinance list specifically flags replacement mobile, manufactured and modular homes for fire-safety and public-health standards.1
Treat septic feasibility as a site question, not a formality: across Bates County, 0% of mapped soils are rated without severe limitations for a conventional septic drain field.10 The Bates County application process requires a percolation test or soil morphology from a certified person, and a governed system must be approved before construction begins.4 Bates County's effective property-tax rate is about 0.6%, with a median annual property-tax bill of $962.1112
Watch-outs
- Do not apply Bates County's unincorporated-area building-permit or zoning status to land inside Hume; ask Hume City Hall because the town's own general requirements were not confirmed.3
- Do not cover a governed new or replacement onsite sewage system before the Environmental Public Health Specialist inspects and approves it.6
- Do not assume an RV, tiny home or replacement manufactured home can be occupied on a Hume parcel without town review; Hume's general occupancy rules were not confirmed, and replacement manufactured housing is addressed by a town ordinance.1
Sources
- City Info – City of Hume (Town of Hume), quoted and re-checked
- Environmental Health, quoted and re-checked
- Hume City Hall (cityofhume.com)
- BATES COUNTY ON-SITE SEWAGE RULES AND REGULATIONS, quoted and re-checked
- Bates County Health Center - Environmental Health (batescountyhealthcenter.org)
- Bates County On-Site Sewage Rules and Regulations, quoted and re-checked
- Water Wells - PUB2945, quoted and re-checked
- Water Wells - PUB2945, quoted and re-checked
- Permits – Missouri Department of Transportation, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Median property tax bill: Bolthole Index county data
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.