Bates County, Missouri

Building permits, zoning and land rules in East Boone Township, Missouri

For unincorporated land in East Boone Township, Bates County, Missouri, the county does not require a residential building permit and does not apply county zoning.12 We could not confirm whether East Boone Township has adopted its own building or zoning rules. Bates County Health Center handles onsite sewage permits and inspections.3

At a glance

Building permit
No county residential building permit in unincorporated Bates County; township-specific adoption not confirmed1
Zoning
No county zoning in unincorporated Bates County; no East Boone ordinance or no-zoning statement confirmed2
Septic permit
Bates County Health Center handles onsite sewage; most installations and repairs need approval34
RV living
No East Boone occupancy rule confirmed; ask the township before using an RV as a dwelling5
Tiny home
No township siting, size or occupancy rule confirmed; wastewater rules still apply6
Private well
Contractor work is permitted by Missouri; a landowner may install a qualifying own-use well without that permit7

Who to call

Septic permits

Bates County Health Center - Environmental Health

Onsite sewage permits and inspections in Bates County through the Environmental Public Health Specialist

660-679-6108

P.O. Box 178, 501 N. Orange, Butler, MO 64730

Floodplain permits

Bates County Surveyor's Office

County surveys, county road engineering and floodplain management

(660) 386-7776 Opt 6

103 West Dakota St Rm 6, Butler, MO 64730

Contact details are copied from each office’s official page and were checked against it on October 9, 2026.

Off-grid gear

Going off-grid in East Boone Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in East Boone Township, Missouri?

Bates County does not require a residential building permit for unincorporated land.1 We could not confirm a separate East Boone Township building-code adoption, building-permit requirement, inspection program or certificate-of-occupancy rule. Ask the township and Bates County Commission to confirm that the parcel is unincorporated and that no later local action applies before construction begins.

Missouri does not impose one uniformly adopted residential building code; qualifying counties may adopt local construction regulations under statutory conditions.8 The absence of a county residential building permit does not remove separate septic, floodplain, driveway or well requirements. Bates County Health Center administers onsite sewage locally, and floodplain development uses the applicable community permitting process.39

Does East Boone Township have zoning?

Bates County does not apply county zoning to unincorporated land, but we could not confirm an East Boone Township zoning ordinance or an official statement that the township has no zoning.2 Ask the township for a written answer tied to the parcel before relying on a proposed house, RV, tiny home, accessory dwelling, manufactured home or short-term rental use.

We also could not confirm township standards for setbacks, minimum lot size, minimum dwelling size, building height or lot coverage. Missouri law allows eligible counties to zone unincorporated territory after voter approval, but that statewide authority does not prove that a local zoning program exists.10 A farm exemption is not a blanket exemption from every rule: Missouri's county fire-ordinance exemption concerns farm buildings and farm structures, while septic and floodplain requirements can still apply.11

How do septic permits work inside East Boone Township?

Bates County Health Center's Environmental Public Health Specialist handles onsite sewage permits in East Boone Township.3 A construction permit is required before most onsite systems are installed or repaired, although some single-family lots may qualify for an exemption.4 Under the county process, a single-family home on a lot under 3 acres needs a permit, while a qualifying single-family lot over 3 acres does not need the permit but must still meet county standards.12

Submit the system drawing, soil or percolation information and applicable materials before construction; work begins after the Environmental Public Health Specialist reviews the application and issues the construction permit.12 Before covering a new or replacement system, arrange for the county specialist to inspect and approve it.13 Countywide soil mapping rates 0% of soils as free from severe limitations for a conventional drain field, so make the site evaluation an early contingency.14

Can you live in an RV or tiny home in East Boone Township?

We could not confirm an East Boone Township rule that allows or prohibits living in an RV, temporary camping, tiny-home occupancy, manufactured-home occupancy or accessory dwellings. Ask the township for the rule that applies to the specific parcel and proposed use before buying a unit or installing utilities. The absence of a published zoning rule is not the same as permission.

Wastewater remains regulated regardless of the dwelling label. Missouri allows onsite wastewater treatment where central sewer service is unavailable, subject to the applicable permit, system standards and local requirements.5 Wastewater cannot be discharged into a road ditch or onto the ground.6 A development planned as a mobile-home park or campground needs Missouri Department of Natural Resources approval if onsite wastewater treatment will be used.15

Building a home in East Boone Township: what are the steps?

  1. Confirm with East Boone Township and Bates County that the parcel is unincorporated, and ask for any township building or zoning action that applies; no East Boone-specific adoption could be confirmed.
  2. Ask the Bates County Surveyor's Office about floodplain status and the road authority for the proposed access; that office serves as County Road Engineer and Flood Plain Manager.16 A driveway within Missouri Department of Transportation right-of-way requires a MoDOT permit.17
  3. Contact Bates County Health Center before finalizing the house site, then complete the soil evaluation and onsite sewage approval that apply to the tract.1812
  4. Use a properly permitted well contractor, or confirm that a landowner's own-use installation meets Missouri's exception and construction rules.7
  5. If the site is in a floodplain, obtain the applicable floodplain development permit before development.9

What should you check before buying land in East Boone Township?

Get written confirmation of township zoning, building-permit jurisdiction, setbacks, allowed dwelling types and RV occupancy before closing; those East Boone-specific rules could not be confirmed. Verify access with the road owner, because work in MoDOT right-of-way requires a permit and the Bates County Surveyor's Office also serves as County Road Engineer.1716

Make septic feasibility a contract contingency. Countywide soil mapping rates 0% of soils as free from severe limitations for a conventional drain field, and the county process relies on soil or percolation information before construction approval.1412 Check flood maps before placing a home, manufactured home, fill or access; development in a mapped floodplain requires the applicable community permit.19 Bates County's effective property-tax rate is about 0.6%, and the median annual property-tax bill is about $962.2021

Watch-outs

  • Do not read the lack of confirmed East Boone zoning materials as permission for every use; ask the township for a parcel-specific written answer.2
  • A qualifying large residential lot may avoid the county septic permit, but the onsite system must still meet Bates County standards.12
  • Floodplain and road-access approvals remain separate from the county's residential building-permit answer.917

Sources

  1. Bates County Courthouse - Official County Website (department directory) (2026 county census)
  2. Bates County Courthouse - Official County Website (department directory) (2026 county census)
  3. Environmental Health (East Boone Township), quoted and re-checked
  4. OWTS Construction Permit Process (East Boone Township), quoted and re-checked
  5. Onsite Wastewater Treatment (Missouri statewide rule), quoted and re-checked
  6. Frequently Asked Questions: Onsite Wastewater Treatment Systems (East Boone Township), quoted and re-checked
  7. RSMo Section 256.607 — Well installation contractor, permit (East Boone Township), quoted and re-checked
  8. RSMo Section 64.170 (Missouri statewide rule), quoted and re-checked
  9. Floodplain Forms – Missouri SEMA, quoted and re-checked
  10. RSMo § 64.090 — Planning and zoning powers of county commission (Missouri statewide rule), quoted and re-checked
  11. RSMo Section 64.003 — Farm buildings and farm structures (Missouri statewide rule), quoted and re-checked
  12. BATES COUNTY ON-SITE SEWAGE RULES AND REGULATIONS, quoted and re-checked
  13. Bates County On-Site Sewage Rules and Regulations, quoted and re-checked
  14. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  15. OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
  16. Bates County Surveyor's Office (batescounty.net)
  17. Permits – Missouri Department of Transportation, quoted and re-checked
  18. Bates County Health Center - Environmental Health (batescountyhealthcenter.org)
  19. Bates County Surveyor’s Office – Bates County Courthouse, quoted and re-checked
  20. Effective property tax rate: Bolthole Index county data
  21. Median property tax bill: Bolthole Index county data

Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for East Boone Township

Rules another office applies inside East Boone Township

East Boone Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty

    On-site sewage permitting and environmental-health administration inside East Boone township by Bates County Health Center personnel.

    • The Bates County Health Center page states that sewage permits are handled by its Environmental Public Health Specialist.
    • This claim identifies the county health authority; it does not treat Bates County as East Boone township's own ordinance-maker.
    “Sewage permists are also handled by the Environmental Public Health Specialist.”
    2 more reviewed findings on this topic
    • Local (with conditions) — Onsite wastewater systems inside East Boone township, which lies in Bates County.
      “Sewage permists are also handled by the Environmental Public Health Specialist.”
    • County (with conditions) — Onsite wastewater systems inside East Boone township, through the Bates County Health Center and its Environmental Public Health Specialist.
      “Agency: Bates County Health Center Authority Type: Ordinance Address: 501 N. Orange PO Box 178 Butler, MO 64730 County: Bates”
  • Septic permitRequired

    Installing, majorly modifying, or majorly repairing an onsite sewage disposal system inside East Boone township.

    • A construction permit is required before installing or repairing most OWTS.
    • Some single-family residential lots may be exempt under RSMo 701.031.
    • The application must be submitted to the agency with permitting authority for the property.
    • Effective date stated by statute: September 1, 1995.
    “Except as otherwise provided in section 701.031, no person may, on or after September 1, 1995, construct or make a major modification or major repair to an on-site sewage disposal system without first notifying the city, county or department and completing an application, upon a form provided by the department, submitting an application fee in the amount established by the city, county or department, and obtaining a construction permit.”
    2 more reviewed findings on this topic
    • Required — Installing or repairing most onsite wastewater systems inside East Boone township.
      “A construction permit is required to install or repair an onsite system on any residential property less than three acres.”
    • Required — Installing or repairing most onsite wastewater treatment systems inside East Boone township.
      “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
  • Off-grid sanitationLimited

    Sanitary disposal for buildings inside East Boone township that are not connected to a public sewer.

    • Domestic sewage must be disposed of through a regulated sewer system or an onsite sewage disposal system.
    • A single-family residence lot of three acres or more may be excluded from the state OWTS provisions if the statutory conditions are satisfied.
    • A residential lot of ten acres or more has a separate exemption subject to the statutory spacing, density, lake, property-line, effluent, contamination, and nuisance conditions.

    single-family residence lot exemption: >= 3 acres (All statutory conditions in RSMo 701.031 must be satisfied.) · distance from another onsite system for ten-acre exemption: > 360 feet (No more than one single-family residence per each ten acres in the aggregate.) · system distance from adjoining property line: > 10 feet (All points of the system must be in excess of ten feet from every adjoining property line.)

    “Property owners of all buildings where people live, work or assemble shall provide for the sanitary disposal of all domestic sewage. Except as provided in this section, sewage and waste from such buildings shall be disposed of by discharging into a sewer system regulated pursuant to chapter 644, or shall be disposed of by discharging into an on-site sewage disposal system operated as defined by rules promulgated pursuant to sections 701.025 to 701.059.”
    One more reviewed finding on this topic
  • Well permitLimited

    Water-well construction inside East Boone township.

    • A well installation contractor or pump installation contractor acting as the primary contractor must obtain a permit.
    • A person may construct a well on the person's own or leased property for a permanent single-family residence or farming use without obtaining that contractor permit, subject to Missouri well-construction rules.
    • The owner-use exception does not extend to public use or another residence.
    “Nothing in sections 256.600 to 256.640 shall prevent a person who has not obtained a permit pursuant to sections 256.600 to 256.640 from constructing a well on his own or leased property intended for use only in a single-family house which is his permanent residence, or intended for use only for farming purposes on his farm, and where the waters to be produced are not intended for use by the public or in any residence other than his own.”
    One more reviewed finding on this topic
  • Subdividing landRegulated (with conditions)

    Subdivision or development inside East Boone township involving onsite wastewater treatment systems.

    • Missouri DHSS states that anyone subdividing or developing property must comply with DNR residential development regulations as well as the onsite sewage law.
    • DNR approval is required for subdivisions, mobile home parks, and campgrounds if onsite wastewater treatment is planned.
    “DNR must approve subdivisions, mobile home parks and campgrounds if the use of OWTS is planned.”
    2 more reviewed findings on this topic
  • Permit processPublished (with conditions)

    Onsite wastewater permitting inside East Boone township.

    • Determine the agency with permitting authority where the work is being done.
    • Work should not begin until a permit has been issued or an exemption has been confirmed.
    • Bates County Health Center is the listed ordinance authority for Bates County.
    “determine the agency that has permitting authority”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask East Boone Township or Bates County directly.

  • Building permit — Building construction inside East Boone township.
  • Owner-builder exemption — Owner-builders constructing inside East Boone township.
  • Building code adopted — Residential and other building construction inside East Boone township.
  • Inspections — Building construction inside East Boone township.
  • Certificate of occupancy — New or altered occupancies inside East Boone township.
19 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that East Boone Township publishes no rule on the point, not that none exists. Bates County’s page lists the county offices to call.