Scott County, Minnesota requires building permits for construction, additions, alterations and moves in its townships, issued by Scott County Building Inspections1. County Planning & Zoning sets zoning in all ten townships, while each of the eight cities handles its own zoning2. Septic permits come from Scott County Environmental Services, and a camper or RV cannot be lived in for more than 14 days on unincorporated land3,4.
Do you need a building permit in Scott County, Minnesota?
Scott County generally requires permits when a building or structure is built, enlarged, altered, repaired, moved, converted, demolished or changes use in the county's township permitting jurisdiction; gas, mechanical and plumbing work is covered too.
Scott County generally requires permits when a building or structure is built, enlarged, altered, repaired, moved, converted, demolished or changes use in the county's township permitting jurisdiction; gas, mechanical and plumbing work is covered too1. Scott County has adopted the Minnesota State Building Code for buildings in its townships8. A homeowner building for personal use or rental is exempt from Minnesota's residential contractor license but still needs the building, zoning and septic permits; building or improving more than one property in 24 months is presumed to be for speculation unless the properties are kept as rentals5. A qualifying agricultural building can be exempt only when every answer on the county checklist is yes and the required certification and zoning or agricultural applications are submitted; electrical permits still apply, as do septic or sewer permits when plumbing is installed6. The published fee schedule includes a $7.50 technology fee on building, plumbing and mechanical permits, with other charges varying by permit type9. When a new single-family home replaces an existing dwelling on the same parcel, the old dwelling may remain until the new home's certificate of occupancy is issued; removal or conversion is then due within 60 days and requires a $50,000 or approved estimated-cost guarantee4.
Who is the Scott County building department, and how do you reach them?
Scott County Building Inspections issues building permits and manages Minnesota State Building Code administration within the townships; cities handle their own zoning, while septic permits come from the county as described below.
Scott County Building Inspections issues building permits and manages Minnesota State Building Code administration within the townships; cities handle their own zoning, while septic permits come from the county as described below2,10. The office is at 200 4th Avenue W in Shakopee, and its mainline is 952-496-816010. All applications must be filed and processed online through the county's ePermit portal, where an applicant can upload required documents, pay and retrieve approved documents10. Staff are available in person by appointment, so call the mainline before visiting10. If land-disturbing work is in a shoreland or bluff overlay zone, contact the Natural Resources Department at 952-496-8881 about the separate grading permit1. Permitted construction is subject to inspections selected by the building official, and the applicant must keep the work accessible and exposed until it is approved11.
Does Scott County have zoning?
Scott County Planning & Zoning administers zoning in all ten townships, while each of the county's eight cities is responsible for its own planning and zoning.
Scott County Planning & Zoning administers zoning in all ten townships, while each of the county's eight cities is responsible for its own planning and zoning2. The county publishes a zoning map and district rules governing uses, minimum lot sizes, accessory-building sizes and other controls in the townships8. Setbacks and maximum building heights vary by district and structure type, and additional shoreland, wetland, bluff, lake or stream standards may affect a building site12. Lot-coverage limits also depend on the district4. Ordinary residential dwellings must have at least 960 square feet of finished floor area, except mobile homes and accessory dwelling units4. The county approves subdivisions and plat-related planning actions within its county-administered jurisdiction13. Planning & Zoning is available by appointment only at 952-496-86532.
How do septic permits work in Scott County?
Scott County Environmental Services requires septic permits through its countywide program and coordinates enforcement and permitting with the larger cities.
Scott County Environmental Services requires septic permits through its countywide program and coordinates enforcement and permitting with the larger cities3. Apply through the Building Inspections ePermit portal with the application, system design, site map, elevations, management plan and soil-observation logs3. The 2026 fee for a residential Type I, II or III system is $890 with an MPCA-licensed installer or $1,160 when the property owner installs it; other systems and modifications have separate fees3. A compliance inspection is required for a new system, before a bedroom-addition permit, when an existing system is altered by permit or variance, and when compliance is otherwise determined3. Only about 1.3% of Scott County soils avoid a severe USDA limitation rating for conventional drain fields, so establish site-specific feasibility early14. Ask Environmental Services at 952-496-8177 about any nonstandard sanitation plan3.
Can you live in an RV or tiny home on your land in Scott County?
In unincorporated Scott County, a camper, travel trailer, motor home, park model trailer or recreational vehicle cannot be occupied as a dwelling unit for more than 14 days.
In unincorporated Scott County, a camper, travel trailer, motor home, park model trailer or recreational vehicle cannot be occupied as a dwelling unit for more than 14 days4. Private campgrounds cannot be used as year-round residences, and residential use of camping vehicles there is prohibited from November 1 through April 1 except for a campground owner or caretaker4. The county zoning ordinance does not use the term tiny home, so the structure’s classification decides the rule7. A tiny home classified as an ordinary dwelling must have at least 960 square feet of finished floor area unless it is a mobile home or accessory dwelling unit7. A tiny home classified as a park model trailer, travel trailer, motor home or recreational vehicle cannot be occupied as a dwelling unit for more than 14 days7. Ask Scott County Planning & Zoning how the proposed structure would be classified before relying on a tiny-home plan2. A new manufactured home installed for occupancy in Minnesota must be inspected under federal installation standards15.
How do you build a home in Scott County, step by step?
Confirm the parcel's zoning district, allowed use, setbacks, height and lot-coverage limits with Scott County Planning & Zoning; appointments are made at 952-496-8653.
- Confirm the parcel's zoning district, allowed use, setbacks, height and lot-coverage limits with Scott County Planning & Zoning; appointments are made at 952-496-86532,4,8,12.
- Establish septic feasibility and submit the required design package through the ePermit portal for Environmental Services approval3.
- Ask the Natural Resources Department whether land disturbance in a shoreland or bluff overlay zone needs a separate grading permit1.
- File the building-permit application online through the ePermit portal; Scott County Building Inspections processes all permit applications there10.
- Obtain a road-authority permit for a new or additional driveway onto a public highway; the Scott County Highway Department handles county-highway permits16,17.
- Keep permitted work accessible and exposed for the inspections identified by the building official11.
What should you check before buying land in Scott County?
Start with wastewater: only about 1.3% of Scott County soils avoid a severe USDA limitation rating for a conventional septic drain field.
Start with wastewater: only about 1.3% of Scott County soils avoid a severe USDA limitation rating for a conventional septic drain field14. Then confirm zoning, lot coverage and the proposed use with Planning & Zoning, because district standards vary and ordinary dwellings generally must have at least 960 square feet of finished floor area4. About 93.7% of county land has a slope of 15% or less, while about 23.7% is wooded, but parcel-level soils, drainage and overlays still need review14. The nearest city of 100,000 or more is about 23 miles from the county center14. Farmland value averages about $9,547 per acre, the typical home value is about $450,087, and the median annual property-tax bill is about $4,19514. Confirm whether access is from a county, state, city or township road, because a new or additional public-highway access requires the relevant road authority's permit16.
Watch-outs
- Scott County Planning & Zoning works by appointment only, so call 952-496-8653 before you visit rather than dropping in2.
- Only about 1.3% of Scott County's soils avoid a severe limitation for a conventional septic drain field, so establish site-specific septic feasibility early14.
- An RV cannot be occupied as a dwelling unit for more than 14 days on unincorporated Scott County land4.
Sources
17 official pages, each quoted and re-checked · written October 9, 2026
- Permit Requirements
- Planning & Zoning
- Septic Systems
- scottcountymn.gov
- Minnesota Statutes § 326B.805
- Agricultural Building Permit Exemption Certification and Application
- Scott County Zoning Ordinance No. 3
- Building Inspections
- 2026 Scott County Fee Schedule
- Scott County Building Inspections (scottcountymn.gov)
- 1300.0210 INSPECTIONS (Minnesota statewide rule)
- Scott County Zoning Ordinance No. 3
- Land Development & Land Use Process
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Manufactured home information (Minnesota statewide rule)
- Minnesota Statutes, section 160.18: Access to roads; approaches (Minnesota statewide rule)
- Scott County Highway Department (scottcountymn.gov)
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Scott County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.