Zoning, building permits and septic rules in New Prague, Minnesota
New Prague is a city in Scott County, Minnesota. New Prague adopts its own zoning, so inside its limits New Prague’s rules apply, not the county’s. 3 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Scott County page.
Answers from the rulebook for New Prague
New Prague’s own rules
Building permitRequired
Residential construction and alterations inside New Prague city, issued by the city building department
Listed items include new construction, additions, gazebos, porches, attached or detached garages, sheds and accessory buildings, decks, fences, pools, roofs, siding, windows, and foundation repair.
An administrative permit is required to review placement, square footage and height of sheds and accessory buildings 200 sf or less, and placement, height and material of fences.
Residential plumbing permits, including for new construction, and residential mechanical permits are also listed.
Electrical permits are handled by the State of Minnesota electrical inspector, not the city.
The document shows 'revised: 4/6/2026'; that is a revision stamp, not an effective date.
Questions about permitting and planning/zoning go to the city at (952) 758-4401.
“residential building permits are required for the following items: additions, gazebos, porches”
Local zoningPresent (with conditions)
Land inside New Prague city limits: zoning is administered by the city under its Unified Development Code (UDC)
The city's UDC page states the UDC became effective 3/26/26 and includes zoning requirements.
The American Legal Publishing copy of the code is current only through Ord. 357 passed 11-3-25, which predates the UDC; it was not relied on for current zoning text.
Zoning map PDFs dated 4/30/26 and 5/19/26 appear in search results but were not opened; district boundaries are unverified.
“the new prague unified development code (udc) became effective on 3/26/26. the udc includes requirements pertaining to zoning, subdivision of land, floodplain and building codes.”
Subdividing landRegulated (with conditions)
Division of land into lots inside New Prague city
Subdivision requirements sit in the Unified Development Code; the subdivision design standards chapter was not read.
Applies to land inside city limits only.
“the new prague unified development code (udc) became effective on 3/26/26. the udc includes requirements pertaining to zoning, subdivision of land, floodplain and building codes.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask New Prague or Scott County directly.
Owner-builder exemption — Owner-builder permit exemption for a homeowner building on their own land inside New Prague city
Building code adopted — Building code edition adopted for construction inside New Prague city
Inspections — Building inspections for residential construction inside New Prague city
Certificate of occupancy — Certificate of occupancy for new homes inside New Prague city
Zoning districts — Zoning districts published for land inside New Prague city
22 more unanswered
Minimum dwelling size
Minimum lot size
Setbacks
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Driveway access
Building in a floodplain
Short-term rentals
Permit fees
Permit process
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that New Prague publishes no rule on the point, not that none exists. Scott County’s page lists the county offices to call.
Off-grid gear
Going off-grid in New Prague means bringing your own water and power. The kit we’d start with: