Alcona County, Michigan requires a building permit before construction, and the county Building Division enforces the Michigan Building Code and Michigan Residential Code12. Zoning requirements vary among the townships, City of Harrisville and Village of Lincoln, while District Health Department No. 2 handles residential septic evaluations and permits34. A rural project can therefore need separate local, county and health-department approvals.

At a glance

Building permit
Required before construction; the county enforces the Michigan Building and Residential Codes12
Zoning
Varies by township or incorporated municipality; confirm the ordinance for the parcel3
Septic permit
Required from District Health Department No. 2 before installing or repairing an on-site system5
Permit forms
Online forms are published for building and the principal trade permits6
RV living
No countywide answer was confirmed; ask the parcel's township, city or village zoning office3
Tiny home
Local zoning and construction approvals apply; wheels do not make a tiny house an RV7
Owner-builder exemption
We could not confirm one; ask the Alcona County Building Division before relying on an exemption8
Septic soils
Only 7.3% of soils avoid severe limits for a conventional drain field9

Who to call

Building permits

Alcona County Building Division

County building-code administration and building, electrical, plumbing and mechanical permit contacts

(989) 724-9440

216 W. Main Street, Harrisville, MI 48740

Online permits →

Zoning

Alcona Township

Alcona Township's zoning ordinance and local zoning information

989.471-5004

5576 N US 23 Black River, MI 48721

Septic permits

District Health Department No. 2 - Alcona County Office

Alcona County contact for on-site sewage disposal and water-supply permits

(989) 724-6757

117 E Main Street Harrisville, MI 48740

Also useful

District Health Department No. 2 - Residential On-Site Sewage Disposal System

Septic applications, site and soil evaluations, permits and final inspections

Also useful

District Health Department No. 2 - Water Supply Construction Permits

Water-supply construction applications and permits for covered wells and other supplies

Contact details are copied from each office’s official page and were checked against it on September 29, 2026.

Do you need a building permit in Alcona County, Michigan?

Yes. Alcona County requires a written building-permit application before construction, and a permit is also required when the use or occupancy of a structure or part of one changes10. Ordinary repairs do not require a permit, but work affecting structure, exits, plumbing, electrical, mechanical systems, public health or general safety falls outside that exception1. The Alcona County Building Division enforces the Michigan Building Code and Michigan Residential Code2. Michigan's current statewide building rule uses the 2021 Michigan Building Code, effective April 9, 2025, with Michigan amendments and listed exceptions; residential requirements remain in the Michigan Residential Code11. Before assuming a barn, shed or farm structure is exempt, ask the Building Division, because we could not confirm a countywide agricultural exemption.

Who issues Alcona County building permits, and how do you reach them?

The Alcona County Building Division is the county contact for building-code administration and for building, electrical, plumbing and mechanical permit questions12. The office is at 216 W. Main Street, Harrisville, MI 48740, and its main phone is (989) 724-944012. Published office hours are Monday through Friday, 8:30 a.m. to noon and 1:00 p.m. to 4:30 p.m.12. The county publishes online fillable forms for building, electrical, mechanical, plumbing and solar permits6. The inspection sequence includes footing, foundation, rough-in or framing, insulation and final occupancy stages; footing inspection must be requested 24 hours before concrete is poured, and final inspection requires the project and approved trade work to be fully complete13. A complete current building-fee schedule was not confirmed, although the county publishes fees for roofing and solar work14.

Does Alcona County have zoning?

Zoning requirements in Alcona County vary among the applicable townships, the City of Harrisville and the Village of Lincoln, so the controlling ordinance depends on the parcel's location3. Michigan law allows counties, townships, cities and villages to establish zoning districts, but the statewide framework does not tell you which local district rules govern a particular parcel15. Alcona Township illustrates the local approach: its published districts include residential, manufactured-housing, agricultural, forest-recreation, commercial and industrial districts16. For land in Alcona Township, the township hall is at 5576 N US 23, Black River, MI 48721, and the published contact number is 989.471-500417. For land elsewhere, identify the correct township or incorporated municipality and ask its zoning office about permitted uses, setbacks, lot size, building height and accessory dwellings. We could not confirm one countywide ordinance or complete countywide dimensional schedule.

How do septic permits work in Alcona County?

District Health Department No. 2 handles residential wastewater evaluations and permits for Alcona County4. A property owner must obtain a construction permit before installing or repairing an on-site sewage disposal system5. After the application and fee are submitted, environmental-health staff conduct a site review and soil evaluation and issue a permit if conditions allow18. If approved, the applicant receives either a permit to construct or a vacant-land approval letter19. The completed system must receive a final DHD2 inspection before it is covered or backfilled20. Only 7.3% of Alcona County soils avoid severe limitations for a conventional drain field, so make septic feasibility an early purchase contingency9. DHD2 directs applicants to its fee schedule or nearest office for current permit costs21. The Alcona County office is at 117 E Main Street, Harrisville, MI 48740, phone (989) 724-675722. We could not confirm the current well-permit rule; ask DHD2 before drilling22.

Can you live in an RV or tiny home in Alcona County?

We could not confirm a single countywide rule allowing long-term RV residence or private-land camping in Alcona County. Because zoning varies locally, ask the zoning authority for the parcel's township, the City of Harrisville or the Village of Lincoln about RV placement, occupancy, time limits and utility connections before moving an RV onto the land3. Michigan guidance does not create a statewide right to occupy a tiny house: tiny houses, including units built on wheels, require applicable local zoning, building, electrical and plumbing approvals, plus health-department approval for wells and septic systems7. A home with plumbing fixtures must connect to a public sewer where available or to an approved private sewage disposal system23. Sanitary wastewater from household fixtures must go to a municipal sewer or an on-site septic system, so an off-grid plan still needs an approved sanitation path24.

What are the steps to build a home in Alcona County?

  1. Identify the parcel's township or incorporated municipality and get its zoning answer on use, setbacks, lot size, dwelling type and temporary RV occupancy3.
  1. Ask District Health Department No. 2 for the septic application and site evaluation before fixing the house location, because most county soils have severe limits for a conventional drain field59.
  1. Ask DHD2 what current approval applies before drilling a well; we could not confirm the current well-permit rule22.
  1. Submit the written building-permit application before construction; the county publishes online forms and enforces the Michigan building and residential codes162.
  1. Schedule the county's required building inspection stages, and arrange DHD2's final septic inspection before backfilling1320.
  1. Complete the project and approved trade work before requesting the final occupancy inspection13.

What should you check before buying land in Alcona County?

Start with septic suitability: only 7.3% of Alcona County soils avoid severe limits for a conventional drain field, and DHD2 evaluates the site and soil before issuing a construction permit918. Ask DHD2 about the current well-approval process at the same time, because we could not confirm the current well-permit rule22. Confirm the parcel's zoning district and dimensional standards with its township or incorporated municipality because local requirements vary across Alcona County3. The county is 80.5% wooded and 90.2% of its land has a slope of 15% or less, so a gentle parcel may still carry meaningful clearing costs2526. Federal land makes up 26.4% of the county, which makes a boundary survey and access review especially useful near public holdings27. The typical effective property-tax rate is 0.8%, and the median annual property-tax bill is $1,3222829.

Watch-outs

  • Follow the published county inspection sequence and request the footing inspection 24 hours before concrete is poured13.
  • Do not cover or backfill a completed septic system before District Health Department No. 2 performs its final inspection20.
  • We could not confirm an owner-builder exemption in Alcona County, so ask the Building Division before assuming self-performed work changes the permit or licensing requirements8.
  • RV, tiny-home, minimum-size and setback answers depend on the applicable local ordinance; ask the parcel's township, city or village zoning office for a written answer3.

Sources

  1. Building Dept. Permits, quoted and re-checked
  2. Building Department - Welcome to Alcona County, quoted and re-checked
  3. Alcona County Township Zoning Administrators, quoted and re-checked
  4. 2019 Instructions to Wastewater Applicants, quoted and re-checked
  5. Residential On-Site Sewage Disposal System, quoted and re-checked
  6. Building Dept. Permits, quoted and re-checked
  7. 2022 ARVC - General (Michigan statewide rule), quoted and re-checked
  8. (2026 county census)
  9. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  10. Building Permit Information, quoted and re-checked
  11. Code Books (Michigan statewide rule), quoted and re-checked
  12. Alcona County Building Division (alconacountymi.com)
  13. Inspection FAQ, quoted and re-checked
  14. Application for Roofing Permit, quoted and re-checked
  15. Michigan Zoning Enabling Act (Michigan statewide rule), quoted and re-checked
  16. Alcona Township Zoning Ordinance, quoted and re-checked
  17. Alcona Township (alconatownship.com)
  18. District Health Department No. 2 - Residential On-Site Sewage Disposal System (dhd2.org)
  19. 2019 Instructions to Wastewater Applicants, quoted and re-checked
  20. Residential On-Site Sewage Disposal System, quoted and re-checked
  21. Frequently Asked Questions, quoted and re-checked
  22. District Health Department No. 2 - Alcona County Office (dhd2.org)
  23. Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
  24. Disposal of residential wastewater such as swimming pool water (Michigan statewide rule), quoted and re-checked
  25. Wooded share of land: Bolthole Index county data
  26. Share of land at 15% slope or less: Bolthole Index county data
  27. Federal land share: Bolthole Index county data
  28. Effective property tax rate: Bolthole Index county data
  29. Median property tax bill: Bolthole Index county data

Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Alcona County in Michigan

80
County map
Alcona County highlighted among the Michigan counties · colored by Index score

How Alcona County scores

Seclusion83100% ev.
Self-Sufficiency62100% ev.
Admin Boringness4290% ev.
Durability74100% ev.
Property Autonomy77100% ev.
Carry Cost84100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$200kTypical home
0.8%Property tax
$3,069Land / acre
31"Annual rain
1.4% of yrsSevere drought
0.7 / yr (+0.7)Mid-century 100°F days
11.2 daysMid-century dry spell
1.29" (+9.4%)Mid-century 1-day rain
1.63×Wildfire change factor
100%Forward climate coverage
$929Home insurance / yr
-0.1% / yrInsurance growth
1.02%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
8,614People within 30 min
216,189People within 2 hr
11,502Radius comparison (15 mi)
15.5People / sq mi
26.4%Federal land
90.2%Land at 15% slope or less
7.3%Septic soil without severe limits
30,421 acWorkable land screen
80.5%Wooded land
47.2 tonsBiomass / forest ac
44.3°FAvg temp

Scout Alcona County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Alcona County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Alcona County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Alcona County rules

  • Building permitRequired

    Building construction and changes of use or occupancy within the jurisdiction of the appropriate enforcing agency, including Alcona County Building Division jurisdiction.

    • A written application must be submitted before construction.
    • A permit is also required when the use or occupancy of a structure or portion thereof is changed.
    • Ordinary repairs do not require a permit, but the stated structural, egress, utility, and public-health exceptions apply.
    “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application”
    One more reviewed finding on this topic
    • Required — Building construction permits handled through the Alcona County Building Department.
      “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit. A permit is also required when the use or occupancy of a structure or portion thereof is changed. A permit is not required for ordinary repairs.”
  • Building code adoptedAdopted

    Building-code enforcement by the Alcona County Building Division.

    • The county page states adoption and enforcement under Michigan law.
    • Residential requirements are governed through the Michigan Residential Code.
    “As mandated by Michigan State law in 2004, Alcona County has adopted and enforces the Michigan Building Code and the Michigan Residential Code.”
    2 more reviewed findings on this topic
    • Adopted — Alcona County Building Division enforcement of the Michigan Building Code and Michigan Residential Code.
      “As mandated by Michigan State law in 2004, Alcona County has adopted and enforces the Michigan Building Code and the Michigan Residential Code.”
    • Adopted — Alcona County Building Division enforcement of the Michigan Building Code and Michigan Residential Code.
      “As mandated by Michigan State law in 2004, Alcona County has adopted and enforces the Michigan Building Code and the Michigan Residential Code.”
  • InspectionsRequired

    Building inspections for construction projects administered by the Alcona County Building Department.

    • Footing inspection must be called 24 hours before concrete is poured.
    • Foundation, rough-in/framing, insulation, and final occupancy inspection requirements apply as described on the county FAQ.
    • Final inspection requires the project to be 100% completed, including approved electrical, plumbing, and mechanical work.

    inspection notice before concrete pour: 24 hours

    “Call (24) hours before concrete is planned to be poured. In the Inspector will check for the following items: form boards in place, Depth, Flat Bottom & Code Minimums.”
  • Local zoningVaries (with conditions)

    Aggregate of local zoning within Alcona County; the actual rule-makers are townships, the City of Harrisville, and the Village of Lincoln.

    • Zoning administration and requirements must be checked with the applicable township or incorporated municipality.
    “ALCONA COUNTY Township Zoning Administrators [...] City of Harrisville [...] Village of Lincoln”
  • Who permits septicMixed (with conditions)

    Residential wastewater permitting and evaluation for Alcona County through District Health Department No. 2.

    • The source identifies a Health Department evaluation and refers to DHD2 environmental health regulations.
    • DHD2 serves multiple counties; this claim is scoped to the district authority, not to a countywide county department.
    “DISTRICT HEALTH DEPARTMENT NO.2 Alcona County Iosco County Ogemaw County Oscoda County”
  • Septic permitRequired

    Installing or repairing an on-site sewage disposal system in Alcona County within the DHD2 service area.

    • A construction permit is required before installing or repairing the system.
    • The system must be constructed according to Environmental Health Regulations and special permit requirements.
    • The permit is valid for the remainder of its issuance year and the following calendar year.
    • One 12-month extension may be available upon timely written request, required fee, and no site changes; after one extension a new application is required.

    permit extension: 12 months (Only one extension is allowed.)

    “property owners obtain a construction permit prior to installing or repairing an onsite sewage disposal system.”
    2 more reviewed findings on this topic
    • Required — Residential wastewater disposal systems and vacant-land evaluations in Alcona County handled by District Health Department No. 2.
      “If the application is approved for wastewater disposal, the applicant will receive either a Permit to Construct a Sewage Disposal System or a Vacant Land Approval letter detailing the results of the Health Department evaluation.”
    • Required — Installing or repairing an onsite sewage disposal system in Alcona County.
      “The Environmental Health Regulations require that property owners obtain a construction permit prior to installing or repairing an onsite sewage disposal system.”
  • Septic inspectionRequired

    Completed on-site sewage disposal systems in Alcona County within the DHD2 service area.

    • Final inspection must occur before covering or backfilling.
    • Inspection is arranged by mutual agreement with the health department and installer or property owner.
    • The system must be approved by final inspection before use.
    “A final inspection of the completed system must be conducted by District Health Department No. 2 staff prior to covering/backfilling”
    One more reviewed finding on this topic
    • Required — Completed onsite sewage disposal systems in Alcona County.
      “A final inspection of the completed system must be conducted by District Health Department No. 2 staff prior to covering/backfilling the sewage disposal system.”
  • Well permitRequired

    New or replacement residential or Type III public wells, other water supplies, and extensive repairs to existing wells in the DHD2 service area.

    • Application and permit must be obtained before construction.
    • Permit conditions may be specified during approval.
    • Type III public water supplies require a pre-drilling site visit and final inspection.
    • Case-by-case deviations may be granted under Michigan well construction code and must be documented in writing.
    “a person must apply for and obtain a water supply construction permit from District Health Department No. 2.”
  • Permit feesPublished (with conditions)

    Published Alcona County fee information located for roofing and solar permits; a complete current countywide fee schedule was not located.

    • Roofing application states the permit fee doubles if work starts before pulling a permit.
    • Solar panel installations require building and electrical permits plus plan review.
    • Solar panel fee is $10 per panel for 1–14 panels and $15 per panel for 15 or more panels.
    • Solar plan-review minimum is $300 for residential and $500 for commercial applications.

    solar panel fee for 1-14 panels: 10 USD per panel · solar panel fee for 15 or more panels: 15 USD per panel · residential solar plan review minimum: 300 USD · commercial solar plan review minimum: 500 USD

    “1-14 panels $10.00 each & 15 and over $15.00 each 7. Plan review minimum $300.00 residential application. 8. Plan review minimum $500.00 commercial application”
    One more reviewed finding on this topic
    • Published (with conditions) — DHD2 permits and environmental-health services in Alcona County.
      “For the current cost of any permit, please refer to the fee schedule located on this website”
  • Permit processPartial

    Alcona County building permit application and inspection process.

    • Online fillable forms are provided for building, electrical, mechanical, plumbing, and solar permits.
    • The county publishes inspection stages and timing requirements, including 24-hour notice before footing concrete and completion requirements for final occupancy inspection.
    • No complete plan-review timeline was located.
    “Online Fillable Forms Building Permit Electrical Permit Mechanical Permit Plumbing Permit Solar Residential Solar Commercial”
  • County-wide zoningPresent

    Zoning is administered at the township level (e.g., Alcona Township and Curtis Township zoning ordinances), consistent with Michigan's local zoning framework.

    Alcona Township Ordinances ↗Scouted from the county site, not yet independently re-checked

Michigan rules that apply here

  • Certificate of occupancyRequired

    A new building or altered building subject to the Michigan construction code.

    • The building or altered building may not be used or occupied until the code official issues a Certificate of Occupancy.
    • The permit holder or authorized agent must submit a written request after project completion.
    • The request must include applicable building, electrical, mechanical, plumbing, boiler, elevator, plan-review, and school fire-services project numbers.
    • The certificate cannot be issued until all fees are paid, permits are finaled, and permitted work is completed in accordance with the permit, code, and applicable laws and ordinances.
    • If an electrical, mechanical, plumbing, boiler, elevator, plan-review, or Fire Services project is not required, the request must state “not applicable.”
    “A new building or a building that is altered shall not be used or occupied until a Certificate of Occupancy is issued by the code official.”
  • Zoning districtsPartial

    Michigan's statutory zoning framework for counties, townships, cities, and villages; this does not identify the actual zoning districts adopted by each local government.

    • Actual zoning districts and district regulations are local and must be checked in the applicable county, township, city, or village ordinance.
    • The cited act's stated effective date is July 1, 2006.
    “to provide for the establishment in counties, townships, cities, and villages of zoning districts;”
  • Off-grid sanitationLimited

    Residential sanitary sewage disposal in Michigan without connection to a municipal sanitary sewer.

    • Sanitary sewage from toilets, sinks, showers, washing machines, and dishwashers must be directed to a municipal sanitary sewer or an onsite septic system.
    • An onsite septic system is subject to the EGLE-coordinated permitting and local-health-department permitting and inspection framework.
    • The source does not establish a statewide authorization for untreated discharge or arbitrary off-grid sanitation methods.
    “All sanitary sewage [...] must be directed to municipal sanitary sewer or to an onsite septic system.”
  • Mandatory utility hookupConditional

    Buildings and premises in Michigan that have plumbing fixtures or drainage piping.

    • Connection must be to a public sewer where available, or otherwise to an approved private sewage disposal system.
    • Plumbing work cannot begin until the appropriate enforcing agency issues a permit.
    • Local requirements may apply to water service and building sewer installation.
    “Every building in which plumbing fixtures are installed [...] shall be connected to a public sewer, where available, or an approved private sewage disposal system.”
  • Subdividing landRegulated (with conditions)

    Subdivision plats and the orderly development of subdivisions in Michigan.

    • The Michigan Office of Land Survey and Remonumentation administers applicable provisions of the Land Division Act, 1967 PA 288.
    • Staff conducts final reviews of plat maps for compliance with the Act.
    • Final plats are authorized for submission to the Register of Deeds for proper recordation.
    “Staff conducts final reviews of plat maps to ensure compliance with the Act and authorizes final plats to be submitted to the Register of Deeds for proper recordation.”
  • Campground & park staysLimited

    Tiny houses, including tiny houses built on wheels, proposed as resort cabins or similar occupancy in Michigan.

    • The source distinguishes tiny houses from recreational units and states they cannot be treated as recreational units even if built on wheels.
    • The tiny house must be built as a resort rather than a campground.
    • Local health department permitting for wells, septic tanks, and drainfields is required as applicable.
    • Local zoning, building, electrical, and plumbing permits and final approvals are required under local authorities.
    • The source does not establish statewide zoning permission or a statewide right to occupy a tiny house.
    “Local zoning, building, electrical, plumbing permits and final approvals under local authorities.”
  • county building authorityGeneral

    Michigan counties serving as building-code enforcing agencies for residential construction in unincorporated areas, subject to the Statewide Jurisdiction List and local/state jurisdiction assignments.

    • Before construction, a written building-permit application must be submitted to the appropriate enforcing agency.
    • A permit is also required when use or occupancy changes.
    • Ordinary repairs do not require a permit, but the stated structural, egress, plumbing, electrical, mechanical, and public-health/safety limitations apply.
    • The Michigan Building Code and Michigan Residential Code govern construction; county enforcement applies only where the Statewide Jurisdiction List designates county jurisdiction.
    “If COUNTY is indicated, that unit of government receives code enforcement services from a county enforcing agency.”

Inside cities and towns in Alcona County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Zoning districtsPublished

    Alcona Township zoning districts and district-based regulations.

    • This claim is limited to Alcona Township and is not a countywide zoning-district claim.
    • The ordinance states that its provisions apply to all districts of Alcona Township, subject to stated exceptions.
    “R-1 Single Family Residential R-2 Low to Medium Density Residential R-3 Multiple Family District R-4 Manufactured Housing District AG Agricultural District FR Forest Recreation C Commercial I Industrial”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Owner-builder exemption — Owner-builder exemptions from licensing or permit requirements in Alcona County.
  • Minimum dwelling size — Minimum dwelling-size requirements in Alcona County.
  • Minimum lot size — Minimum lot-size requirements in Alcona County.
  • Setbacks — Building and yard setbacks in Alcona County.
  • Lot coverage — Lot-coverage limits in Alcona County.
10 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Alcona County, Michigan

Is Alcona County a good place to live off-grid or homestead?

Alcona County scores 80/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and sparse surroundings — about 8,614 people within a 30-minute drive.

Do you need a building permit in Alcona County, Michigan?

Alcona County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by District Health Department No. 2. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Alcona County, Michigan?

Land in Alcona County runs about $3,069 per acre, based on the latest county data.

What is the water situation in Alcona County?

Alcona County gets about 31" of rain a year, with severe drought in roughly 1.4% of years.

How remote is Alcona County?

A representative private-land location has about 8,614 people within a 30-minute drive and 216,189 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Alcona County means bringing your own water and power. The kit we’d start with: