Alcona County, Michigan
Curtis Township is a township in Alcona County, Michigan. Curtis Township adopts its own zoning, so inside its limits Curtis Township’s rules apply, not the county’s. 18 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Alcona County page.
New buildings, renovations, and accessory buildings inside Curtis township (residential, commercial, agricultural).
“all buildings; new, renovation for commercial, residential, agriculture, and accessory buildings must obtain a building permit prior to starting construction.”
Land inside Curtis township's limits (Alcona County, Michigan). Curtis township administers its own zoning ordinance; the county does not zone land inside the township.
“this ordinance shall be known and may be cited as the “curtis township zoning ordinance””
Zoning districts inside Curtis township
“single family residential (sfr) mixed residential (mr) rural residential (rr) forest recreation (fr) agricultural (ag) neighborhood business (nb) central business-corridor commercial (cbcc) light industrial (i-1)”
Agricultural (AG) district inside Curtis township
minimum dwelling unit floor area: 924 sq ft
“ag agricultural 10 ac. 330 35 (i), (j) 25 7 (b)(h) 25 924 s.f. (d) 20%”
“minimum yard setbacks (in feet) minimum d.u. floor area maximum % of lot coverage front side (g) (m) rear (n) 24 25 7 (b)(h) 10 924 s.f. (d) 30%”
“rr rural residential 2 ac. 200 24 25 7 (b)(h) 10 924 s.f. (d) 20%”
Agricultural (AG) district inside Curtis township
minimum lot area: >= 10 acres
“ag agricultural 10 ac. 330 35 (i), (j) 25 7 (b)(h) 25 924 s.f. (d) 20%”
“sfr mr area width (ft.) max. height of structure at eves feet (a) 12,000 s.f. 100 single family 20,000 s.f two family multi-family minimum lot area”
“rr rural residential 2 ac. 200 24 25 7 (b)(h) 10 924 s.f. (d) 20%”
Agricultural (AG) district inside Curtis township
maximum lot coverage: <= 20 percent
“ag agricultural 10 ac. 330 35 (i), (j) 25 7 (b)(h) 25 924 s.f. (d) 20%”
“minimum yard setbacks (in feet) minimum d.u. floor area maximum % of lot coverage front side (g) (m) rear (n) 24 25 7 (b)(h) 10 924 s.f. (d) 30%”
Agricultural (AG) district inside Curtis township
maximum height of structure at eaves: <= 35 feet (footnotes (i) and (j) not reviewed)
“ag agricultural 10 ac. 330 35 (i), (j) 25 7 (b)(h) 25 924 s.f. (d) 20%”
Recreational vehicles on private land inside Curtis township
consecutive days: <= 15 days · calendar-year total: <= 90 days
“overnight camping on private property without a dwelling unit shall be an allowable use in all districts provided the recreational vehicle shall occupy such a parcel for not longer than fifteen (15) consecutive days and not more than a total of ninety (90) days in a calendar year, subject to the following conditions:”
Overnight camping on private land without a dwelling inside Curtis township
allowed consecutive days without permit: <= 15 days (renewable temporary camping permit needed beyond 15 days)
“for camping beyond a 15 day period a renewable temporary camping permit must be obtained from the zoning administrator, and displayed on a post with a reflective property address at the road at the property access drive.”
Mobile or manufactured homes placed on individual lots inside Curtis township
“no mobile home shall be located or placed in curtis township without prior completion of site preparation to include electric, water, sewage disposal and foundation to meet the current alcona county construction code.”
Building permits for construction inside Curtis township
“prior to the issuance of any building permit in the county, it shall be necessary for any applicant to first apply for and obtain a zoning permit from the zoning administrator in accordance with the provisions of this zoning ordinance.”
Curtis Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New homes and mobile homes placed inside Curtis township; the Alcona County construction code is the code the township ordinance points to.
“no mobile home shall be located or placed in curtis township without prior completion of site preparation to include electric, water, sewage disposal and foundation to meet the current alcona county construction code.”
Septic and water systems for buildings inside Curtis township, before a zoning permit is issued
“plans must be submitted to and approved by the responsible agencies. the written approval of such facilities by the district health department shall be filed with application for a zoning permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Curtis Township or Alcona County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Curtis Township publishes no rule on the point, not that none exists. Alcona County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Curtis Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.